Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment 0009

70Z04722RCGRADP00

SOLICIATION 70Z04722RCGRADP00 IS AMENDED AS FOLLOWS:

1. Section 01800, Paragraph 1.8.6.5 (Question #7)

DELETE: N/A

ADD: Add a last sentence, as follows: ‘Sump pits shall have a minimum capacity of 200-Gallons (US).

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE SOLICITATION:

1) Amendment 0007, response to Question 1 follow-up, Section 01800, Parts 1.16.5.3 & 1.16.5.6 which covers three cables (12-str SMOF, 25-pr Copper & 24-str MMOF 62.5u) that are to be brought to the proposed

RDAP building from some connection point somewhere within the Yard which we assume is at Telecom

Manhole 32A. Can the Government confirm the project scope is to include the construction of a new ductbank from existing Telecom Manhole 32A to the new RDAP building for these three cables?

RESPONSE: Tie-in to Telecom Manhole 32A is a reasonable assumption.

2) Amendment 0007, response to Question 1 follow-up, Section 01800, Parts 1.16.5.3 & 1.16.5.6 which covers three cables (12-str SMOF, 25-pr Copper & 24-str MMOF 62.5u) that are to be brought to the proposed

RDAP building from some connection point somewhere within the Yard which we assume is at Telecom

Manhole 32A. Can the Government confirm the splice / termination point of these three cables is to be done at

Telecom Manhole 32A in order to complete the connection to the Yard communications networks? If the cables cannot be spliced / terminated in the manhole what building should the cables terminated?

RESPONSE: Splice/Termination at Telecom Manhole 32A is a reasonable assumption.

3) Amendment 0007, response to Question 6 states "However, the blast liner has to be mounted to a rigid durable substrate." Can the Government please confirm installation shall be provided based on the Blast Room

Liner manufacturer's recommendations?

RESPONSE: Yes.

4) Amendment 0007, response to Question 19 and Question 44 refers to Attachment M – Hydrant Flow

Test which included fire hydrant flow test information from September 2021. Upon our review of the provided information the data does not provide a residual pressure with any of the flows nor does it show a “gauge” hydrant (this would be a separate hydrant that the static and residual pressures would be measured. Our assumption is the static pressure was measured at each hydrant that was flowed. Attachment M is also missing the supply pipe sizes to the tested hydrants. Can the Government please provide the residual pressures with the accompanying static pressures so that a determination can be made to whether a fire pump is needed? If this information cannot be provided, please direct us whether a fire pump should be provided for bidding purposes since it cannot be determined from the information provided?

RESPONSE: The information cannot be provided. Refer to RFP 01800, Paragraph 1.10.3.1.1 for the fire pump.

5) Amendment 0007, response to Question 31 states "Contractor shall carry 90K in their bid proposal.

Estimate is based on 600 feet of HDPE pipe, fittings, press regulator valves, trenching, and pavement patch."

Can the Government please confirm the allowance includes the cost of the BGE utility meter?

RESPONSE: Yes.

Amendment 0009

70Z04722RCGRADP00

6) Amendment 0007, response to Question 34 does not answer the question regarding responsibility of electrical consumption cost during construction. Can the Government confirm the contractor is not responsible any electrical consumption cost during construction?

RESPONSE: Correct. RFP Specification 01500-1.3.5.1 states, ‘The contractor will be allowed to connect to the CG Yard's electrical distribution system without charge, but Contractor shall limit power usage to

120/208 volt AC, single phase, 60 hertz, 50 amperes.’

7) Amendment 0007, response to Question 50 states "Bay floors shall be sloped to sump pit or channel.

Several sump pits and/or trench drains would be acceptable." The Government however did not answer the question as to the minimum volume the pits were to be sized for the storage of hydroblast process water. For bidding purposes should the Contractor assume pit storage volume should be equivalent to the 9' x 9' x 42' mobile storage tank? If not, please provide the minimum volume so we can properly price.

RESPONSE: See Amendment.

8) Amendment 0007, response to Question 51 states "The only location that the RFP requires epoxy coated reinforcing bar and marine mix concrete is the waterfront." Waterfront can be interpreted in different ways (the transfer platform slab at the current Shiplift Expansion project includes epoxy rebar). Please confirm epoxy coated reinforcing and marine mix concrete is not required for the boat work bay slab-on-grade or sump pits?

RESPONSE: Confirmed.

9) Amendment 0007, response to Question 51 states "The only location that the RFP requires epoxy coated reinforcing bar and marine mix concrete is the waterfront." Waterfront can be interpreted in different ways (the transfer platform slab at the current Shiplift Expansion project includes epoxy rebar). Please confirm epoxy coated reinforcing and marine mix concrete is not required for the rail transfer slab-on grade?

RESPONSE: Confirmed.

10) Amendment 0007, response to Question 51 states "The only location that the RFP requires epoxy coated reinforcing bar and marine mix concrete is the waterfront." Waterfront can be interpreted in different ways (the transfer platform slab at the current Shiplift Expansion project includes epoxy rebar). Please confirm epoxy coated reinforcing and marine mix concrete is not required for the marine lift travel way slab-on-grade?

RESPONSE: Epoxy coated reinforcing bar and marine mix concrete is not required for the marine lift travel way slab-on-grade.

Note

Failure to acknowledge amendments may be cause for rejection of your offer

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0009
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: Fast Response Cutter (FRC), Recurring Depot Availability Program (RDAP), USCG Yard, Curtis Bay, MD

ADDITIONAL INFORMATION FOR AMENDMENT 0009 IS CONTINUED ON PAGE 2.

FacilityCode[0]:
Code[2]: NA
IssuedBy[0]: Contracting Division

USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: NA
AmendmentNo[1]: 70Z04722RCGRADP00
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 3
EffectiveDate[0]: 02/24/2022
Dated9B[0]: 12/06/2021
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]: 1