70RWMD22R0000008 Attachment 5 OBAA Topic Solicitation No. 12 - SOW_RandD_Template.doc
DOC document 118 KB Posted
- Attached to
- Request for Proposal for research topic titled “Mulit-Sensor Multi-Data Analysis” as Topic Solicitation No. 12 under the 5 Year CWMD R&D OBAA 70RDND19R00000003 Federal contract opportunity
- Solicitation number
- 70RWMD22R00000008
About this file
This document is a Request for Proposal (RFP) soliciting proposals for research on multi-sensor and multi-data analysis to support the Department of Homeland Security's Countering Weapons of Mass Destruction office. The RFP includes an 84-page solicitation document and seven attachments providing additional requirements information. It seeks proposals to improve existing data analytics capabilities or develop new capabilities for targeting and interdicting potential CWMD threats both domestically and with foreign partners. Proposals are due by [date redacted] in accordance with the requirements of Topic Solicitation No. 12 and the overarching Research and Development Open Broad Agency Announcement No. 70RDND19R00000003. The selected vendor will support the DHS CWMD Research and Development Division's focus area on data analytics improvements.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
DEPARTMENT OF HOMELAND SECURITY (DHS)
STATEMENT OF WORK (SOW)
FOR
<Enter Proposal Title> NOTES ON USING THIS TEMPLATE: This template is intended to assist you in preparing a comprehensive Statement of Work for services. The template provides a basic standard outline for the SOW and sample paragraph language. Your SOW should be tailored to meet the needs of your specific requirement. This template can be edited as you and your Contracting Officer deem necessary to delete areas that are not applicable to your requirement and/or to add areas that are unique to your requirement. The template can be used to prepare SOWs for contracts, task orders, and inter/intra-agency agreements.
IMPORTANT: All instructions (highlighted in blue), user notes (highlighted in pink), and user input guidance (highlighted in yellow) should be removed before finalizing the SOW document.
1.0 GENERAL
1.1 Background
Provide relevant background information that will be useful to contractors in understanding the need for the services and to assist the contractors in understanding how DHS past practices or current policies could impact future efforts.
Describe the project in general terms. Discuss the purpose of the project; why the project is being pursued; and, if relevant, how the project relates to other projects.
1.2 Scope
The scope should be a concise statement to provide the reader with an understanding of the magnitude and limitations of the work to be performed. It should specify the range and limits of the requested products and/or services. In some instances, including negative scope (i.e., what this SOW is not for or does not cover) may be appropriate.
1.3 OBJECTIVE
This should be a concise statement that describes the objective or desired goal you are trying to achieve with this solicitation. Provide a concise overview of the project and how the results or end products will be used.
1.4 APPLICABLE DOCUMENTS
Reference any documents (include date and version) that pertain to the requirement and are necessary for the contractor to perform the contract. If only portions of a document apply, be sure to clearly state the applicable portion(s). Also be sure to cite the document properly using conventional citation formats for statutes, regulations, etc. Be sure to attach, link, or otherwise make the required documents available to contractors.
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
<Enter solicitation number, proposal identification number, and proposal title>
1.4.2 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in this document:
<List document references>
2.0 SPECIFIC REQUIREMENTS/TASKS
Describe in clear, understandable terms exactly what you want the contractor to do, including any deliverables you expect from the contractor. Number each task and sub-task in this section to make it clear when referring to tasks/sub-tasks in other sections of this document, or if contractors have a question about a specific task description. Do not put more than one task per numbered paragraph or sub paragraph. Individual paragraphs for each task description, identified in a logical progression, will facilitate costing, referencing and tailoring tasks.
Do not restate in the SOW information that will be incorporated in other sections of the solicitation. If you have to refer to information explained in other sections of the solicitation, provide the reference to that section, do not re-write the information.
Here are some other points to keep in mind:
· Use the word “shall” whenever a provision is mandatory. For example: “The contractor shall . . . .” The word “will” expresses clarity of purpose or intent and usually refers to the government.
· Use active, rather than passive voice for the requirements so the contract is clear about what the contractor must perform, (e.g., “The Contractor shall provide program management support,” not “Program management support shall be provided by the Contractor”).
· Use simple sentence structure.
· Avoid redundancy.
· Use verbs that correctly describe the work requirements, such as implement, install, track, document, use, identify, create, inform, maintain, conduct, record, define, develop, perform, integrate, test, revise, monitor, assist, provide, resolve, etc.
· Avoid using words such as ensure, assure, best, all, every, certify, average, adequate, equal, any, either, and/or, and to the extent necessary.
· Avoid using pronouns when the applicable noun can be used.
· Use the same term for a particular item. Do not use variations of the term.
· Avoid ambiguity. Be specific, (e.g., “support services” is ambiguous).
· Define terms that need to be defined. Define acronyms the first time they are used in the SOW.
· Ensure deliverables are clearly stated and described.
· Ensure performance standards you are requiring in the SOW are necessary, realistic, specific, verifiable, objective, and measurable.
· Ensure acceptance criteria are clearly stated. Acceptance criteria may be cited in the paragraph that describes the deliverable or you may insert another column on the Deliverables chart in SOW 9.0.
· The SOW should provide the contractor with answers to six basic questions: who, what, when, where, how many or how much, and how well? It is important for the SOW to accurately answer these questions in order to allow the contractor the opportunity to accurately assess the level of expertise, the resources required, and the risks involved. Also, remember that a contractor will use the SOW to prepare its proposal, including its cost proposal, and a well written SOW also aids the Government in conducting the source selection evaluation and administering the contract performance after award.
· The SOW should identify only minimum requirements, eliminating the “nice to haves.” Consider the use of a program Work Breakdown Structure (WBS) to outline the required work effort. A WBS is an outcome-oriented analysis of the work involved in a project that defines the total scope of the project. It divides a project or major activity into successive levels, in which each level is a finer breakdown of the preceding one. In final form, a WBS is very similar in structure and layout to a document outline with each item at a specific level of a WBS numbered consecutively.
· The requirements/tasks should be presented in sequential or some other logical order.
· The SOW should follow the phase structure identified in the topic area.
· The SOW becomes the standard for measuring contractor performance. The sentences should be written so that there is no question of whether the contractor is obligated to perform specific tasks. As the contracted effort progresses, the government and the contractor look to the SOW to determine rights and obligations concerning what work is required to be performed. Often, how well the SOW is written determines the legal enforceability of the contract and also is the determining factor in resolving scope of work issues.
· Don’t assume anything. Keep asking yourself what is missing from the SOW.
2.1 TASK ONE. <Add title of specific task>
Xxxxxxx
2.1.1 Xxxxx (DEFINE QUANTITATIVE (performance or time) MILESTONE FOR EACH SUBTASK. Current phase should be more detailed than future phases. Each new phase should have these milestones defined.
2.1.2 Xxxxx
2.2 TASK TWO. <Add title of specific task>
Xxxxxxx
2.2.1 Xxxxx
2.2.2 Xxxxx
2.3 TASK THREE. <Add title of specific task>
Xxxxxxx
2.3.1 Xxxxx
2.3.2 Xxxxx
3.0 CONTRACTOR PERSONNEL
It is the responsibility of the contractor to propose qualified contractor personnel to perform all requirements specified in the SOW. As a general rule, the government should not specify education, experience or other qualifications for contractor personnel. In some instances, however, it may be necessary for the government to specify contractor qualifications, certifications, and/or education. For example, there may be a need for a Certified Public Accountant (CPA) for a requirement for financial support services. Similarly, you may deem it necessary to specify qualifications, certifications, and/or education for contractor Subject Matter Experts. And, it is recommended that you specify minimum qualifications, certifications, and/or education for contractor Key personnel and obtain resumes for those positions. Before including education, experience or other qualifications for contractor personnel in the SOW, discuss the matter with your Contracting Officer.
The government should not, as a general rule, specify the labor category(ies) the contractor should propose. In some instances, however, it may be necessary for the government to specify the labor category(ies) and even staffing levels. Before including labor categories and/or staffing levels in the SOW, discuss the matter with your Contracting Officer.
3.1 Qualified Personnel
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
3.2 Continuity of Support
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
3.3 Key Personnel
If resumes are required in response to the solicitation, the government will have the opportunity to review the qualifications, education and experience of proposed contractor personnel. In some instances, the government may determine that a position is “key” to the successful performance of the requirement. “Key” positions should be identified in the solicitation and the contractor should be requested to submit Employment Commitment Letters with its proposal. In these cases, the following paragraph should be included in the SOW:
Because of the sensitive nature of the operational sensor data and the burden of DHS background investigations for contractor employees working directly with the data, all contractor employees that will access data on the DHS CWMD cloud shall be identified as key positions under this SOW, and they must be US Citizens.
Before replacing any individual designated as Key by the Government, the Contractor shall notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes shall possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor shall not replace Key Contractor personnel without approval from the Contracting Officer. The following Contractor personnel are designated as Key for this requirement. Note: The Government may designate additional Contractor personnel as Key at the time of award.
<List the positions designated as Key for the requirement, to include the Principal Investigator and Project Manager and any employee who will have access to sensitive information on the DHS CWMD cloud.>
3.4 Project Manager
The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the COR. It is anticipated that the Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.
3.4.1 The Project Manager shall be available to the COR via telephone between the hours of XXXX and XXXX EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems
4.0 OTHER APPLICABLE CONDITIONS
This area should address other information the Contractor will need and/or requirements the Contractor will need to accomplish in the performance of the SOW. It is highly recommended that the topics included in SOW 4.1 through SOW 4.14 be addressed in the SOW. Additional topics may be added as appropriate.
4.1 SECURITY
Contractor access to Sensitive But Unclassified (SBU) data, also known as For Official Use Only (FOUO) data, will be required under this SOW. Operational sensor data to be furnished by DHS is FOUO. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with DHS MD 11042.1, Safeguarding Sensitive But Unclassified (For Official Use Only) Information. Contractor employees shall submit DHS Form 11000-6, Sensitive But Unclassified Information Non-Disclosure Agreement (NDA), as a condition of access to such information or products derived from this information. Furthermore, contractor employees intending to access SBU data on the DHS CWMD cloud must have a DHS background check to establish their suitability.
4.2 Period of Performance
The period of performance for this contract is a xx month base period with <insert number of option periods> option periods as follows:
Base Period/Phase xx insert length in months Option Period One/Phase xx insert length in months Option Period Two/Phase xx insert length in months Option Period Three/Phase xx insert length in months Option Period Four/Phase xx insert length in months
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities with frequent visits to the Department of Homeland Security facilities in the Washington Metro Area.
4.4 Travel
Contractor travel shall be required to support this requirement. All travel required by the Government outside the local commuting area(s) will be reimbursed to the Contractor in accordance with the Federal Travel Regulations. The Contractor shall be responsible for obtaining COR approval (electronic mail is acceptable) for all reimbursable travel in advance of each travel event.
4.5 POST AWARD/KICK-OFF MEETING
The Contractor shall attend a Post Award/Kick-off meeting with the Contracting Officer and the COR no later than 20 business days after the date of award. The purpose of the Post Award/Kick-off meeting, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility or via teleconference.
4.6 PROGRESS REPORTS
The Project Manager shall provide a monthly progress report to the Contracting Officer and COR via electronic mail based on a CWMD specified template. The report will be due on the 15th of every month. This report will include a summary of all Contractor work performed, including a breakdown of labor hours by labor category, all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.
4.7 PROGRESS MEETINGS
The Project Manager shall meet with the COR on a quarterly basis and/or in association with end of the project phase to discuss progress, exchange information and resolve emergent technical problems and issues. Briefing materials will be prepared for these discussions in accordance with a Government provided template. These meetings will take place at either the Government’s or Contractor’s facilities, or other location as mutually agreed to by both parties, or via teleconference.
4.8 GENERAL REPORT REQUIREMENTS
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows 10 and Microsoft Office Applications).
4.9 INTELLECTUAL PROPERTY
It is recommended that you discuss intellectual property matters with your Contracting Officer and a DHS General Law Attorney. The General Law Attorney will involve a DHS Intellectual Property Attorney, as needed. If the Offeror’s proposal is selected for funding, the Contracting Officer will contact the apparent awardee so that the apparent awardee has the opportunity to submit assertions in accordance with FAR clause 52.227‐20. The assertions must be identified and assertion of use, release, or disclosure must be provided for the government’s review and acceptance. Contracts cannot be awarded until assertions have been approved. This section will include text capturing the approved assertions information.
4.10 PROTECTION OF INFORMATION
Contractor access to information protected under the Privacy Act may be required under this SOW. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.
Contractor access to proprietary information may be required under this SOW. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.
6.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide the following information, data and documents to the Contractor for work required under this contract: data sets including various sensor data types and descriptions of each data set.
Non-operational data sets will be available for download. Operational data sets will reside within the DHS cloud unless otherwise agreed upon.
The Contractor shall use Government furnished information, data and documents only for the performance of work under this contract, and shall be responsible for returning all Government furnished information, data and documents to the Government at the end of the performance period. The Contractor shall not release Government furnished information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer.
The Government will provide to the contractor access to computing resources on a DHS-managed cloud for the purpose of accessing sensitive operational data sets.
The Government will provide copies of the references cited in SOW 1.4 at the Post Award Conference.
7.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 6.0.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will have 7 business days to review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will provide an e-mail to the Contractor notifying them that the deliverable has been accepted.
The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor will have 7 business days to address deficiencies and return it per delivery instructions.
9.0 DELIVERABLES
The Contractor will consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.
| ITEM |
| DELIVERABLE |
| DUE BY |
| DISTRIBUTION |
| 1 |
| Kick-off meeting, to include kick-off briefing materials in a CWMD provided template |
| No later than 20 days post Contract Award |
| COR/PM, Contracting Officer |
| 2 |
| Monthly Progress Report |
| No later than the15th day of each month of the following Contract Award. Monthly Dates TBD prior to Award. |
| COR/PM, Contracting Officer |
| 3 |
| Quarterly Performance Review Briefing Materials |
| Provide PowerPoint copy to COR/PM at least 7 days before scheduled performance review (Location/Mode: TBD) |
| COR/PM, Contracting Officer |
| 4 |
| Preliminary Design Review Presentation |
| Provide PowerPoint copy to COR/PM at least 7 days before scheduled performance review, which occurs before the last day of Phase I |
| COR/PM, Contracting Officer |
| 5 |
| Critical Design Review Presentation |
| Provide PowerPoint copy to COR/PM at least 7 days before scheduled performance review, which occurs before the last day of Phase II |
| COR/PM, Contracting Officer |
| 6 |
| Test Readiness Review Presentation |
| Provide PowerPoint copy to COR/PM at least 7 days before scheduled performance review, which occurs before the last day of Phase III |
| COR/PM, Contracting Officer |
| 7 |
| Meeting Notes |
| Provided to the COR/PM no later than 14 days after the review, and no later than the last day of the contract. |
| COR/PM, Contracting Officer |
| 8 |
| End of Phase Report |
| No later than 14 days after end of phase (Location: TBD) |
| COR/PM, Contracting Officer |
| 9 |
| Comprehensive Final Report for Project |
| No later than the last day of the Period of Performance of the entire project |
| COR/PM, Contracting Officer |
| 10 |
| Interim software bill of materials |
| 7 days prior to the end of Phase II |
| COR/PM, Contracting Officer |
| 11 |
| Final Software Bill of Materials and Artifacts Required under Executive Order 14028 |
| 7 days prior to the last day of the Period of Performance of the entire project. |
| COR/PM, Contracting Officer |
| 12 |
| Source code and documentation |
| 7 days prior to the last day of the Period of Performance of the entire project. Delivery mode TBD. |
| Notification to be included in the final report. |
All deliverables shall be sent in accordance with the table to the Contracting Officer (CO) and Contracting Officer’s Representative (COR) identified in the contract Terms & Conditions. All financial and management reports shall be sent electronically to the COR, CO, and any Contract Specialist (CS) at the addresses listed in the contract Terms & Conditions.
10.0 POINTS OF CONTACT
<<Insert performer’s name>> Points of Contact (POCs) are as follows:
· Technical POC(s) – <<provide name, address, e-mail, phone for Principle Investigator and Project Manager>>
· Financial POC(s) – <<provide name, address, e-mail, phone for business POC>> <<Insert performer’s name>> may change the individual designated as a POC upon notice to the COR and CO of such change.
The DHS POCs are as follows (Note: Will be filled out by CWMD if selected for award):
· Contracting Officer <<CO name>>
Countering Weapons of Mass Destruction (CWMD) Office
U.S. Department of Homeland Security
<<Insert CO’s phone number>>
<<Insert CO’s e-mail >>
· Contracting Officer’s Representative <<COR name>>
Countering Weapons of Mass Destruction (CWMD) Office
U.S. Department of Homeland Security
<<Insert COR phone number>>
<<Insert COR e-mail >>
· Alternate Contracting Officer’s Representative <<COR name>>
Countering Weapons of Mass Destruction (CWMD) Office
U.S. Department of Homeland Security
<<Insert COR phone number>>
<<Insert COR e-mail >>
· Resource Manager <<Resource manager name>>
Countering Weapons of Mass Destruction (CWMD) Office
U.S. Department of Homeland Security
<<Insert Resource Manager’s phone number>>
<<Insert Resource Manager’s e-mail >>
DHS CWMD may change the individual designated as a POC upon notice to <<insert performer’s name>>.