Attachment 1-Schedule of Services Rev1.xls
XLS spreadsheet 63 KB Posted
- Solicitation number
- 70Z08026QPBPL0049
About this file
This is a Pricing Schedule for unplanned dockside availability services for the USCGC Benjamin Bottoms (WPC-1132) during Fiscal Year 2026. The contract covers a period of performance from August 11, 2026 through September 22, 2026, with the place of performance located in San Diego, California. The schedule includes definite line items for sea trial performance support, towing services, renewal of Main Diesel Engine (MDE) components (Nr. 1 and Nr. 2), composite labor rates, government-furnished property reporting, and travel/per diem expenses. All definite and option items are currently priced at $0.00 in the template.
The pricing structure incorporates an open and inspect repairs section with two primary cost elements: a composite labor rate (OA/G-001) for 966 hours that contractors must populate with their proposed hourly rate, and a material markup/handling fee (OA/G-002) with a fixed base of $41,730.00 applied against a percentage to be quoted by the contractor. The document includes a cost estimate breakdown template that identifies labor categories (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, general labor, and supervision/QA/NDT), materials and subcontractor costs, and geographic wage rate variations across 26 U.S. locations, with assumed factors of 15% for G&A and 10% for profit built into the composite labor rate calculation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QPBPL00490005.pdf | ||
| 70Z08026QPBPL00490004.pdf | ||
| Attachment 2-Spec Rev2.pdf | ||
| Attachment 1-Schedule of Services Rev2.xls | XLS spreadsheet | |
| NBSD Pier_QWN3.jpg | JPG image | |
| NBSD Map QWN3.pdf | ||
| 70Z08026QPBPL00490003.pdf | ||
| 70Z08026QPBPL00490002.pdf | ||
| Attachment 2-Spec Rev1.pdf | ||
| 70Z08026QPBPL00490001.pdf | ||
| Attachment 1-Schedule of Services_BOTTOMS.xls | XLS spreadsheet | |
| Attachment 2-Specification_BOTTOMS.pdf | ||
| Attachment 3-SOW Addendum.pdf | ||
| 70Z08026QPBPL0049_SOL.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BENJAMIN BOTTOMS (WPC-1132) UNPLANNED DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Deleted | JOB | 0 | $0.00 | |
| D-002 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-003 | Towing Services, Provide | JOB | 1 | $0.00 | |
| D-004 | MDE Nr.2, Renew | JOB | 1 | $0.00 | |
| O-005 | MDE Nr.1, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Labor Rate
| Unit Price: $________; Quantity: 966; Unit of Issue: Hour; Extended Price: $____________ | Hour | 966 | $0.00 | |
| OA/G-002 | Material Markup/Handling Fee |
Unit Price: $41,730.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$41,730.00 X percentage quoted]: $______________ | $41,730.00 | Percent | $0.00 | |
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 |
&C(7/9/2026) Draft-0 - Page &P of &N Contractors will enter labor rate here.
Contractors will enter material markup/handling fee here.
Enter company name here.
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .