This is a Schedule of Services pricing template for the USCGC REEF SHARK (WPB-87) drydock availability in FY2026. The template requires contractors to provide unit pricing for 47 definite line items and 3 option line items covering comprehensive vessel maintenance and repairs, including hull plating inspection and preservation, tank cleaning and inspection, propulsion system overhaul (shaft bearings, bearing carriers, propellers, and rudder assemblies), electrical system thermographic inspection, HVAC system maintenance, watertight closure renewal, deck and superstructure preservation, and miscellaneous equipment modifications. Contractors must also propose a composite labor rate ($/hour) and a material markup/handling fee percentage. Over and above/growth work is available at the proposed labor rate for an estimated 2,482 hours, with a material markup applied to any additional material costs. The drydock is scheduled for 91 days of availability beginning June 2, 2026.

The pricing template includes a foreseeable costs worksheet that contractors must complete to account for distance-related expenses based on the drydock facility location relative to government reference points in Juneau, Alaska (PE location), Norfolk, Virginia (Contracting Officer location), and the vessel's homeport in Alaska. Foreseeable costs include Port Engineer/Contracting Officer transportation (air and car travel), per diem for crew and government representatives, cutter operation costs, family separation allowances, and crew home visit transportation. The worksheet provides distance factor calculations, reference rates (e.g., $69.00 per nautical mile for cutter operations, $0.58 per driving mile, $8.33 daily family separation allowance), and directives for contractors to research current GSA per diem rates, airfare rates, and nautical distances. The total evaluated price combines all definite and optional line item pricing plus calculated foreseeable costs, with the worksheet currently showing a family separation allowance total of $2,540.65 as the only cost entered.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC REEF SHARK (WPB-87) DRYDOCK AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (Side Scan), Ultrasonic TestingJOB$0.00
O-002Ultrasonic Thickness Measurements, PerformJOB$0.00
D-003U/W Body, Preserve, 100 percentJOB$0.00
D-004Hull Plating Freeboard, Preserve, 100 PercentJOB$0.00
D-005Tank, Dirty Oil, Clean and InspectJOB$0.00
D-006Tank, Oily Water, Clean and InspectJOB$0.00
D-007Tanks, MP Fuel Service, Clean and InspectJOB$0.00
D-008Decks, Exterior (Main Deck), PreserveJOB$0.00
D-009Superstructure, Preserve, 100%JOB$0.00
D-010Capastic Fairing, Depth Sounder, RenewJOB$0.00
D-011Watertight Closures, AssessJOB$0.00
D-012Mast, Preserve (“100%”) – Contractor Interference RemovalJOB$0.00
O-013Main Engine/Reduction Gear, RealignJOB$0.00
D-014Intermediate Water-Lubricated Propulsion Shaft Bearings, RenewJOB$0.00
D-015Aft Water-Lubricated Propulsion Shaft Bearings, RenewJOB$0.00
O-016Intermediate Bearing Carriers, RenewJOB$0.00
O-017Aft Bearing Carriers, RenewJOB$0.00
D-018Propulsion Shafts, RenewJOB$0.00
D-019Stern Tube Interior Surfaces, Preserve, 100 PercentJOB$0.00
D-020Propellers, RenewJOB$0.00
D-021Electrical Power Distribution System, Thermographic Inspection, 450 VAC And BelowJOB$0.00
D-022Fathometer Transducer, RenewJOB$0.00
D-023Speed Log, Skin Valve, RenewJOB$0.00
D-024Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and InspectJOB$0.00
D-025Ducting, HVAC System, CleanJOB$0.00
D-026Sea Water System, Perform MaintenanceJOB$0.00
D-027Rudder Assemblies, RenewJOB$0.00
D-028Stern Launch Door, Remove, Inspect and ReinstallJOB$0.00
D-029Grey Water Holding Tanks, Clean and InspectJOB$0.00
D-030Sewage Holding Tanks, Clean and InspectJOB$0.00
D-031Grey Water Piping, Clean and FlushJOB$0.00
D-032Sewage Piping, Clean and FlushJOB$0.00
D-033Cathodic Protection/Zinc Anodes, RenewJOB$0.00
D-034DrydockJOB$0.00
D-035Temporary Services, Provide - CutterJOB$0.00
D-036Sea Trial Performance, Support, ProvideJOB$0.00
D-037Superstructure Plating, Pilothouse, RenewJOB$0.00
D-038Watertight Closure, RenewJOB$0.00
D-039Handrail and/or Stanchion, D-Rings and Pigtails, RenewJOB$0.00
D-040Critical Coated Surface(s), PreserveJOB$0.00
D-041Flood Lights, ModifyJOB$0.00
D-042Interior Deck Covering System And Joiner Deck, RenewJOB$0.00
D-04324VDC Distribution System, UpgradeJOB$0.00
D-044Unmanned Space Ventilation ModifyJOB$0.00
D-045Intrusion Detection System, ReplaceJOB$0.00
D-046Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System ConfigurationJOB$0.00
O-047RHIB Notch Skid Pad Stud(s), RenewJOB$0.00
O-00AComposite Labor RateHour0$0.00
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:

Over and Above/Growth Labor Rate

Unit Price: $________; Quantity: 2482; Unit of Issue: Hour; Extended Price: $____________Hour2482$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee

Unit Price: $12,662.12; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$12,662.12 X percentage quoted]: $______________Percent$0.00
Total Price for Over and Above/Growth$0.00

&C(9/30/2025) Draft-1 - Page &P of &N Contractors will enter labor rate here.

Contractors will enter material markup/handling fee here.

Do Not Change this cell.

Foreseeable Costs

FORESEEABLE COST WORKSHEET
USCGC REEF SHARK DDFY26
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
DISTANCE FACTORS FOR: 11465 Harbor Rd, Juneau AK 99801
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
NUMBER OF DAYS OF AVAILABILITY91
(1) Port Engineer/COR Transportation: AIR TRAVEL
(Applicable if > 50 miles from PE address

(PE's desk location)

A. Number of CG Representatives from NESU:A=1
B. The number of round trips between the contractor's facility and NESUB=1
C. A multiplied by B:AxB=C=1
D. Travel cost per trip:D=
E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$0.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=1
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=
C. Travel cost per driving mile (rate at $0.58 per mile)$0.580$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=13
B. Total number of day(s) in drydock.B=91
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=$0.00
C.1.1. Enter Lodging Daily Per Diem Rate
C.2.1. Enter Meals & Incidentals Total Daily Rate
C.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate
D. AxBxC= D: (if >50 miles from NESU)D=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=1
B. Total number of KO travel days:B=3
C. Transportation cost for KO travelC=
D. Per diem cost at place of performance, per dayD=$0.00
D.1.1. Enter Lodging Per Diem Rate
D.2.1. Enter Meals & Incidentals Total Daily Rate
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate
E. A [(B*D) + C] =E=$0.00
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=$69.00
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=5
B. Number of Days for Availability minus 30 days if availability is greather than 30 days:B=61
C. A multiplied by B = C (Daily FSA rate of $8.33)C=$2,540.65
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=5
B. Number of Homeport Visits:B=2
C Mileage to homeport = (Roundtrip Ticket Cost)C=
D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$0.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$2,540.65
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$2,540.65
Total Contractor Quoted/Proposal Price:$0.00
TOTAL EVALUATED QUOTE/PRICE$2,540.65

Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.

Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58

- located > 150 miles from ship's homeport, utilize https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program