70Z04026QSBPL0014.pdf
PDF 300 KB Posted
- Solicitation number
- 70Z04026QSBPL0014
About this file
This is a Request for Quote (RFQ) for industrial ship repair services issued by the United States Coast Guard Surface Forces Logistic Center (SFLC). The solicitation seeks qualified vendors to perform FY2027 underwater body repairs on two vessels: USCGC ANT Saginaw River (49422) and USCGC ANT Detroit (49424). The contract type is Firm Fixed Price, with performance periods of December 15, 2026 through January 13, 2027 for the Saginaw River and January 14, 2027 through February 12, 2027 for the Detroit. The estimated contract value and specific line item pricing details are contained in the Schedule of Supplies and Services document, which offerors must complete and submit with their quotations on an Excel spreadsheet. Award is anticipated on or about November 2, 2026.
This solicitation is set aside for Women-Owned Small Businesses (WOSB) with a 100% small business set-aside designation. Offerors must submit quotes electronically to Janet M. Delaney at Janet.M.Delaney@uscg.mil no later than October 16, 2026 at 2:00 PM EST, with quotes remaining valid for 190 days. Required submittals include a completed SF1449 form, pricing spreadsheet, past performance documentation using the provided questionnaire, small business self-certification, welding certifications and procedures, proof of current insurance coverage, AMPP/NACE Level 3/QP-1 certification, a preliminary planning document, SAM UEI and Tax Identification Number, Joint Certification Program (JCP) registration proof, and completed FAR 52.212-3 representations and certifications. The RFQ emphasizes that vendors must request current vessel drawings no later than September 22, 2026 and that JCP registration is mandatory to access critical technology configuration documentation. Contractors must maintain specified insurance including $500,000 Ship Repairer's Liability and Comprehensive General Liability coverage, provide composite labor rates for growth work, and comply with extensive Coast Guard requirements including quality assurance programs, government property management, inspection protocols, and payment methodologies based on percentage of completion milestones.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dra ft
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
70Z04026QSBPL0014
TABLE OF CONTENTS:
Section II: Continuation of SF1449 Section III: Contract Clauses Section IV: List of Documents, Exhibits, and other Attachments Section V: Solicitation Provisions
70Z04026QSBPL0014
Section II: Continuation of SF1449
Item Number Base Item Number
Supplies/Services Quantity Unit
0001 USCG ANT SAGINAW RIVER
(49422) & USCGC ANT DETROIT
(49424) FY27 INDUSTRIAL
REPAIRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Purchase Requisitions
IDC Type: Not Applicable
Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
12/15/26 2/12/27
Section III: Contract Clauses
Clauses incorporated by reference
Article Number Reference Text
52.246-16 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
52.203-3 52.203-3 GRATUITIES (APR 1984)
52.203-12 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (JUN 2020)
52.204-13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-18 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.232-39 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.202-1 52.202-1 DEFINITIONS (JUN 2020)
52.203-6 Alt I 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN
2020) ALTERNATE I (NOV 2021)
52.203-17 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
52.204-10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
70Z04026QSBPL0014
AWARDS (JUN 2020)
52.204-19 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.212-4 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (NOV 2023)
52.212-5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES
OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(MAR 2026)
52.219-6 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
52.222-3 52.222-3 CONVICT LABOR (JUNE 2003)
52.222-19 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES (MAR
2026)
52.222-35 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
52.222-36 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
52.222-37 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222-40 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
52.222-54 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)
52.223-3 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)
52.225-13 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.232-1 52.232-1 PAYMENTS (APR 1984)
52.232-25 52.232-25 PROMPT PAYMENT (JAN 2017)
52.232-33 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
52.233-3 52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.245-1 52.245-1 GOVERNMENT PROPERTY (SEP 2021)
52.245-9 52.245-9 USE AND CHARGES (APR 2012)
52.204-25 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
52.204-11 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT-REPORTING
REQUIREMENTS (JUL 2010)
52.222-11 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222-12 52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)
52.244-6 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (OCT 2025)
Clauses incorporated by full text
70Z04026QSBPL0014
NOTICE FOR FILING AGENCY PROTESTS
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time- consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester's concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the government. The agency's goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.
CONTRACTING OFFICER'S AUTHORITY:
No oral or written statement of any person other than the Contracting Officer with the proper certification of appointment will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the ONLY person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, said authority reminds solely with the Contracting officer. In the event the Contractor or associated Subcontractor effects any such change at the direction of any other person other than the Contracting Officer the change will be considered to have been made without authority and no adjustment will be made in the contact price to cover any increase in cost incurred as a result thereof.
CONTRACTOR PERFORMANCE EVALUATION:
(a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offerors past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.1502. All information contained in this assessment may be used, within the limitations of FAR 42.1502, by the government for future source selections and in accordance with FAR 15.304, when past performance is an
70Z04026QSBPL0014
evaluation factor for award.
(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 60 days to respond to the SFLC's assessment of its performance entered into CPARS. The contractor's response, if any, will be made part of the CPAR system.
(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor's record of integrity and business ethics, and generally, the contractor's business-like concern for the interest of the customer.
(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or
(3) when prior written consent is requested and obtained from the contractor.
CONTRACT CLAUSES & PROVISIONS
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Additional examples include 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services, and 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
Contracting officers will not consider the following representations when making award decisions or enforce requirements:
· Paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services;
· Paragraphs (b)(33), (b)(34), (e)(1)(ix), and (e)(1)(x) of 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services;
· Paragraphs (e)(1)(ii)(I) and (e)(1)(ii)(J) of Alternate II of 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services; and
· Paragraphs (a)(1)(vii) and (a)(1)(viii) of 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
49'S ADDITONAL CONTRACT REQUIREMENTS
The below contract requirements have been determined by the Contracting Officer to be necessary for this acquisition and consistent with customary commercial practices and Federal, DHS, and Coast Guard Regulations.
(1) ACCESSIBILITY OF CONTRACTOR'S FACILITY (DOES NOT APPLY)
The contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 7' and a minimum vertical clearance of 25'. The facility shall insure 2 (two) additional feet below minimum water depth at the pier per SFLC Standard Specification 0000 section
70Z04026QSBPL0014
3.3.2.1.1.
(2) REQUIRED INSURANCE
The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (DEC 2003), the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:
1. Ship Repairer's Liability - $500,000 per occurrence.
2. Comprehensive General Liability - $500,000 per occurrence.
3. Full insurance coverage in accordance with the United State's Longshoremen's and Harbor Worker's Act.
4. Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.
The insurance certificate must provide the name of the US Coast Guard vessel and the contract number as specifically insured.
(3) ACCESS TO VESSEL (DOES NOT APPLY)
(a) A reasonable number of officers, employees, and associates of the Government, or other prime Contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.
The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.
(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.
(4) INDEMNIFICATION FOR ACCESS TO VESSELS (DOES NOT APPLY)
Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the
Contractor agrees to allow officers, employees, and associates of the Government, or other prime contractors with the Government and their subcontractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not
70Z04026QSBPL0014
been previously included in the contract price.
(5) CONTRACTING OFFICER'S AUTHORITY
No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
(6) INSPECTIONS
Except as specified elsewhere, the U.S. Coast Guard shall rely on the contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.
Records of all inspection work by the contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.
(7) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP
REPAIR CONTRACT
1. The Government Property Clause incorporated by reference delineates the contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.
2. The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The contractor shall sign for all government furnished property using either a DD Form 1149, entitled, "Requisition and Invoice/Shipping Document" or a DD Form 1348, entitled, "Issue Release/Receipt Document". A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the contractor at time of award. The contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.
3. The contractor shall complete the report provided herein, entitled, "Government Property Report". This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a, and b) above shall be reported on the report. At contract completion the contractor and the Property Administrator shall ensure that all fields are appropriately completed.
A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all government property took over the course of the
70Z04026QSBPL0014
contract. This completed report must accompany the contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.
4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.
The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.
(8) GROWTH WORK
(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, (OCT 2018) will be incorporated.
(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an MLCA 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.
(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the contractor. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.
(9) COMPOSITE LABOR RATE:
The composite labor rate offered shall be the sole labor hour rate used to price the prime contractor's direct labor hours for contract changes, i.e. growth work. The contractor shall not receive any compensation in addition to this rate for the prime contractor's direct labor associated with such changes under this contract.
(a) The composite labor hour rate shall represent total compensation for the following:
70Z04026QSBPL0014
(1) direct labor wages and salaries;
(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;
(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;
(4) all indirect costs such as overhead and general and administrative expense;
(5) any port or association fees, rents, or other levies;
(6) profit (fee); and
(7) all direct and indirect costs and profit associated with the following support functions:
* Supervision and Management * Planning and Estimating
* Material Handling * Housekeeping
* Engineering * Transportation/Drivers
* Quality Assurance * Contract Administration
* Security * Testing
(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.
(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the contractor to compensation if not exercised.
(10) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS FOR SHIP REPAIR
The Government will make payment under this contract based on a percentage or stage of completion. The contractor may invoice each contract line item/CLIN as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:
An item/CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that item/CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be
70Z04026QSBPL0014
reached prior to billing each item/CLIN may be waived by the Contracting Officer on a case by case basis for large dollar items/CLINS.)
Invoices submitted by the contractor which are deemed not proper, in accordance with FAR clause, 52.212-4 will be returned.
(a) WHEN TO SUBMIT: The contractor must first:
(1) Receive a fully-executed purchase order, contract, delivery order or task order
(2) Provide the requirements, and
(3) Have ACTIVE status in the System for Award Management (SAM) at https://www.sam.gov
The contractor's final invoice submitted under the contract must be marked as follows: "THIS INVOICE CONSTITUTES THE
FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE.
NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE
CONTRACT, ARE RECEIVED AND ACCEPTED.
(b) INVOICE CONTENT: Each invoice must contain the following information:
(1) Invoice Date
(2) Invoice Number
(3) Purchase Order Number or Contract Number or Contract and Delivery/Task Order Number
(4) Contractor's Name
(5) Contractor's Address
(6) Contractor's SAM UEI
(7) Contracting Officer's Name
(8) Contracting Officer's Representative's (COR's) Name (if applicable)
(9) Invoice Routing Code (IRC) assigned by the Coast Guard as follows: SFLC-3
(10) Period of Performance for Work Invoiced
(11) Contract Line Item Number(s) (CLIN(s)) and Description (if applicable)
(12) CLIN units for the period (if applicable), CLIN rate (if applicable), CLIN Total (if applicable)
(13) For Travel: Components in accordance with FAR 31.205-46
70Z04026QSBPL0014
(14) Invoice Total
(15) Discount Offerings
(16) Status as a Small Business (if applicable) for accelerated payment
(17) The last invoice submitted for this award must be clearly labeled with "FINAL INVOICE."
(18) NOTE: A request for payment is proper if it includes the items required by the clause at FAR 52.232-25, Prompt Payment [(a)(3)(i) through (a)(3)(ix), with common items captured in the list above] and those items are accurate. If a request for payment does not include all the items required by the clause at FAR 52.232-25, Prompt Payment, or any information is inaccurate, then the request is not proper and will be returned to the contractor with a statement of the reason(s) it is not proper.
Electronic Submission of Payment Requests (FSMS Awards)
(a) Definitions. As used in these instructions -
(1) "Payment request" means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), "Content of Invoices" and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.
(b) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.
(c) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.
(d) If alternate payment procedures are authorized, the contractor shall include a copy of the contracting officer's written authorization with each payment request.
(e) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/.
(11) DRYDOCK CERTIFICATION AND DRYDOCK CALCULATIONS: (DOES NOT APPLY)
"Certifications must be current at the time of the established closing date. Failure to include a current certification may render the proposal/quote unacceptable and the proposal/quote may be eliminated from further consideration."
Contractor SHALL provide with his or her proposal/quote a current certification of its drydocking facility/travel lift/or crane as required by the specifications, Work Item D-___ Drydock, and SFLC Standard Specification 8634_STD. (Appendix B) Contractors submitting a proposal and is using a Drydock Facility not owned by the contractor SHALL provide written authorization from the Drydock Facility authorizing the use of the drydock facility for the performance period stated in this solicitation along with the drydock facilities certifications as stated above. All required certifications submitted with contractors proposal will be cross referenced using the Coast Guard Database.
When requested by the Contracting Officer, the Contractor shall also provide the pre-award calculations described in specification Work Item D-___, Drydock, Cutter Conditions, and (Appendix A) of the SFLC Standard Specification 8634_STD.
Subsequent to contract award, the Government will require the Contractor to provide the docking and un-docking calculations described in (Appendix A) of the SFLC Standard Specification 8634_STD.
(12) WELDING CERTIFICATION AND QUALIFICATIONS
70Z04026QSBPL0014
This solicitation may contain welding line items as either Definitive or Optional Items. With his/her quote the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and SFLC Standard Specification 0740_STD. Subsequent to contract award, the Government will require the Contractor to submit applicable certifications and qualifications to the COTR for any welding to be performed on any proposed change request.
(13) PLANNING DOCUMENT
Contractor shall submit a preliminary planning document with their proposal IAW SFLC Standard Specification 0000. The requirement to provide the planning document with the proposal supersedes the requirement in paragraph 3.2.5.2 of SFLC Standard Specification 0000. Proposals that do not include a planning document may be considered unresponsive.
In accordance with SFLC Standard Specification 0000:
3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:
· Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).
· Shows overall period of performance for each CLIN, with start and stop dates of major subtasks.
· Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast
Guard Inspector presence.
· Identifies all work item time periods that require OEM Tech Rep assistance.
· Identifies the "critical paths" for the project.
· Shows calculations for the "float" along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.
NOTE:
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.
70Z04026QSBPL0014
EXCLUDED: 3.2.5.2 Submit a preliminary electronic copy of the PD to the KS - for Government review - no later than one week after contract award.
3.2.5.3 Submit 3 copies of the PD to the KS, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.
NOTE:
A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor's internal scheduling document is preferred.
FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL
3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to 'crash' the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.
(14) AMPP, NACE Level 3, QP-1 Certification
3.2.4 QC/ QA Program.
3.2.4.1 General. The Contractor shall be aware that QC/QA is the sole responsibility of the Contractor;
consequently, the Contractor shall implement a QC/QA Program, to ensure that Contractor work meets the requirements of the specifications, without undue delay and re-work. Be aware that:
· The COR may delegate inspection responsibilities to members of the vessel's crew, to monitor the progress and quality of work done by the Contractor.
· If, during the performance of work the Coast Guard Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the KO, who will then advise the
70Z04026QSBPL0014
Contractor informally of the deficiency. If the deficient work is not corrected within a reasonable period of time (as approved by the KO), the KO will officially alert the Contractor via a CDR.
3.2.4.2 In-process QC measures for "critical-coated surfaces". The Contractor shall abide by the below specified in-process QC measures during preservation of "critical-coated surfaces" (see the definition of
"critical-coated surfaces" in paragraph 1.3 (Acronym and term definitions)).
3.2.4.2.1 Painting contractor certification program requirement. Be aware that a "QP 1 Certification", in accordance with the SSPC QP 1 Certification Programs, is required for all Contractors or sub-Contractors who engage in preservation (excluding touch-ups) of "critical-coated surfaces". Ensure that the QP 1-Certification is in effect prior to contract award, and remains so during any surface preparation or painting of said surfaces. Notify the KO of any change in contractor certification status. In addition, be aware that:
· If the certification expires during the performance period, preservation tasks will not be allowed to continue, until said certification has been reissued.
· Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered.
Information on the SSPC certification programs can be found at www.sspc.org
3.2.4.2.2 Coating tech rep. In lieu of meeting the "QP 1 Certification" requirements, the Contractor may opt to provide the services of a coating Tech Rep, in accordance with the following guidelines:
3.2.4.2.2.1 Qualifications. The Tech Rep shall be a Certified Coating Inspector, having successfully completed the NACE-International Coating Inspector Program (CIP), Level 3 - Peer Review.
SFLC STANDARD SPECIFICATION 0000 2014 11 0000
Information regarding the CIP may be obtained at the following URL address: www.ampp.org
3.2.4.2.2.2 Professional independence. The Tech Rep shall neither be an employee of the Contractor, nor of any coating system manufacturer.
3.2.4.2.2.3 Certification document submission. The Contractor shall submit, to the KO, the QP 1
Certificate or the name of the NACE-Certified Tech Rep, along with Certificate Number, during the pre-award phase of the
70Z04026QSBPL0014
3.2.4.2.3 QP 1 inspector or tech rep duties. The Coating Inspector for the "QP 1-certified" Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of "critical-coated surfaces":
· Verify inspection instrument calibration.
· Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.
· Verify all aspects of surface preparation – including, but not limited to:
o Cleanliness of compressed air.
o Adequacy of solvent cleaning.
o Proper handling of blast media.
o Actual surface preparation procedure.
· Inspect and approve final surface preparation, before application of primer coat.
· Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.
· Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).
· Complete and sign the quality assurance (QA) inspection forms, provided in Appendix E of
SFLC Std Spec 6310 (Coatings QA Forms/QA-1 thru QA-5).
· Submit all completed QA inspection forms to the KO (through the Contractor), upon completion of work.
3.2.4.2.4 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform all duties listed in above paragraph (QP 1 Inspector or Tech Rep duties). Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.
NOTE: The AMPP, QP-1, or NACE Inspector must remain onsite, to fulfill the tasked duties listed above - unless otherwise approved by the KO.
FAR 52.212-2 EVALUATION COMMERCIAL ITEMS SOLICITATION 49'S
70Z04026QSBPL0014
52.212-2: As prescribed in 12.301(c), the Contracting Officer may insert a provision substantially as follows:
Evaluation—Commercial Products and Commercial Services (Nov 2021)
(a) The Government intends to award one (1) firm-fixed price (FFP) contract award resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation offers the best value to the Government using the lowest price technically acceptable approach. The following factors shall be used to evaluate offers:
- Factor 1 – Technical Capability
Offerors shall demonstrate an understanding of the requirements as described in the specification and shall include sufficient documentation to provide evidence of that understanding, to include written summary and confirmation that items provided are in accordance with the specifications, drawings, photos, warranty information to meet the specifications and the RFQ.
The Government will evaluate the technical factor for technical acceptability ONLY, which includes: 1) meeting the minimum requirements of the specification. Any response that does not provide this information may be considered non-responsive and be removed from further consideration for award.
The following adjectival ratings will be assigned to the technical factor:
RATING DESCRIPTION:
ADJECTIVAL RATING
DESCRIPTION
Acceptable
Proposal meets the requirements of the solicitation and specification.
Unacceptable
Proposal does not meet the requirements of the
Solicitation and specification.
Additionally,
(1) The Defense Priorities and Allocations System doesn't apply to this procurement.
(2) Offerors shall submit quotes as follows –
Vendors shall submit an electronic copy of your firm's quotation to Janet M. Delaney at Janet.M.Delaney@uscg.mil no later than 16 OCTOBER 2026 at 2:00pm (EST). The contractor's quote will remain valid for (190) days. All submissions shall include 70Z04026QSBPL0014 in the subject line of the email. These submission instructions will also apply to any future correspondence, as applicable, in response to this solicitation.
NOTE: Any vendor who is interested in submitting a quote but cannot meet the required performance period is encouraged to submit a quote and propose an alternate performance period.
REQUIRED DOCUMENTS:
Each offeror shall furnish the information required by the solicitation, which includes:
1. SF1449 completed and signed with total proposal amount. The total proposal amount will include Definite line items and Option Line items. Any amendments associated with the solicitation must be signed as well.
2. Schedule of Supplies and Services:
a.) To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.
3. Past Performance Documentation- (Attachment: Past Performance Questionnaire)
4. Small Business Self Certification for applicable set-aside (i.e. HUBZone, Small Business, SDVOSB, 8(a))
5. Welding Certifications and Procedures
6. Proof of Insurance (Statement of Coverage from current Insurance carrier)
70Z04026QSBPL0014
7. SFLC STD SPEC 8634B CG Approved Drydock Certification, Travel Lift Certification or Drydock Cradle (if applicable) Certification (DOES NOT APPLY)
8. AMPP Senior Inspector, NACE Level 3 or QP-1 Certification.
9. Planning Document
10. SAM UEI (GSA provided 15-character (letters and numbers) identifier SAM.gov) and Tax Identification Number (TIN).
11. Proof of JCP Certification
12. A completed copy of the provision of 52.212-3, Offeror Representations and Certifications – Commercial Items (MAY 2024).
PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE
AND MAY NOT BE CONSIDERED.
PERIOD OF PROFORMANCE DATES:
The PERIOD OF PROFORMANCE dates is as follows:
CG STA SAGINAW RIVER (49422), 15 DECEMBER 2026 – 13 JANUARY 2027
CG ANT DETROIT (49424), 14 January 2027 – 12 February 2027
ANTICIPATED AWARD DATE:
The contract is expected to be awarded on or about, 02 NOVEMBER 2026. Subject to the Availability of Funds.
70Z04026QSBPL0014 USCG STA SAGINAW RIVER (49422) AND USCG ANT DETROIT (49424) FY 2027 UNDERWATER
BODY REPAIRS.
(xvi) Please email to request drawings referenced in specification. Please indicate where you would like the drawings sent in your
70Z04026QSBPL0014
email. Currently all drawings are being submitted via e-mail. Please provide a valid e-mail address. Requests for drawings shall be received no later than 22 SEPTEMBER 2026 at 2:00pm Eastern Standard Time.
Instructions to access information marked as Critical Technology
All interested vendors planning to submit proposals for 70Z04026QSBPL0014 must register or be currently actively registered with the US Defense Logistics Agency in the Joint Certification Program (JCP) to gain access to USCG drawings.
REQUEST FOR DRAWINGS: The last day to request drawings regarding this solicitation is 22 SEPTEMBER 2026 2:00pm EST.
After this date, further requests may not be accepted due to time constraints. To request drawings, contact the Contract Specialist.
All requests should identify the solicitation number. Some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution and have been deemed "limited access" and "export controlled" packages. In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.
Note: Once registration has been accomplished, please provide proof of registration to Janet M. Delaney email:
Janet.M.Delaney@uscg.mil, and that information will be forwarded to the CG's Publication Production & Distribution Section Technical Information Management Branch (TIMB). Once TIMB confirm registration, there will be a PIN provided to Janet M Delaney and issued to each of the vendor's POC/s. This PIN will be used to access References found under the Spec/SOW, Consolidated List of References. To bid on this solicitation any contractor, wanting to submit a bid, MUST be registered with JCP to obtain the current configuration of the vessel (configurations have changed). Any contractor who is not registered in the JCP system and does NOT request drawings, the contractor's proposal will not be accepted in accordance with the solicitation requirements. (CONTRACTORS MUST REQUEST DRAWINGS THROUGH THE CONTRACT SPECIALIST.) If current drawings are not requested the contractor's proposal will not be accepted.
Any Contractor's Requests for Clarifications shall be answered via amendment to the solicitation and shall be received no later than 29 SEPTEMBER 2026 at 2:00 p.m. Eastern Standard Time. The closing date and time for receipt of quote is 16 OCTOBER 2026 at 2:00 p.m. Eastern Standard Time. All quotes shall be submitted via email to Janet M. Delaney at Janet.M.Delaney@uscg.mil. An offeror not able to submit their quote via email must notify the Contract Specialist via e-mail Janet.M.Delaney@uscg.mil 48 hours prior to the closing date and time specified in this solicitation. The solicitation closing date and time will not be extended.
Offerors may contact Janet M. Delaney via Janet.M.Delaney@uscg.mil for information regarding this solicitation.
- Factor 2 – Price
2.) Vendor's price shall represent the best price in response to the RFQ. The price shall be evaluated to determine fairness and reasonableness. Vendors are required to provide prices for all items/CLINs in accordance with the Schedule of Supplies/Services.
2a.) Schedule of Supplies and Services:
70Z04026QSBPL0014
a.) To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.
b.) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
2.1 Price Reasonableness
Price analysis techniques may be used to further validate price reasonableness. If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government obtained information, additional information will be required to support the proposed price.
2.2 TOTAL EVALUATED PRICE: The aggregate price determined by totaling the offer price for Definite Items, plus offer price for Option Items.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .