Vent Cleaning Questions.docx
DOCX document 33 KB Posted
- Solicitation number
- 70Z05221QSA242000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Good Morning Jason.docx | DOCX document | |
| SF18 REQUEST FOR QUOTATION - VENT CLEANING.docx | DOCX document | |
| DRAWING 3181 Ventilation.pdf | ||
| Wage Rates Barnstable 6-24-2020.docx | DOCX document | |
| HSAR CLAUSE 3052.212-70.docx | DOCX document | |
| DRAWING 3172 Second Floor.pdf | ||
| Air Vent Cleaning SOW.doc | DOC document | |
| DRAWING 3172 First Floor.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70Z05221QSA242000- AIR VENT CLEANING OF AVIATION HANGARS
Questions:
1. Please provide 2020/2021 labor wage determination for Barnstable County you want to be used for the project. There is not an exact wage description for ventilation cleaning. Use the closest job description that relates to this job.
2. Are you going to issue an addendum referencing that the air duct cleaning should be done IAW NADCA Standard ACR20013? The contractor shall perform all maintenance procedures in accordance with all Federal, State, and Local regulations governing the cleaning and sanitizing of Heating, Ventilation, Air Conditioning and Refrigeration systems.
3. Please confirm that duct work in crew rest rooms and area to include the large training room are part of the solicitation and need to be completed in the scope, as the drawings do not show ductwork in these areas. All ducting in those areas will need to be cleaned.
4. Licensing, are you going to issue at statement/addendum to the Solicitation that all contractors should be NADCA certified with ASCS on-site managing the project? All contractors must be licensed in HVAC cleaning.
5. Past Cleaning- during our pre-walk meeting, it was stated that the Coast Guard does not believe that the Air vent ducts have ever been cleaned, therefore we should assume that all air vent ducts need to be cleaned. Since cleaning all of the air vent ducts should occur in the project, can we eliminate the need for visual (pre-work) inspection provided we perform a pre-post inspection and record each with pictures for each area? If not, can the visual inspection be performed to coincided with pre-construction meeting? If pre/post inspection pictures are provided the Coast Guard will consider the pre-work inspection criteria met. This can be accomplished at the time of the pre-construction meeting.
6. Working Hours- during the pre-walk meeting, it was discussed moving the hours of work to start after 4:00 pm as the equipment is loud and it would be difficult for CG personnel to work during the course of the cleaning process, please confirm. As per the statement of work and the walk through we can adjust the work hours in certain areas.
7. What is your minimum insurance requirement for this project? No requirement listed. There is no minimum, contractors just need to show proof of insurance.
8. Bonding, the Solicitation does not list a bond requirement, will you require a bond? No bond will be required.
9. Temporary Protection- You indicate that the contractor shall provide temporary protection to ensure safety of government personnel, what about the equipment and office areas, can you please expand upon what needs to be protected during the project. The contractor will ensure there is no damage or contamination to any Coast Guard property such as computers, chairs desks, etc.
10. Are certified payrolls required to be submitted for this project, if so at what interval? No payrolls are required for this job.
11. On-site supervision, can the site superintendent be a working foreman or do you require a non-working supervisor? The site supervisor can be a working foreman.
12. Equipment electrical needs, during the walk thru, we discussed the need to be able to tie-in (pigtail) onto the existing CB panel to run power for our equipment, confirm CB panel power is available and we can tie-in (pigtail) onto it. Also, please confirm base electrician can be available to assist tie-in if needed. Yes, on a case by case basis. You will need a licensed electrician to help.
13. Please confirm the requested lump sum price is to include only the Scope of work items and any Add/Alt items priced will not be in the lump sum. Additional items were added for bid.