This is a Pricing Schedule for unplanned dockside availability services for the USCGC BENJAMIN BOTTOMS (WPC-1132) during FY2026. The contract covers services at the San Diego, CA location with a period of performance from August 11, 2026 through September 22, 2026. The pricing schedule includes definite line items such as towing services, Main Drive Engine (MDE) renewal work, composite labor rates, travel and per diem, and a GFP (Government Furnished Property) report requirement, though all unit prices are shown as $0.00 in the template version provided.
The document establishes an open and inspect repairs pricing structure with two primary cost components: a composite labor rate (966 hours available) and a material markup/handling fee based on a percentage of $40,020.00. Contractors must provide their own labor rate in dollars per hour and material markup/handling fee as a percentage. The cost estimate template includes detailed labor categories (Engineering Technician, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, and General Labor/Helper/Rigger) with assumed G&A and profit factors of 15% and 10% respectively. Geographic labor rate codes are provided for multiple U.S. shipyard locations, with San Diego listed at a rate code of 55. This schedule serves as the pricing framework for evaluation purposes throughout the contract's performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QPBPL00490005.pdf | ||
| 70Z08026QPBPL00490004.pdf | ||
| Attachment 2-Spec Rev2.pdf | ||
| NBSD Pier_QWN3.jpg | JPG image | |
| NBSD Map QWN3.pdf | ||
| 70Z08026QPBPL00490003.pdf | ||
| 70Z08026QPBPL00490002.pdf | ||
| Attachment 2-Spec Rev1.pdf | ||
| 70Z08026QPBPL00490001.pdf | ||
| Attachment 1-Schedule of Services Rev1.xls | XLS spreadsheet | |
| Attachment 1-Schedule of Services_BOTTOMS.xls | XLS spreadsheet | |
| Attachment 2-Specification_BOTTOMS.pdf | ||
| Attachment 3-SOW Addendum.pdf | ||
| 70Z08026QPBPL0049_SOL.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BENJAMIN BOTTOMS (WPC-1132) UNPLANNED DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Deleted | JOB | 0 | $0.00 | |
| D-002 | Deleted | JOB | 0 | $0.00 | |
| D-003 | Towing Services, Provide | JOB | 1 | $0.00 | |
| D-004 | MDE Nr.2, Renew | JOB | 1 | $0.00 | |
| O-005 | MDE Nr.1, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Labor Rate
| Unit Price: $________; Quantity: 966; Unit of Issue: Hour; Extended Price: $____________ | Hour | 966 | $0.00 | |
| OA/G-002 | Material Markup/Handling Fee |
Unit Price: $40,020.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$40,020.00 X percentage quoted]: $______________ | $40,020.00 | Percent | $0.00 | |
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 |
&C(7/9/2026) Draft-0 - Page &P of &N Contractors will enter labor rate here.
Contractors will enter material markup/handling fee here.
Enter company name here.
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .