AMENDMENT0001 page 2 JOHN MCCORMICK.pdf
PDF 104 KB Posted
- Attached to
- USCGC JOHN MCCORMICK (WPC-1121) DD2 FY23
- Solicitation number
- 70Z08023QPBPL0011
About this file
This combined synopsis/solicitation concerns drydock repairs for the USCGC John McCormick. The Coast Guard is seeking quotations for work including removal and inspection of reverse osmosis equipment in the generator room. The solicitation number is 70Z08023QPBPL0011 and responses are due in accordance with Federal Acquisition Regulation part 12.6 and part 13.5 as supplemented by additional information. Repairs will be conducted at Alaska Shipyard per Section 8220 and involve tasks such as removal of equipment from foundations to access bilge and structural areas below for inspection. The document provides responses to questions clarifying that a modular docking cradle will not be supplied but pictures of reverse osmosis equipment can be requested, and this unit is believed to be on a skid removable as a single piece once piping is disconnected.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70Z08023QPBPL0011
USCGC JOHN MCCORMICK (WPC-1121) DRYDOCK REPAIRS FY23
AMENDMENT 0001
Response to Questions/Requests for Clarification:
1. Work Item D0017 Reference Drawing 154 WPC 997-004 appears to be a modular docking cradle designed to be containerized for shipment. Will USCG be making this cradle available to Contractors to utilize for this availability?
Question 1 response: We are not sending a modular docking cradle for the project. That may be possible in the future, but will not be provided for JOHN MCCORMICK’s FY23 project.
2. Task 2 States to “Remove the RO equipment in the Generator Room from its foundation to gain access to all associated bilge and foundation structure beneath and inspect as described as above." Can the Government please clarify the quantity and nature of equipment to be removed?
Question 2 response: I believe the RO is on a skid that can be removed as one unit once the associated piping is disconnected. I can request the crew send a picture of the RO for the vendor(s). Otherwise, they’ll have to use the drawings provided to get an idea of the removal effort required to satisfy that work item.