This is a Questions and Answers document for U.S. Coast Guard Solicitation 70Z03326QSEAT0004, ANT Coos Bay Front Gate Replacement project. The Q&A addresses technical specifications and implementation details for the gate and fencing replacement project at the U.S. Coast Guard Aids to Navigations Team facility in Charleston, Oregon. Key responses clarify that the project will use a single motorized sliding gate (not two-part), require replacement of wooden fencing with matching chain-link fence following the existing fence path, and incorporate a 36-inch man door. The gate system must include fail-close power loss requirements with manual override and lock-open features, along with 20 programmable keypad and magnetic/proximity entrance cards for access control.
Additional clarifications address infrastructure coordination requirements, including confirmation that the power circuit will be moved inside facility grounds and that the Public Utility District will relocate power pole support wire prior to work. The government is coordinating with base security for temporary barrier requirements during construction and with the housing officer regarding a water spicket attached to garages on the north side. The barbed wire versus razor wire specification for fencing remains under government review. This Q&A supports the firm-fixed-price, small-business set-aside solicitation with a mandatory site visit on May 11, 2026, a quote submission deadline of May 28, 2026, and a completion deadline of September 9, 2026.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions for 11MAY26 SOW ANT COOS BAY FRONT GATE
1. Will three strands of barbed wire meet CG policy or will razor wire be required? A. Unsure but in the process of finding answer.
2. Will power circuit have to be moved inside facility grounds? A. Yes
3. Will power pole support wire be moved prior to work being conducted? A. PUD will be contacted by on site POC for movement of support wire.
4. Will the wooden fence have to be replaced with matching/continuing chain link fence? A. Yes
5. Will fencing stop approximately where existing wooden fence ends? A. Yes and follow same path as previous wooden fence
6. Will there be a need for a keypad and magnetic/proximity entrance cards? A. Yes, with 20 provided and programmable keypad
7. Will there be a need for temporary barrier while work is being conducted? A. Unit will follow up with base security officer for proper guidance.
8. Requirements for loss of power? A. Fail close
9. Do you want a manual override and a lock open feature? A. Yes, with a “fail closed” state.
10. Man door size requirement? A. 36in
11. Water spicket attached to garages on north side, will this have the availability of being moved or shut off? A. Unit POC will contact housing officer to ensure availability of shutting water off and possible movement of spicket.
12. One- or two-part sliding gate? A. One sliding gate