B53 Boiler Q and A v3.pdf

PDF 97 KB Posted

Attached to
Steam Boiler Installation at USCG BASE Elizabeth City
Solicitation number
70Z08124Q00000142
Issued by

About this file

This document is a question and answer (Q&A) sheet related to the Steam Boiler Installation at USCG BASE Elizabeth City solicitation. The key details are:

The solicitation number is 70Z08124Q00000142 and the federal contract opportunity ID is 63c366f225c444f4bd93a36bf6fd87d0. The U.S. Coast Guard is seeking to install a steam boiler at Building 53 on their base in Elizabeth City, North Carolina. The contractor shall provide all labor, supervision, tools, equipment, material, transportation, incidentals, fees, permits, licenses, and insurance necessary to complete the installation. The procurement is a 100% small business set-aside with a NAICS code of 238220 and a size standard of $19.0M. The estimated cost range is between $30,000 to $34,000. Quotes must be submitted by noon Eastern Time on 07/03/2024. The Q&A sheet addresses specific questions about the boiler installation requirements, such as the need for pipe insulation and the preferred blowdown system configuration.

View the file

Other files

File Type Posted
B53 Boiler Ques and Answer v.2_Posted June 28.pdf PDF
B53 Boiler project Q A.docx DOCX document
DAVIS BACON ACT WD NC20240056.pdf PDF
DAVIS-BACON-ACT.pdf PDF
B53 Install Replacement Steam Boiler SOW.docx DOCX document
Construction clauses less than 35k.docx DOCX document
SF1442-24 70Z08124Q00000142.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG Base Elizabeth City, NC Bldg. 53 Boiler Installation Project Q & A Solicitation Number: 70Z08124Q00000142 Date: 7/2/2024

Questions & Responses

1. I did not see anything in the requirements that called for insulating the piping in the technical requirements. Should we include this in our pricing.

1. Answer: No pipe insulation required

2. Also how would the gov’t prefer the contractor to install the boiler’s blowdown system?

• Install manual calls for blowdown on the base of the LWCO.

• Does the gov’t want a bottom blowdown installed?

• Does the gov’t intend to utilize the skim tapping?

3. Answer: Contractor shall install the boiler in accordance with the manufacturer’s recommendations, NC Boiler & Mechanical Codes, and standard boiler installation practices.