70Z08026QPBPL00490002.pdf

PDF 669 KB Posted

Attached to
DOCKSIDE: USCGC BENJAMIN BOTTOMS UPDS FY26 - NR2 MDE RENEW
Solicitation number
70Z08026QPBPL0049
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the U.S. Coast Guard, issued by USCG-SFLC-CPD 1 in Norfolk, Virginia on July 21, 2026. The amendment (70Z08026QPBPL00490002) addresses Solicitation 70Z08026QPBPL0049, dated July 20, 2026, with requisition number 52000PR260026788. The amendment is not extending the receipt deadline for offers and specifies that the hour and date for submitting offers remain unchanged.

The amendment's sole purpose is to provide responses to vendor questions submitted during the solicitation process. Four questions and answers are documented: (1) regarding pier specifications, crane operations, equipment staging, and parking at U.S. Naval Base San Diego (answer indicates ongoing coordination with Naval Base Port Operations with no current sketches available and potential requirement to use Navy Base crane services); (2) clarifying that Work Item 4, Section 3.2.5.5 requires only touch-up preservation under engines and engine skids, not additional engine room bilge preservation; (3) confirming that exhaust silencer insulation pads have not been reported as needing replacement and will be inspected per Code of Federal Regulations requirements; and (4) confirming that Work Item 2 sea trials are not required, as Work Item 4, paragraph 3.2.8.1, already includes mandatory sea trials satisfying all requirements. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
70Z08026QPBPL00490005.pdf PDF
70Z08026QPBPL00490004.pdf PDF
Attachment 2-Spec Rev2.pdf PDF
Attachment 1-Schedule of Services Rev2.xls XLS spreadsheet
NBSD Pier_QWN3.jpg JPG image
NBSD Map QWN3.pdf PDF
70Z08026QPBPL00490003.pdf PDF
Attachment 2-Spec Rev1.pdf PDF
70Z08026QPBPL00490001.pdf PDF
Attachment 1-Schedule of Services Rev1.xls XLS spreadsheet
Attachment 1-Schedule of Services_BOTTOMS.xls XLS spreadsheet
Attachment 2-Specification_BOTTOMS.pdf PDF
Attachment 3-SOW Addendum.pdf PDF
70Z08026QPBPL0049_SOL.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z08026QPBPL00490002

Summary of Changes

QUESTIONS & ANSWERS

1. Can you provide pictures, sketches or furnish any information regarding the pier where the actual lifts will be made. Are there any setback requirements for a crane from the edge of the pie? Are there any weight limitations for a crane on the pier/bulkhead? Is there suitable lay down space for 4 engines and WERP plates, silencers, Canopy and Connex Storage containers, within the boom swing radius for the crane? Will there be parking for contractor and subcontractors work vehicles pier side?

ANSWER: Currently working with US Naval Base San Diego Port Operation to reserve a pier to accommodate all requirements for crane ops, contractor equipment, and staging of engines and contractor parking. No current sketches or pictures are available.

Crane: no confirmation yet; that the Navy Base will allow an outside commercial crane; port services will more than likely require we utilize their crane.

2. Please clarify Work Item 4 – Section 3.2.5.5 – Work Item/Section title states Clean and Touch up paint bilge under engines. First sentence of the paragraph states to clean and pressure was all engine room bilge surfaces.

Is the intent to just do the bilges under the engines once they are removed?

ANSWER: Intent is for touch up preservation under engine (bilge) and engine skid; no additional preservation to remaining engine room bilges is required.

3. Work Item 4 – Section 3.2.5.6 Renewals – states to replace the Exhaust Silencer Insulation. Have these Insulation pads been inspected and determined to need replacement? Past projects have had this requirement removed and were inspected at the time silencers were removed from vessel.

Several cutters did not require replacement after inspection, thereby saving the CG a large sum of money.

ANSWER: Insulation pads have not been reported to need replacement. CFR condition.

4. Work Item 2 – Sea Trial – Work Item 4 3.2.8.1 Already requires a Sea Trial, with pricing included in the Item. Is there anything the CG is expecting to be performed in Work Item 2 that already isn't performed in Work Item 4?

ANSWER: Work item #2: Not required. Work Item #4: para 3.2.8.1 sea trials will satisfy the requirements.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QPBPL00490002
EFFECTIVE_DATE: 2026-07-21T15:22:00.000-04:00
REF_PR_NUM_T: 52000PR260026788
SOL_DOCUMENT_NUMBER: 70Z08026QPBPL0049
SOL_OPEN_BID_DATE: 2026-07-20T15:32:50.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QPBPL0049
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-The purpose of this amendment is to provide responses to vendor questions. All other terms and conditions remain the same.
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR: 70Z080 CPD 1 - Norfolk, VA

Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite 550 Norfolk, VA, 23510, US

AMD_ISSUING_OFFICE_LOCCODE: 70Z080

File details come from the government source that posted it. Updated .