SOW Attachment E SLA Performance Metrics.pdf
PDF 333 KB Posted
- Attached to
- Medium Speed Explosive Detection Systems (MSEDS) Federal contract opportunity
- Solicitation number
- 70T04024R7672N002
About this file
This document is Attachment E - MSP SLA Performance Metrics, which defines the process for developing performance metrics to evaluate the contractor's compliance with the Service Level Agreement (SLA) for the Checked Baggage Technology Division contract.
The key details are:
- The document outlines the process for calculating the Operational Availability (Ao) metric to measure overall contractor performance. Ao evaluates the availability of Transportation Security Equipment (TSE) during an airport's operational hours, considering critical and non-critical failures.
- It provides the formula and instructions for calculating Ao monthly for each TSE serial number at each airport. This Ao metric is used to determine compliance with the SLA performance requirement.
- The document also specifies the process for calculating Ao to determine if performance disincentives should be applied to invoices, using the same formula but calculated across all TSE units at an airport.
- It identifies the low-level maintenance metrics (M-Values) that are counted towards the TSE operational downtime for the Ao calculations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70T04024R7672N002 RFP Questions_Answers.pdf | ||
| MSEDS RFP-70T04024R7672N002- 00001- Tracked Changes.pdf | ||
| RFP Attachment A- CLIN Schedule 0001.xlsx | XLSX spreadsheet | |
| RFP Attachment B Statement of Work - 00001- Tracked Changes.pdf | ||
| SF30 70T04024R7672N002 Amendment 00001.pdf | ||
| MSEDS RFP-70T04024R7672N002- 00001- Clean.pdf | ||
| RFP Attachment B Statement of Work - 00001- clean.pdf | ||
| MSEDS RFP-70T04024R7672N002.pdf | ||
| SOW Attachment B- CDRLs.zip | ZIP file | |
| SOW Attachment C - Airport List and Operational Hours.xlsx | XLSX spreadsheet | |
| RFP Attachment A- CLIN Schedule.xlsx | XLSX spreadsheet | |
| SOW Attachment D TSE Metrics Terms and Definitions and RMA Metrics.pdf | ||
| RFP Attachment B Statement of Work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Checked Baggage Technology Division (CBTD) Part J – Contract Documents, Exhibits, or Attachments Contract No. 70T04020Q9CAP1112 Attachment E – MSP SLA Performance Metrics
Transportation Security Administration
Integrated Logistics Support (ILS)
Service Level Agreement
Performance Metrics
March 2020
Table of Contents
1. Purpose
2. Scope
3. Data Collection and Reporting Process
4. Operational Availability (Ao)
SLA Performance Requirement Invoice Development
1. Purpose
The purpose of this document is to define the process for developing the Contractor performance metrics specified in Section B.3.10.4.1, Logistics Support Service Level Requirements to evaluate compliance with the Service Level Agreement performance requirements; and the process for developing the metrics required to determine disincentives and development of invoices in accordance with Section G.0.242.003 (j), Submission of Invoices. The maintenance elements used in the development of these metrics are provided in Attachment D, Transportation Security Equipment (TSE) Terms and Definitions & Reliability, Maintainability & Availability (RMA) Metrics.
2. Scope
This document identifies the process the Contractor should use to develop the metrics to demonstrate compliance with the SLA performance requirements and substantiate the determinations made for invoice development. It provides the calculation instructions for each metric required by the contract.
3. Data Collection and Reporting Process
The process identified in this document relies on the maintenance elements collected from the corrective maintenance actions conducted to return TSE to full operational capability. These maintenance elements will be collected in accordance with the process identified in Attachment D, and will be documented in the TSE Database in accordance with the Contract Data Requirements List (CDRL) E004, TSE Database. This includes the time points (T-Values) and low-level metrics (M-Values) measured for each time points.
Sections 4 through 5 below identify the process for calculating the SLA performance metrics defined in Section B.3.10.4.1, and for calculating metrics to support disincentives that may be applied to invoices as defined in Section G.0.242.003 (j), Submission of Invoices. These metrics will be calculated as specified in each section and will be reported to TSA as part of the TSE RMA Metrics report in accordance with Contract Data Items List (CDRL) E011, TSE RMA Metrics report, as required. The TSE RMA Metrics Report must clearly identify the low level metrics and times for each used in the calculation of a metric.
4. Operational Availability (Ao)
The Government will measure overall Contractor performance using Operational Availability (Ao) as defined in Attachment D. Ao will evaluate the operational availability of TSE in relation to All relevant critical failures and all relevant non-critical failures (includes all corrective maintenance work orders). It is the percentage of time during an airport’s operational hours that TSE is available to perform its required mission during a specified reporting period. For Ao, TSA only considers a TSE’s downtime when it is not in a condition to perform its required mission during an airport’s operational hours. The counting of low-level metrics times for Ao will be based on the TSE operating time and TSE operational downtime as defined below.
• TSE Operating Time – The period of time TSE is available to perform its required mission during the operational hours of a facility as specified in Attachment C, Airport Operating Hours, Airport Listing and TSA POCs. During the Operations & Maintenance (O&M) life cycle phase, TSE operating time will be equal to the airport’s operational hours (period of time within 24-hour day that an airport is operational) unless the TSE experiences any operational downtime.
• TSE Operational Downtime – The period of time during an airport’s operational hours that TSE is not in a condition to perform its required mission. This includes all times that a system is not available due to applicable on-site Corrective Maintenance (CM), and Depot Maintenance (DM) Low-Level Metric times during an airport’s operational hours.
The determination of the operational downtime is made after all the low-level metrics are recorded against the 24-hour day and measured against the airport’s operational hours.
Section B.3.10.4.1, establishes the Ao performance level the Contractor must meet to satisfy the overall SLA performance requirement. Section G.0.242.003 (j), Submission of Invoices, identifies the performance level that can generate disincentives for non-compliance with the overall SLA performance requirement. Below is the process for developing the Ao metrics for these two requirements.
SLA Performance Requirement
For determining compliance with the Ao SLA performance requirement established in Section B.3.10.4.1, the Contractor shall calculate Ao monthly for each EDS serial number (and MUX as required) at each airport using the airport’s operational hours as the required system operating time, and should only include installed operational units in the calculations. The operational downtime will be calculated by summing the individual low-level metric times of each applicable failure that incurs operational downtime > 0. No averaging will be used over a reporting period.
To evaluate SLA compliance, Ao will be calculated monthly at each airport for each serial number as follows:
1. Multiply daily airport operational hours as defined in Attachment C by the number of days in the month’s reporting period. This is the total operating hours for one TSE unit. The reporting period starts the first day (at 12:00 AM) of the month and ends on the last day (at 11:59 PM) of the month based on local time.
2. Subtract the sum of the operational downtime for all relevant critical (Priority 1 (P1)) and all relevant non-critical (Priority 2 (P2)) failures for the same TSE unit used in Step 1 from the total operating hours calculated in Step 1 at an airport during the reporting period.
3. Divide the difference (from Step 2) by the total operating hours calculated in Step 1 (daily airport operational hours multiplied by the same number of TSE units at an airport and the number of days in the reporting period).
Invoice Development
For determining if Contractor performance meets the threshold for applying a performance disincentive to an invoice in accordance with Section G.0.242.003 (j), Submission of Invoices, the Contractor shall apply the same Ao calculations developed for the monthly Ao SLA performance requirement. For disincentive determination, Ao will be calculated monthly for each serial number at each airport using the airport’s operational hours as the required system operating time, and should only include installed operational units in the calculations.
To determine if disincentives should be applied to an invoice, Ao will be calculated monthly at each airport as follows:
1. Multiply daily airport operational hours as defined in Attachment C, by the number of TSE units at an airport and the number of days in the monthly reporting period. This is the total operating hours for the airport. The reporting period starts the first day (at 12:00 AM) of the month and ends on the last day (at 11:59 PM) of the month based on local time.
2. Subtract the sum of the operational downtime for all relevant critical and all relevant non-critical relevant failures for the same TSE units used in Step 1 from the total operating hours calculated in Step 1 at an airport during the reporting period (end of month accounting method is applied). The reporting period starts the first day (at 12:00 AM) of the month and ends on the last day (at 11:59 PM) of the month based on local time.
3. Divide the difference (from Step 2) by the total operating hours calculated in Step 1 (daily airport operational hours multiplied by the same number of TSE units at an airport in a technology and the number of days in the reporting period).
Below is the Ao formula that will be used to develop the SLA performance metric and the disincentive threshold metric:
Ao =
(Airport Operational Hours x TSE Units x Number of Days) – (Sum of TSE all relevant critical (P1) and relevant non-critical (P2) failures Operational Downtime) (Airport Operational Hours x TSE Units x Number of Days)
Where:
• Airport Operational Hours = Period of time within a 24-hour day that an airport is operational (airport operational hours). A TSE is required to be available to perform its required mission during an airport’s operational hours.
• TSE Relevant Operational Downtime = The time a TSE is down for repair due to any relevant failure during an airport’s operational hours
For the failure types listed below, the low-level metrics (M-Values) identified in non-shaded blocks are counted toward the TSE operational downtime for Ao when the low-level metric times, or portion thereof, occur during the airport’s operational hours. The low-level metric times conducted during the airport’s non-operational hours are not counted in the Ao operational downtime calculations. If a maintenance repair cycle continues into two or more airport operational hours within the same reporting period, the operational downtimes within each airport operational hours will be summed together if operational downtime > 0. When a maintenance repair cycle continues into a new reporting period, the operational downtimes in the second reporting period will be calculated in the new reporting period as defined in Attachment D, Section 4.7.2, Open Ticket Accounting. The dark shaded blocks with no M-Values on the Table indicate that the associated low-level metric should not be applicable to that failure type in its repair cycle as defined in Attachment D. An individual serial number’s Ao can be calculated same method as above but only using the data from that one serial number.
Table 1 - Ao Low-Level Metrics Count Failure Type
Low-Level Metrics Level Criticality Relevancy
CM Critical Relevant M1 M2 M3 M4 M5 M6 M7 M8
CM Non-Critical Relevant M1 M2 M3 M4 M5 M6 M7 M8
DM Critical Relevant M1 M2 M3 M11 M12 M8
| 1. Purpose |
| 2. Scope |
| 3. Data Collection and Reporting Process |
| 4. Operational Availability (Ao) |
| SLA Performance Requirement |
| Invoice Development |
File details come from the government source that posted it. Updated .