Attachment 24 - Descriptions for Schedule of Supplies_Services.pdf

PDF 188 KB Posted

Attached to
Requst for Proposal (RFP) Propeller/Blade Set Overhaul
Solicitation number
70Z08021R21313B00_RFP
Issued by

View the file

Other files

File Type Posted
SF 30 Amendment A00004.pdf PDF
Amendment A00003 Questions_Answers.pdf PDF
Attachment 12 - Schedule of Supplies_Services 70Z08021R21303B00 Amendment A00002.xlsx XLSX spreadsheet
SF 30 Amendment A00003.pdf PDF
SF 30 Amendment A00002.pdf PDF
Amendment A00002 Questions_Answers.pdf PDF
Solicitation 70Z08021R21303B00 UPDATED.pdf PDF
SF 30 Amendment A00001.pdf PDF
Solicitation 70Z08020R21297B00 FINAL.pdf PDF
Attachment 11 - R-245-0128 Rev G - 270.pdf PDF
Attachment 12 - Schedule of Supplies_Services 70Z08021R21303B00.xlsx XLSX spreadsheet
Attachment 16 - Order Placement Procedures.pdf PDF
Attachment 14 - BARCODE SPEC D-000-0100-Rev.pdf PDF
Attachment 8 - 2010012222440_PrpFxdPtchRprLH_110A_R.pdf PDF
Attachment 6 - REV A_R-245-0493 225 WLB.pdf PDF
Attachment 7 - 2010014570573_PrpFxdPtchRprRH_87_R.pdf PDF
Attachment 20 - 160 WLIC prop Inspection Report.pdf PDF
Attachment 1 - 65 WYTL Propeller Overhaul 2020.pdf PDF
Attachment 18 - 75_65 WLIC_WLR prop Inspection Report.pdf PDF
Attachment 17 - 65 WYTL Prop Inspection Report.pdf PDF
Attachment 13 - SF 1424 - Inventory Disposal Report.pdf PDF
Attachment 5 - 160 WLIC Propeller Overhaul 2020.pdf PDF
Attachment 21 - WLR F prop Inspection Report.pdf PDF
Attachment 9 - R-245-0127 - 210A.pdf PDF
Attachment 2 - 65 75 WLIC WLR Propeller Overhaul 2020.pdf PDF
Attachment 10 - R-245-0074 - 210B.pdf PDF
Attachment 23 - 110 Propeller Inspection Compliance Form - v6 (5-21-2020).pdf PDF
Attachment 3 - 75F WLR Propeller Overhaul 2020.pdf PDF
Attachment 4 - 140 WTGB Propeller Overhaul 2020.pdf PDF
Attachment 22 - 87 Propeller Inspection Compliance Form v3 (5-21-2020).pdf PDF
Attachment 19 - 140 WTGB Prop Inspection Report.pdf PDF
Attachment 15 - Past Performance Questionnaire.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Supplies/Services

The following requirements shall apply to all contract line items (CLINs), including the base and option years.

Specifications and drawings will be identified under each CLIN.

0001 through 4019 Open/Inspect/Report (OIR) – In accordance with the specification, the Contractor shall provide all necessary equipment and labor at a loaded composite hourly rate including profit, G&A and overhead, required to perform an inspection on each item inducted for overhaul. The Contractor shall inspect the condition of the shipping contain, uncrate the propeller/CPP blade set, prepare and submit the OIR for approval. The OIR shall de detailed, report the findings and include the associated costs to overhaul the item i.e. labor hours and materials. The Contractor shall not proceed with overhaul until written authorization in the form of a modification is received from the Contracting Officer (KO).

0001A through 4019A Overhaul – In accordance with the specification, the Contractor shall provide all necessary equipment and labor at a loaded composite hourly rate, including profit, G&A and overhead, to arrive at a total price to overhaul, test, prepare and submit a Final Inspection Report, preserve, package, mark and delivery each propeller or CPP blade set.

The estimated number of hours included in this CLIN are for evaluation purposes only and is the Government’s estimate of the average number of hours expected for each overhaul. This number will vary based on the condition of the asset and shall be negotiated on an individual basis after receipt of the OIR(s).

0001B through 4019B Materials – In accordance with the specification, the Contractor shall provide all materials required to overhaul, test, prepare and submit a Final Inspection Report, preserve, package, mark and delivery each propeller or CPP blade set.

This cost is for evaluation purposes only and the total cost of materials shall be negotiated on an individual basis after the receipt of the OIR but shall not, regardless of condition, exceed the amount proposed.

CONTINGENCY CLINS- All Contingency CLINs shall include prices for the base and all option years but shall NOT be included in the total unit prices or total prices for the base, option years and contract estimated total value.

0001C through 4019C Replace Shipping Container – The contractor shall determine in the OIR if the shipping container requires replacement based on condition.

0001D through 4019D Beyond Economical Repair (BER) propeller or CPP blade set – Prepare for shipment, re-create and return any propeller or CPP blade set that is determined by the KO to be BER. No overhaul costs shall be included.

Any propeller or CPP blade set determined to be BER may be authorized by the KO for scrapping at the

Contractor’s facility and a scrap credit shall be negotiated in accordance with the current price of metals. The credit shall be applied to the OIR CLIN. The Contractor shall complete and submit a SF-1424 (Attachment 13) within ten (10) calendar days from authorization to scrap the material.

File details come from the government source that posted it. Updated .