Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment 0010

70Z04722RCGRADP00

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE SOLICITATION:

1) Amendment 0007, response to Question 50 states “Bay floors shall be sloped to sump pit or channel.

Several sump pits and/or trench drains would be acceptable.” The Government, however, did not answer the question to the minimum volume the pits were to be sized for the storage of hydroblast process water. For bidding purposes, should the Contractor assume pit storage volume should be equivalent to the 9’ x 9’ x 42’ mobile storage tank? If not, please provide the minimum volume so we can properly price

RESPONSE: The Government provided the response for the minimum volume in Amendment 0009 with

Amendment Number 1 which indicated the following:

Section 01800, Paragraph 1.8.6.5 (Question #7)

DELETE: N/A

ADD: Add a last sentence, as follows: ‘Sump pits shall have a minimum capacity of 200-Gallons (US).

2) Amendment 0007, response to Question 34 does not answer the question regarding responsibility of electrical consumption cost during construction. Can the Government confirm the contractor is not responsible for any electrical consumption cost during construction? The Government responded that the RFP

Specification 01500 – 1.3.5.1 states “The Contractor will be allowed to connect to the CG Yard’s electrical distribution system without charge, but the Contractor shall limit power usage to 120/208 volt

AC, single phase, 60 hertz, 50 amperes.” The response does confirm the Contractor is not responsible for electrical consumption costs during construction but then limits the use of the electric. Construction trailers use more than the listed 120/208 V, single phase, 50 amps. Can you please have the technical team confirm the

Contractor will not be charged for the additional electrical usage over this limit?

RESPONSE: If the Contractor’s construction trailers use more than the listed 120/208 V, single phase, 50 amps, the Government will allow the connection. The Contractor will not be charged for the additional electrical usage over this limit.

Note

Failure to acknowledge amendments may be cause for rejection of your offer

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0010
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: Fast Response Cutter (FRC), Recurring Depot Availability Program (RDAP), USCG Yard, Curtis Bay, MD

ADDITIONAL INFORMATION FOR AMENDMENT 0010 IS CONTINUED ON PAGE 2.

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04722RCGRADP00
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 02/28/2022
Dated9B[0]: 12/06/2021
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .