This request for proposal solicits technical and cost proposals for the Thallium-Bromide HPRDS Objective Resolution project. The Department of Homeland Security seeks to increase the technology readiness level of thallium bromide as a semiconductor gamma ray detection material for radioisotope identification devices through this research opportunity. Up to three awards are anticipated, with a total estimated value of $2.55 million to be allocated across Phase I and Phase II efforts. Phase I involves breadboard integration and testing over 14 months, while Phase II consists of prototype integration and testing over 12 months. Offerors must submit pitch papers by May 16, 2023 and full proposals by June 22, 2023 for consideration. Selections will be made by July 17, 2023 and awards issued on or around September 19, 2023. The project aims to advance detection and identification capabilities while lowering costs and size, weight, and power requirements for next-generation radiation detection equipment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Questions for CWMD OBAA Topic Solicitation No. 14: 70RWMD23R00000004 – Thallium- Bromide HPRDS Objective Resolution (THOR )
# Reference Question Response 1 OBAA Solicitation
70RWMD23R00000004,
page 38, #5. Research Opportunity Description, TRL statements, and page 65 Purpose and Scope, paragraph 2
Pg. 38 states that TlBr is TRL 5 is at project beginning, but on
pg. 65 it is stated (more accurately) that the current state of the technology is TRL 4.
Please confirm the current TRL stage of the TlBr material.
TlBr is currently at TRL 4. The topic solicitation has been updated to correct the description to TRL 4.
2 OBAA Solicitation
70RWMD23R00000004,
page 44, Phase 2 – Initial RIID (prototype) Integration
This section states that prototype RIIDS will be tested at a USG facility to demonstrate TRL 6. It goes on to state an operational demo of the prototypes will also be conducted to demonstrate TRL 7. This is unrealistic given the TRL 4 state of the TlBr material.
Specifically, do you agree that the TlBr material requires improvements to fundamental yields, stability, and longevity to achieve a TRL 6 state for the detector material, none of which are part of the SOW for this program? How can a major component at the TRL 4 stage be expected to turn into a TRL 6/7 system, given that the system is only as mature as its components?
The topic solicitation has been amended to reach TRL 6 instead of TRL 6/7 to reflect operationally relevant environment rather than in the field.
CWMD agrees that the TlBr material requires improvement to become operationally viable.
The Government believes that the yields, stability, and longevity are sufficient for TRL 6.
TRLs are assessed for specific devices and specific applications. The CDM by itself can only achieve TRL 4 for the specific applications. CWMD expects offerors to integrate it into a prototype RIID that will achieve TRL6 in typical DHS RIID applications.
3 OBAA Solicitation
70RWMD23R00000004,
page 44, Phase 1, 14-months, and Phase 2, 12-months timelines
Based on early discussions with the detector suppliers, there is no stockpile of CDMs or detectors to support this program. Given a typical lead-time of ~4 months from order, how does the government expect to start Phase 1 and give integrators the full 14-months for development?
The same situation exists for Phase 2, where the government will only make a decision on proceeding to Phase 2 for a particular integrator upon seeing
The time to develop the breadboard and the prototype were extended and take into account time needed for obtaining a CDM(s). The Government does not anticipate extending the schedule.
the results of Phase 2, meaning no orders for CDMs or detectors can be placed on the suppliers until the government decision to proceed to Phase 2 is made and orders can be placed by the integrator, meaning another 4-month lead-time delay. This leaves only 5 months for Phase 2 work (since the RIID prototypes are due 9 months into Phase 2 for USG testing) with the detectors.
How should an integrator address the time discrepancy given the current proposed schedule? Will the government add more time to Phases 1 and 2 to compensate for deliveries of the detector materials?
4 OBAA Solicitation
70RWMD23R00000004,
page 41, Availability of CDMs
It is stated that “offerors are free to arrange how they will acquire previously developed CDMs, or their various components as needed.”
Does this mean that RMD, BTI, H3D can be treated as suppliers and not subcontractors (meaning their costs are passed on to the integrator at whatever markup they deem appropriate and will not be based on any “cost-plus” concept)?
Has the government funded RMD/ H3D/ BTI to develop an optimized SWaP CDM?
Is the government expecting integrators to deliver prototype
It is a business decision for prime contractors to determine if RMD, BTI, and H3D will serve as supplier(s) or subcontractor(s). These arrangements will be between and agreed upon between the Prime contractor and RMD, BTI, and/or H3D.
The Government has not funded RMD/H3D/BTI to develop optimized SWaP CDMs.
RIIDs in Phase 2 that have an optimized SWaP?
Will the integrator be allowed to treat the supplier (H3D, BTI) on a fixed cost basis versus cost-plus for the development of an optimized SWaP CDM in Phase 2 or must they be treated as a subcontractor?
The criteria established for the THOR prototypes do not include optimized SWaP but will assess progress.
The integrators are expected to negotiate and make arrangements for any components that they may need.
Optimized SWaP is not required in Phase 1 or Phase 2.
5 70RWMD23R00000004,
p7 of 147, Section 7
Reference to IRIS BD for Multiplex Biothreats appears to be an error with respect to this Topic 14 solicitation. Is this accurate?
Section G.2 has been corrected to state the project name correctly as “Thallium Bromide Human Portable Radiation Detection Systems Objective Resolution (THOR)” to replace “IRIS BD for Multiplex Biothreats”.
6 70RWMD23R00000004,
general
Is the cited funding for up to 3 awards currently available to support this acquisition plan with awards and work initiating as soon as September 2023?
Funding is anticipated at time of award for possibly up to three proposals that are recommended for award. As noted on page 37 of 147, prospective awards are anticipated September 19, 2023.
7 70RWMD23R00000004,
general
In addition to the white papers provided, what GFI is available with the GFE and/or CDMs?
TDPs, ICDs, etc.
There is no GFI or GFE available. Any technical information or specifications would be obtained directly from the technology/CDM part suppliers.
8 Topic Solicitation No. 14:
70RWMD23R00000004,
p39 of 147, Section 5
Specifications are provided in attachments B-1 and B-2. No specifications citing cost are provided. However, several objectives are cited for THOR that reference reductions needed for operational unit cost as well as reductions in life cycle sustainment costs. Are there baseline data available for current state of operations with respect to unit and sustainment cost to allow offerors to understand impact needed in proposing our THOR design and projecting its strategic value?
The THOR technology maturation effort is a cost-plus fixed fee effort. No cost reductions are expected for Phase 1 or Phase 2.
It is likely that for TlBr technology to be part of a future RIID acquisition, improved resolution and ID performance will need to be competitively priced.
9 Topic Solicitation No. 14:
70RWMD23R00000004,
p38 of 147, p62 of 147
Equipment in recent live demonstrations in THOR APBI appeared to not be functioning fully as intended. It is stated entry level of CDMs under development by currently funded DHS performers at TRL 5 as of March 2023 deliveries to DHS.
Is there data available as GFI to support USG’s assessment of TRL 5 for these prototypes?
What is the relevant environment these current CDMs have been validated within? Is USG data available to offerors as to assessment methods and performance data obtained on these two approaches to aide in our technical evaluations and assessments of current state of the technologies
The Topic Solicitation has been updated to reflect TRL 4. See response to the response provided under Question 2 above.
10 70RWMD23R00000004,
general
How does DHS CWMD foresee IP management across the GFE and/or CDMs and required offeror cost share to be managed long term for the NG RIID program?
There is no GFE/P. USG is not involved with arrangements for CDMs.
No information is currently available concerning Next Generation RIID program. Per Section 12 of the Topic Solicitation, Under Volume II, Assertion of Data Rights, the Government anticipates utilizing FAR 52.227-14 Alt IV. Please see this clause to see how rights between the Government and vendor will be governed in the resultant awards.
11 Topic Solicitation No. 14:
70RWMD23R00000004,
page 12, Section 11.2
The pitch paper instructions indicate that there is a 3-page limit, including a cover page (not included in the page limit), quad chart (included), and a 1-page summary (included). Assuming the quad is typically 1 page, does the 3-page limit include the cover page, or is the summary 2 pages?
As noted in Section 11.2, the cover page is not included in the page limit.
Therefore, the pitch paper will consist of 1 page for the quad chart and up to 2 pages for the summary.
12 OBAA Solicitation
70RWMD23R00000004,
pg.65. 600-THOR- 129150-v1.0
Is the design of additional space mandatory for a potential neutron detector? Or could the final RIID be a Gamma only device?
The requirements for THOR are Gamma-only but any RIID deployed/a follow-on acquisition program would need Gamma and Neutron capability.
When CWMD assesses criteria CR-42 and CR-43, CWMD will consider whether the provided prototype could meet the full size and weight requirements if a neutron detector was integrated to the prototype provided.
This assessment does not necessarily require the offeror to leave a physical void or stand-in weight where a neutron detector would go, though those are viable options. A written description of the expected size and weight of the likely future neutron detection component and how it would impact the provided prototype dimensions would be sufficient information to support the Government assessment.
G.2 Invoices
The Contractor shall invoice once a month (1st of the month, unless otherwise agreed upon between the COR, Finance Office, and the Contractor in writing).
1. The first invoice will be drafted by the Prime Contractor and submitted for review by email to the Contracting Officer at Evelyn.dean@hq.dhs.gov with a courtesy copy to the Contract Specialist at Samantha.Leap@hq.dhs.gov prior to actual submission for payment.
2. Invoices are required to be submitted by the Prime Contractor as follows:
EMAIL:
a. FIN-SMB-CWMDInvoices@uscg.mil
b. Prime Contractor must ensure a dated confirmation of receipt from USCG FINCEN is provided.
c. Contracting Officer
d. Contracting Officer's Representative
Prime Contractor may mail or fax a courtesy copy the following:
MAIL:
CWMD United States Coast Guard Finance Center CWMD Invoices
P. O. Box 4111 Chesapeake, VA 23327
FAX:
CWMD Fax Number: 757-413-7315
3. All invoices must include (at a minimum) the following detail:
• Contract Number
• Contract period of performance
• Requirement Name: Thallium Bromide Human Portable Radiation Detection Systems Resolution (THOR)
• Invoice monthly billing period dates
• Total invoice charges per CLIN to include current and cumulative charges
• Description of Services for each CLIN (e.g., Labor/Travel/ODC)
• Remaining Un-Invoiced CLIN Value and Contract Value
• Supporting documentation to support invoice Labor, Travel and/or ODC's
Note: Further updates/details to this section may need to be updated and finalized prior to award.
1 | P a g e
Attachment A. Topic Solicitation Information
DEPARTMENT OF HOMELAND SECURITY (DHS) COUNTERING WEAPONS OF MASS
DESTRUCTION OPEN BROAD AGENCY ANNOUNCEMENT (CWMD OBAA) TOPIC
SOLICITATION NO. 14: 70RWMD23R00000004
1. Topic Solicitation Number: Topic Solicitation No. 14: 70RWMD23R00000004
2. SAM.gov Solicitation Number: 70RWMD23R00000004for Topic Solicitation No. 14 and SAM.gov Solicitation Number: 70RDND19R00000003 for the OBAA
3. Topic Solicitation No. 14: 70RWMD23R00000004 Event Dates/Time (Local Eastern Time)
• Notification to Submit Pitch Papers – April 17, 2023
• Deadline for Submission of Pitch Paper Questions – April 24, 2023, 3:00 p.m.
• Pitch Paper Submission Deadline – May 16, 2023, 3:00 p.m.
• Pitch Paper Notifications – on or about May 26, 2023
• Notification to Submit Proposals – on or about May 26, 2023
• Deadline for Submission of Proposal Questions – June 2, 2023, 3:00 p.m.
• Proposal Due Date – June 22, 2023, 3:00 p.m.
• Notification of Selection/Non-selection of Proposals – on or about July 17, 2023
• Award date (estimated) – on or about September 19, 2023.
Any proposal submissions received by the Government after the submission deadline will not be accepted unless receipt of the proposal would not unduly delay the acquisition and it was the only proposal received.
Note: This topic solicitation will be conducted in accordance with the two phased evaluation process as described under Section 1.6 of the OBAA. This topic solicitation is being issued in accordance with the notice and solicitation requirements set forth in FAR 5.201 and FAR 5.203 for the FAR 35 Research and Development solicitation. The OBAA Solicitation 70RDND19R00000003 was posted on Federal Business Opportunities (FBO.gov) on April 17, 2019. Effective November 12, 2019, FBO.gov is retired, and the OBAA Solicitation 70RDND19R00000003 can now be found on https://sam.gov
This evaluation process will consist of the solicitation, receipt, and evaluation of the pitch papers and proposals. Under this evaluation, the first stage of the evaluation process will consist of the solicitation, receipt, and evaluation of the pitch papers from potential performers. Entries in the various sections of the pitch papers should be concise and conform to the specified formatting and word count limitations as indicated in this topic solicitation. Repetition of presentation materials should be avoided or minimized as much as possible. No formal transmittal letter is required for pitch paper responses. Once the pitch paper peer/scientific review process has been completed, potential offerors will be notified in writing, typically via email, whether the potential offeror is “encouraged” or “not encouraged” to submit a full proposal.
A down-selection process will then be conducted by Department of Homeland Security (DHS). Offerors will be given the opportunity to participate in the second stage of the evaluation. Stage 2 will consist of the receipt and evaluation of the Volume I proposal limited to 16 pages, excluding the cover sheet, Volume II, and Volume III. (More information on the Volumes can be found in Section 10.) Once the proposal peer/scientific review process has been completed, offerors will be notified in writing, typically https://sam.gov/
2 | P a g e via email, that their proposal has either been selected, selected but not funded, or not selected for the award.
Potential offerors are strongly encouraged to take advantage of the pitch paper process, but they are not required to submit a pitch paper in advance of a proposal.
Offerors not selected for the award may request feedback regarding the peer/scientific review findings of the submitted proposal. Within 3 calendar days of the date the non-selection notification was sent to the offeror, the contracting officer (CO) must receive a written request.
4. Topic Solicitation Research and Development Focus Areas
CWMD.05 – Nuclear Sensing: Technologies that provide cross-cutting improvements to nuclear threat detection through dramatically improved performance and/or reduced costs when compared to commercial off-the-shelf systems.
5. Research Opportunity Description
Title: Thallium Bromide Human Portable Radiation Detection Systems Objective Resolution (THOR)
Objective: The goal of the THOR Program is to increase the technology readiness level (TRL) for thallium bromide (TlBr) as a semiconductor gamma ray detection material for radioisotope identification devices (RIID). While not a procurement program, this research opportunity (if successful) could provide the technological basis for future CWMD procurements.
Technology Readiness Level at Project Beginning: TRL 4 Technology Readiness Level Desired at Project Conclusion: TRL 6 (Note: TRL definitions can be found in Attachment B-1.)
Background
The U.S. Department of Homeland Security (DHS) is committed to using cutting-edge technologies and scientific talent in their mission to make America safer. In December 2018, the Countering Weapons of Mass Destruction Act authorized the creation of the DHS Countering Weapons of Mass Destruction Office (CWMD). The mission of CWMD is to lead DHS efforts and coordinate with domestic and international partners to safeguard the United States against chemical, biological, radiological, and nuclear (CBRN) and health security threats. The DHS CWMD Research and Development (R&D) appropriation provides resources necessary to identify, explore, and demonstrate new technologies and capabilities that will help enable DHS and stakeholders to prevent, protect against, respond to, and mitigate nuclear, chemical, radiological, and biological threats and incidents.
Priority needs of DHS’s Operational Components drive CWMD’s R&D investments. CWMD looks for the following types of solutions within the chemical, biological, radiological, and nuclear mission space:
• Over the horizon, future innovations that will transform the way homeland security operators accomplish their missions.
• Near-term capabilities that will solve current operational challenges and meet DHS’s R&D needs.
• New applications of technologies to respond to emerging threats to the homeland.
3 | P a g e
As the threat of terrorism evolves, DHS intends to assess a wide spectrum of potential technologies that can enhance their capabilities. This topic solicitation directly addresses a need for higher performing, lower cost RIID devices that are more ruggedized for operational conditions.
Description of Opportunity
CWMD is striving to work with industry in a joint R&D effort for the THOR Program, which has the objective to increase the TRL for TIBr as a promising material that could support RIID enhancement.
While the THOR Program is not an acquisition program, the effort does support CWMD’s overarching objectives to:
• acquire higher performing detection and identification devices at a lower cost.
• increase operational efficiency by increasing detection and identification capability and reducing operational size, weight and power.
• decrease lifecycle costs of existing RIIDs.
• increase reliability by acquiring devices that are more ruggedized for operational conditions.
It is anticipated that TlBr has the potential to significantly increase the detection and identification performance of RIIDs at a significantly reduced cost. As a result, CWMD seeks to maximize the speed of TlBr transition into the commercial marketplace. A future acquisition program for next-generation RIIDs would benefit from inclusion of this technology in the competition for this (and future) procurement contracts. The THOR Program’s approach is to work with industry partners to integrate the detector material technology into handheld RIID prototype form factors suitable for testing in a laboratory environment and limited demonstration in an operational environment.
CWMD has been pursuing the development of TlBr as a detector material for many years. Currently, ongoing transformational R&D is pursuing two different development approaches, one using a Pixelated detector and the other using a Position Sensitive Capacitive Frisch Grid (PS CFG) detector. Each of these detector development approaches will culminate in the packaging and integration of these detector stacks with associated electronics into Core Detector Modules (CDMs) that can be used as a basis for developing prototype RIIDs. A detailed description of the CDMs is provided in the following information.
The objective of THOR phase I is to develop one breadboard (per contract) and conduct in-house testing that demonstrate key performance advantages of TlBr and a detailed plan for Phase II prototypes. A Phase 1 Preliminary Prototype Review will be held near the conclusion of the Phase 1 to review the test results and assess performance against a subset of the THOR CTM criteria as indicated in Attachment B- 2a.
The objective for Phase II is to deliver three (3) TlBr RIID prototypes that are provided to CWMD for government testing to demonstrate compliance with the CTM criteria specified in Attachment B-2 and inform a TRL assessment.
The T1Br prototypes (per prospective contract award) integrated into a field usable RIID form factor informing important attibutes of the planned commercialized versions. The prototypes will demonstrate the capability of the TlBr technology through vendor testing followed by CWMD-sponsored testing and
4 | P a g e operational demonstration supporting the subsequent TRL assessment.
The TIBr technology developed as part of the CWMD R&D Division program will be made available to the offerors directly from the technology providers. The Government encourages the potential offerors to determine if they will require CDMs, or CDM components, and technical support through individual vendor-to-vendor agreements with the CDM developers. If this is determined to be advantageous to their proposal then the cost estimate should reflect these costs. This is not to preclude a third-party vendor (proposal offeror) from developing their own TlBr solutions.
Schematic Descriptions of the Two CDM Types
The CWMD R&D Division led the development of two types of TIBr CDMs. The two types of detectors are as follows:
Description of Pixelated CDM (as of January 2023) The Pixelated CDM consists of the semiconductor detector with readout components needed to generate a calibrated and depth corrected gamma ray spectrum.
Figure 1. Block Diagram of the Pixelated Full-up Version of the CDM
Figure 1 shows the following basic components of the Pixelated full-up version of the CDM:
1. Pixelated TlBr Array with interconnect board.
2. Application-specific Integrated Circuit (ASIC).
3. Readout Electronics: Analog-to-digital Converter (ADC), Field-programmable Gate Array (FPGA), MicroProcessor.
4. Single-board computer (SBC).
The TlBr array represents a semiconductor crystal with an array of electrodes to generate electrical signals
1 2 3 4
5 | P a g e from the interaction of gamma rays with the dense, high-Z TlBr material. The front-end electronics uses an ASIC and is designed to generate waveforms for implementing advanced signal processing techniques.
The micro-processor block contains ADCs and serves as an interface between the signals from the front-end electronics and the SBC, which processes the signals and provides a standard network interface to access the calibrated and depth-corrected gamma ray spectrum.
Description of CFG CDM (as of January 2023)
The Position-Sensitive Capacitive Frisch-Grid (PS-CFG) CDM is based on an array of 16 PS-CFG TlBr crystals. Each PS-CFG is based on a TlBr crystal with dimensions of 5 × 5 × 12 mm3. For the CFG CDM, the signals from the TlBr devices are read out using front-end electronics including the AVG3Dev ASIC, and an analog device that includes a 32-channel bank of charge-sensitive amplifiers. The amplified signals are digitized on a motherboard, then sent to an SBC. The SBC runs 3D correction software, which corrects non-uniformities in the detector response by virtually dividing each crystal into 3D voxels, then normalizing the response from each of the voxels. The output of the CDM is a data stream which includes the corrected energy spectrum. The prototype CDM is provided in a simple mechanical enclosure that includes connectors for AC power and data transfer using Ethernet and/or Universal Serial Bus (USB). A block diagram of the system is provided in Figure 2.
Figure 2. Block Diagram of the PS-CFG TlBr CDM
Availability of CDMs
The Government does not plan to make CDMs available as Government Furnished Equipment (GFE).
Offerors are free to arrange how they will acquire previously developed CDMs, or their various components as needed.
Alternatively, offerors have the opportunity to obtain a so-called “primitive” CDM, limited to the crystal(s) packaged with interconnect boards. The offeror would provide their own front-end electronics.
6 | P a g e
The Offeror’s request, if needed for their proposal, should be stated in the pitch papers and/or full proposal. Offerors should specify what assemblies they will purchase and from whom.
As another option, the Offeror can consider initially acquiring only the current version of the full-up CDM shown in Figure 1 and Figure 2. This version CDMs would not have optimized size, weight, and power (SWaP) but would provide enough of the functionality so the technology could be evaluated and integrated into a breadboard Phase 1 prototype. The Offeror would then work with the CDM suppliers to decide how they would want to proceed regarding more optimized solution for Phase 2. The integrator may elect to develop an optimized solution, either procuring components from the CDM suppliers or developing their own solutions all together to achieve SWaP goals. The desired approach should be stated in the pitch papers and/or full proposal.
Additional Information Available via White Papers
There are several “White Papers” (WP) posted with this topic solicitation that were created to address numerous areas/questions brought up by vendors during Industry Day in April 2020 and follow-on Industry Days in October 2021 and February 2023. These short (1-3 page) papers cover the following topics:
1. WP1: Long-term Stability of TlBr
2. WP3: Temperature Stability: Dependence of spectra, energy resolution, gain, dark current vs
Temperature
3. WP4(A and B): Intellectual Property Rights claimed by CDM suppliers and Commercialization (two white papers covering the two different CDM versions)
4. WP5: Production (Supply Chain Capability to Support Future Procurements)
5. WP6: Further References (published journal articles covering various aspects of this technology)
Performance Metrics
Examples of high-level performance metrics (criteria) for the envisioned prototype(s) are included below.
These are provided to help guide the design of the prototype(s). The complete list of criteria is provided in the THOR Criteria Traceability Matrix (CTM) Attachment B-2 included with the topic solicitation.
Offerors are requested to indicate in their pitch paper submissions and proposals if their proposed approach will result in a prototype RIID and/or design that can meet or exceed thresholds/objectives listed in the CTM Specifically, the pitch papers and/or proposal should specify which criteria will be met at which phase (Breadboard Phase 1, Prototype RIID Phase 2, or Post THOR)
Descriptor Criteria Threshold Objective Gamma Detection
The device during scanning operations shall alarm/provide an indication when the radiation field changes from ambient background to that with a non-background source of radiation present.
Probability of detection (PD) ≥80% at a relative speed of 0.3 m/s and distance of closest approach of 0.61 m of 0.66 µR/hr of Co-57 and separately 7.53 µR/hr of Ba-133.
PD ≥80% at a relative speed of 0.61 m/s and distance of closest approach of 1.22 m of 0.66 µR/hr of Co-57 and separately 7.53 µR/hr of Ba-133.
7 | P a g e e
Descriptor Criteria Threshold Objective Probability of Identification Unshielded
The device shall correctly identify with a probability of identification (PID) ≥ 80% the present radionuclides that are Unshielded and produce 50 μR/hr above background at the reference point of the gamma detector, with the exception of NORM (Ra-226. Th-232, K-40) that are to be 20 μR/hr above background.
Radionuclides/reactions listed as Priority 1, 2, and 3.*
Radionuclides/reactions listed as Priority 1, 2, 3, 4, and 5.
Transmit Method
The device shall be able to transmit data using all of the listed interfaces.
1) USB 2.0 or higher
2) WiFi 5 (802.11ac)
3) Bluetooth security mode
4) Removable media
5) Cellular
6) Bluetooth security mode
Size Device shall have small physical dimensions.
≤ 33 cm x 23 cm x 16 cm ≤ 16 cm x 10 cm x 8 cm
*The radionuclides/reactions prioritized list is included in the attached CTM.
Timeline
The following timeline is provided for planning purposes. The version 1 Pixelated CDMs and CFG CDMs will be complete by the end of March 2023.
Figure 3. Tentative Schedule
Phase Structure and Objectives
8 | P a g e
Each offeror will specify their preferred version of the TlBr design (Pixelated or CFG) they would like to pursue and clearly identify their chosen approach in the pitch paper and the proposal.
Research to be conducted under this topic solicitation will be a phased applied development activity. A nominal phase structure and objectives are described below:
• Phase 1 - “Breadboard” Integration (14 months): Upon the award of the THOR contracts to selected
RIID integration vendors, the necessary components will be integrated into breadboard gamma radiation design by THOR partners. The intent of the breadboard is to allow for initial research, design, and evaluation of the major components and functions of a RIID (i.e, CDM, processor, algorithm, display, power supply, etc). The first articles produced as a result of the Breadboard Integration phase will be tested/evaluated by the vendors against a subset of the THOR criteria to demonstrate progress and potential for meeting the THOR prototype criteria set. The main deliverables of Phase 1 are results of the testing/evaluation of the breadboard and a preliminary design of a TlBr RIID prototype for Phase 2. A Phase 1 Preliminary Prototype Review will be held near the conclusion of the Phase 1 to review the Phase 1 deliverables and the prototype assessment against a subset of the THOR CTM criteria as indicated in Attachment B-2a. The results of the Phase 1 Preliminary Prototype Review will support a decision on exercising the option to continue into Phase 2.
• Phase 2/ - Initial RIID (prototype) Integration (12 months): Vendors will continue RIID integration, prepare a final RIID design for a Phase 2 Final Prototype Review to be held prior to the conclusion of Phase 2, and deliver three prototype RIIDs/detectors. After the Phase 2 Final Prototype Review, during the last three months of the PoP, the Government will conduct prototype criteria testing of the 3 prototype RIIDs at a Government selected test facility to demonstrate a TRL 6. The basis for the testing will be the Government approved criteria developed by the THOR Program (See Attachment B-2). An operational demonstration of the prototypes will also be conducted in the same facility, as part of a TRL 6.
6. Deliverables: The following minimum deliverables will be required under traditional procurement contracts awarded to those offerors whose proposals are selected for the award. Performers should define additional program-specific deliverables as appropriate for their proposed approach.
Progress Reviews (PR) – The PRs will be held monthly unless otherwise directed by the CWMD PM and the briefing slides are due 1 week prior to the PR. A PR briefing will be comprehensive in nature and must include, where appropriate:
Executive Summary
1. Conceptual Overview
2. Capabilities, Performance targets, and Goals
3. Development Approach (technical tasks, teams, schedule)
4. Key Challenges/Issues to Address
5. Risks and Mitigation
6. Accomplishments and Highlights
7. Milestones (MS): List all and progress towards each
8. Remaining Issues
9. Schedule: Gantt chart with MSs and deliverables indicated
10. Cost (planned, actual, actual plus commitments)
9 | P a g e
11. Effort for next reporting period (month/phase) as appropriate
Detailed technical and programmatic discussion (as long as required)
12. Accomplishments: Plan vs Actual, per Task activities
13. Prototype RIID Design Description
14. Performance Prediction relative to THOR prototype requirements
15. Schedule: Gantt chart by major task with WBS-tracked list of milestones and deliverables included
16. Cost: Expenditure burn over period of performance – monthly plan, actuals, actuals plus commitments (to date) in tabular and graphical form
17. Proof of Concept (Breadboard/Brassboard RIID)
18. Proposed Follow-on Effort
19. Key Objectives
20. Technical issues: Risks and mitigation strategy
21. Plans to complete phase
22. Technical Plans for next reporting period/to complete phase, as appropriate
23. Cost and Schedule to include variance
24. Questions (as needed)
25. Any additional information required by the CWMD program manager (PM)
Meeting minutes shall be generated within 1 week after the PR. The PR does not replace the monthly progress report.
Prototype Reviews –A Phase 1 Preliminary Prototype Review will be held near the conclusion of the Phase 1. The outcome of the Phase 1 Preliminary Prototype Review and review of provided test and evaluation results of the breadboard prototype will be the basis for determining continued funding for the follow-on phase. Phase 2 Final Prototype Review is to be held prior to the conclusion of Phase 2.
The Phase 2 Final Prototype Review is also intended to include elements of a test readiness review in preparation for the CWMD-led testing.
Project Schedule Updates – schedule file submissions once every other week:
• Updated schedule (MS Project file with file name indicating version number)
• Schedule compliance check (DCMA 14-point assessment)
Monthly Progress Report – Written report (see Attachment H) due 2 weeks after the last day of each calendar month, including at minimum:
• Accomplishment and Highlights since last review
• 90-day look-ahead of scheduled activities
• Schedule critical path (within the 90 days reported)
• Schedule watch items (within the 90 days reported)
• Schedule Variance Report (regarding major milestones)
• Comprehensive accounting of all funds expended
• Cost Variance Report
• Risk Status
• Key Challenges
10 | P a g e
• Technical Highlights
• Status of monitoring Government-provided sensitive data and compliance with data retention requirement
• Questions (as needed)
• Any additional information required by the CWMD program manager
• Management Plan - Within 2 weeks after the contract award, the vendor shall provide a management plan, updated from the proposal, and laying out the approach for accomplishing the project. A kickoff meeting shall be held within the first 3 weeks after the contract award to discuss the management plan.
Vendor In-house Test and Evaluation Plans – Internal test and evaluation plan for Phase 1 provided to CWMD 1 month after the Phase 1 kickoff to be reviewed and approved by CWMD T&E. Internal test and evaluation plan for Phase 2 provided to CWMD 1 month after the Phase 2 kickoff to be reviewed and approved by CWMD T&E.
Vendor In-house Test and Evaluation Reports – Internal test and evaluation results and data due 2 weeks prior to Phase 1 Preliminary Prototype Review. Internal test and evaluation results and data due 2 weeks prior to Phase 2 Final Prototype Review.
Preliminary and Final RIID Designs – Preliminary and Final RIID Design documentation shall be provided 2 weeks prior to the Phase I Preliminary Prototype Review and Phase II Final Prototype Review, respectively.
Additional Phase I Deliverables
• Any additional information as requested by the CWMD PM.
Additional Phase II Deliverables
• Three copies of final THOR Prototype RIIDs due 2 weeks prior to Phase 2 Final Prototype
Review. The Prototype RIIDs are to be shipped directly to address to be specified by the PM.
• THOR Prototype RIID operator manual.
• Example data files from the instrument.
• Providing CWMD test team support, including training the CWMD test team on the prototype
RIID instrument and answering questions from the test team via email exchanges or short meetings and instrument trouble shooting support during test integration and execution as needed.
• Algorithm Replay Tool compliant with the CWMD Replay Tool specifications (Attachment B3).
• THOR RIID Commercialization Plan, steps needed to get from TRL6 to a COTS product and notional timeline.
• Final Technical Report including Lessons Learned.
• Any additional information as requested by the CWMD PM.
7. Number of Selections: CWMD anticipates up to three awards under this OBAA topic solicitation.
8. Anticipated Ceiling: Although subject to appropriations and funds availability, it is anticipated that no more than $2,551,000 funds will be available for an individual resultant award for this OBAA topic solicitation for Phase I and Phase II combined. This amount includes up to $1,651,000 estimated for the Phase I Base Period and up to $900,000 estimated for Phase II Option. The aforementioned
11 | P a g e estimate assumes three awards granted.
Note: The Government will reserve the right to incrementally fund any resultant contract line-item numbers awarded from this OBAA topic solicitation as provided by the FAR 52.232-22, “Limitation of Funds.”
9. Anticipated Award Type: The Government intends to award cost plus fixed fee contracts. See
Section 1.6 of the overarching OBAA #70RDND19R00000003 for a list of contract vehicles that are possibilities for award under this topic solicitation.
10. Anticipated Award Dates: Fourth Quarter of Fiscal Year 2023 (Q4FY23) is when the Government anticipates making a resultant award for this topic solicitation. However, the award date may vary based on the quality of the proposals received and the availability of funds.
11. Pitch Papers: Pitch papers are being requested for this topic solicitation. Potential offerors are strongly encouraged to take advantage of the pitch paper process, but they are not required to submit a pitch paper in advance of a proposal. Pitch paper submission instructions and formatting guidance can be found in Sections 11.1 and of this topic solicitation.
11.1 Pitch Paper Submission Instructions
Pitch papers must be submitted on or before the deadline listed in the topic solicitation (no later than 30 calendar days from the topic solicitation posting), in electronic format and emailed to inbox – CWMDOBAA@hq.dhs.gov. See page 1 Section 3 for the specific date pitch papers in which pitch papers need to be received. Pitch paper submissions consist of one attachment in the email submission.
Specific guidance is provided below regarding the email and pitch paper file name format.
In the email subject line, please use “CWMD OBAA Pitch Paper Submission for <organization>, Topic Solicitation No. 70RWMD(FY)R00000014”
Each pitch paper file name will include the following: “CWMDOBAA-PP-0#-XXXX,” where “0#” = number of pitch paper submission, and “XXXX” = four letter character shortcut for organization name
Example: Company A, Inc.’s submission for one pitch paper comprised of one file in the attached email:
Subject: CWMD OBAA Pitch Paper Submission for Company A, Inc.
The email submission should at least include the following information:
• Organization: Company A, Inc.
• Submitted by: <first last name>, <title>, <email of submitter>
• Topic Solicitation No.: 70RWMD(FY)R00000014
• Attached file for submission:
1) Pitch paper: CWMDOBAA-PP-01-COMA.pdf
• Request for receipt confirmation? (YES or NO)
Hard copy, facsimile, or hand delivered pitch papers will not be accepted.
Pitch papers should be submitted in advance of the deadline for submission, to ensure completion of mailto:CWMDOBAA@hq.dhs.gov
12 | P a g e the electronic submission process by the date and time of the deadline, as stated in this topic solicitation. Any pitch paper submissions received by the Government after the deadline for submission will not be accepted. It is highly encouraged that offerors do not wait until the last minute to submit their pitch paper(s). Receipt of pitch papers will be handled in accordance with FAR
15.208 and FAR 52.215-1.
11.2 Format and Content of Pitch Paper
Pitch papers should capture the essence of a complete proposal and are designed to permit potential offerors an opportunity to obtain feedback from CWMD on their proposed project without having to go to the expense and effort of writing a full proposal. Such exchanges are to improve the understanding of Government requirements and industry capabilities, thereby allowing the potential offerors to judge if they can satisfy the Government’s requirements and to enhance the Government’s ability to obtain quality supplies and services, at reasonable prices, and increase efficiency in proposal preparation, proposal evaluation, and contract award. A pitch paper shall consist of a maximum of three pages, including all pictures, figures, tables, and charts in legible size. The quad chart described below is included in the three-page limit. The cover sheet will not be included in the three-page limit.
A pitch paper is a single electronic file in PDF format, viewable by Microsoft Windows-7 compatible machines. The individual pitch paper file size must be no more than 5 MB. Pitch papers shall not exceed three pages (standard size: 8.5” by 11”) using 1” margins and 12-point fonts or larger for text and 9-point fonts or larger for pictures, figures, tables and charts. The pitch paper should include the following information in this order:
• Cover Sheet (see Attachment C for format, not included in page limit).
• Quad Chart (see Attachment E for format, included in page limit).
• One-page summary capturing information not included in the quad chart or cover sheet abstract to include:
o Technical Approach and Critical Path: Describe the main research goals, and main tasks and methodologies to be employed to achieve these goals. Point out the critical research path to the proposed investigation, to include what will specifically be accomplished during the initial phase(s) of the effort to achieve research objectives.
o Team Capability and Experience: List and describe the extent of your team’s experience and current capabilities to successfully execute the proposed research project.
o Management Approach: Provide a summary description of the management structure and approach for the effort.
o Cost: Provide a Rough Order of Magnitude cost to accomplish the technical approach.
If the pitch paper is found to be responsive to the topic, CWMD will schedule a brief (no more than 20 minutes) scientific engagement discussion with the offeror. The primary purpose of the scientific engagement discussion is for the Government to learn more about the proposed prototype, the potential offeror, and its capabilities. The Government will not be obligated by these discussions and nothing discussed will authorize the potential offeror to work, start work, or bill for work. During these scientific discussion engagement sessions, CWMD:
• Will ask clarifying questions about the information provided in the pitch paper. This includes questions to obtain a better understanding of the advantages and issues associated with a technical
13 | P a g e approach.
• Will not attempt to replace the potential offeror’s original ideas with their own.
• Will not provide information concerning the objectives/criteria of the topic to one potential offeror without providing the information to all potential offerors.
• May note that a particular proposed feature or capability is not required by the Government to meet topic objectives or criteria and will provide that information regarding such functions or capabilities to all potential offerors.
• Will not share ideas of technical solutions that were provided by another potential source.
After this review, CWMD will notify potential offerors, either encouraging or not encouraging submission of a proposal. It is anticipated that responses will be provided no later than 10 days after the pitch paper deadline. If a proposal submission is not encouraged, the general basis for the opinion to not encourage further participation will be provided. If a proposal submission is encouraged, comments and questions regarding the pitch paper submission will be provided, which may include comments regarding the potential offeror’s apparent capability and experience and management approach.
Pitch papers will be reviewed against 2 criteria, in descending order of importance:
Strategic Impact and Technical Approach. If a proposal submission is encouraged, comments and questions regarding the pitch paper submission will be provided, which may include comments regarding the potential Offeror’s apparent Capability and Experience and Management Approach. A description of these criteria can be found in Section 13.
12. Proposal Format and Submission Process:
CWMD will not reimburse offerors for any proposal preparation costs. Proposals shall remain valid from the date of submission for at least six (6) months.
Offerors shall submit proposals no later than the deadline set forth in the topic solicitation and the notification letters encouraging proposal submission. Offerors shall submit proposals in electronic format and email their proposals to inbox – CWMDOBAA@hq.dhs.gov. An offeror may choose to alter their ideas, concepts, technical approaches, etc. or expand on their original ideas reflected in the offeror’s pitch paper (if submitted) at any time after the submission of the offeror’s pitch paper and prior to the offeror’s submission of their proposal. Exchanges between the Government and a potential offeror regarding the potential offeror’s pitch paper are not binding.
Proposals consist of three separate documents described in detail below:
• Volume I: Technical and Management proposal (Not to exceed 16 pages. The cover sheet (Attachment D) will not be included in the 16-page limit).
• Volume II: Supplemental Data (Not to exceed 30 pages).
• Volume III: Cost proposal (No page limit).
Volume I is the primary document to be evaluated by the technical reviewers, with Volumes II and III providing supporting information. Note that Volume I should be a standalone document describing, consistent with the sections below, the material aspects of the proposed effort. The supplemental material
14 | P a g e in Volumes II and III are intended to support Volume I’s statements and ensure compliance with non-technical aspects of the solicitation. All volumes will be evaluated by the Contracting Officer to ensure compliance with the requirements of the OBAA. For instance, Volume III will serve as the formal cost submission for future contracting discussions should the proposal be recommended for the award from a technical aspect.
Specific guidance is provided below regarding the email and proposal file name format.
Offerors shall submit proposals in electronic format and email their proposals to the inbox – CWMDOBAA@hq.dhs.gov. In the email subject line, please use “CWMD OBAA Proposal Submission for <organization>, Topic Solicitation No. 14: 70RWMD23R00000004”.
Each proposal file name will include the following: “CWMDOBAA-VOL#-FP-0#-XXXX,” where “VOL#” = volume number, “0#” = number of proposal submission, and “XXXX” = four letter character shortcut for organization name.
Example: Company A, Inc.’s submission for one proposal comprised of the three separate files in the attached email:
Subject: CWMD OBAA proposal Submission for Company A:
• Volume I file name: CWMDOBAA-VOL1-FP-01-COMA (.pdf file)
• Volume II file name: CWMDOBAA-VOL2-FP-01-COMA (.pdf file)
• Volume III file name: CWMDOBAA-VOL3-FP-01-COMA (.xls or .xlsx file)
The email for the proposal submission should at least include the following information:
• Organization: Company A, Inc.
• Submitted by: <first last name>, <project title>, <email of submitter>
• Topic Solicitation No: Topic Solicitation No. 14: 70RWMD23R00000004
• Attached Files for Submissions:
1. Volume I – CWMDOBAA-VOL1-FP-01-COMA.pdf
2. Volume II – CWMDOBAA-VOL2-FP-01-COMA.pdf
3. Volume III –…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .