09-22-2022-11-34-15-AM-Coast-Guard-Air-Station-Sitka-Galley-boiler-rm-Sitka-Back-Flow.pdf

PDF 289 KB Posted

Attached to
USCG AIR STATION SITKA ANNUAL BACK-FLOW PREVENTER INSPECTION
Solicitation number
70Z04524QKODI0019
Issued by

About this file

This combined synopsis and solicitation requests quotes for annual backflow prevention system inspection services at the U.S. Coast Guard Air Station Sitka in Alaska. The solicitation seeks inspection in accordance with the attached statement of work to be completed by February 15, 2024. Quotes are due at the U.S. Coast Guard Base Kodiak by 1:00 PM on January 17, 2024 and shall be submitted electronically to the contracting specialist's email. The acquisition is set aside 100% for small businesses with a size standard of $19 million. The place of performance is the U.S. Coast Guard Air Station Sitka located at 611 Airport Road in Sitka, Alaska. The contracting office is the U.S. Coast Guard Base Kodiak. The solicitation number is 70Z04524QKODI0019 and is issued by the Department of Homeland Security's U.S. Coast Guard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Back Flow Form

Anchorage Water & Wastewater Utility Attn: Field Services 3000 Arctic Blvd. Anchorage, AK 99503-3813 Phone: (907) 564-2762

FAX: (907)786-5001

EMAIL: awwufieldservices@awwu.blz

Service Type

Existing New Replacement

Replaces SN# Serial Number MOA # 027504 Assembly ID Contact Name Test Due Date Tom Logan 09/19/2022

Assembly Location Information Facility Name Location ID Coast Guard Air Station Sitka Galley boiler rm Service Address Zip Phone Sitka 99835 (907)942-7562

Property Information Mailing Name Coast Guard Air Station Sitka Address 1 611 Airport Drive City ST Zip Telephone Sitka Ak 99835

Assembly Information Type Size Mfr Model RP 3/4” Watts LF 909qt

Equip Location Galley boiler room

Hazard Type Domestic

Water Turn Off Authorization: (Print) Time

12:14:00 PM

Is the Assembly installed in accordance with manufacturers recommendations and/or local codes? Yes No

Test Date 09/19/2022 https://mydoforms.appspot.com/

Initial Test

Pass Fail

Reduced Pressure Principal Assembly Check Valve #1 Check Valve #2 Relief Valve

Held at 8.9 PSID Held at PSID Opened at 2.6 PSID

Closed Tight Leaked

Closed Tight Leaked

Did Not Open

Pressure Vacuum Breaker Air Inlet Check Valve

Opened at PSID Held at PSID Did Not Open Leaked

Repairs and Materials Used Na

Final Test

Pass

Reduced Pressure Principal Assembly Check Valve #1 Check Valve #2 Relief Valve

Held at PSID Held at PSID Opened at PSID

Closed Tight Closed Tight

Pressure Vacuum Breaker Air Inlet Check Valve

Opened at PSID Held at PSID

Test Gauge Used:

Manufacturer/Model: SN: Calib/Accur Date:

Remarks PVC drain is required to min clearance 1” below drain for inspection and to prevent cross contamination. See pic

Photos

Image 1 Image 2

Image 3 Image 4

Image 5 Image 6

Image 7 Image 8

Image 9 Image 10

Service Restored Yes No

The above is certified to be true at the time of testing Tester Name Company Name Gregory Stevenson North Star Fire Protection, LLC Company Address Phone Number 520 W. 58th Ave. Unit G Anchorage, AK 99518 (907)677-1233 Tester Signature Certified Tester #

BAT 010

Customer Email Tomas.m.logan@uscg.mil

Other Email

Powered by www.doForms.com https://mydoforms.appspot.com/imageViewer?blobKey=ag9zfm15ZG9mb3Jtcy1ocmRyFwsSCmJsb2Jfc3RvcmUYgID007KdnQkM&blobName=9a856g853r3oft0$$05042020162136$$Published$$423$$P1$$P1.jpg https://mydoforms.appspot.com/imageViewer?blobKey=ag9zfm15ZG9mb3Jtcy1ocmRyFwsSCmJsb2Jfc3RvcmUYgID0s6eyzAoM&blobName=9a856g853r3oft0$$05042020162136$$Published$$423$$S1$$S1.jpg https://www.doForms.com

File details come from the government source that posted it. Updated .