70RWMD22R00000008 SF 33 Topic 12 Solicitation 26 May 2022.pdf
PDF 288 KB Posted
- Attached to
- Request for Proposal for research topic titled “Mulit-Sensor Multi-Data Analysis” as Topic Solicitation No. 12 under the 5 Year CWMD R&D OBAA 70RDND19R00000003 Federal contract opportunity
- Solicitation number
- 70RWMD22R00000008
About this file
This request for proposal solicits technical and cost proposals for a research project titled "Multi-Sensor Multi-Data Analysis" under Topic Solicitation No. 12 of the Department of Homeland Security's Countering Weapons of Mass Destruction Research and Development Broad Agency Announcement. The project supports improvements to existing data analytics capabilities for targeting and interdicting potential weapons of mass destruction threats. Vendors must submit proposals in accordance with the topic solicitation, its eight attachments totaling 84 pages, and the overarching 5-year BAA. Proposals are due by the response date specified in the solicitation. The potential cost-plus contract would include a 6-month base period not to exceed $350,000 for preliminary design review, a 9-month optional period not to exceed $700,000 for critical design review, and a 6-month optional period not to exceed $450,000 for final product characterization readiness review.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 7900)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X X X
X
70RWMD22R00000008
TABLE OF CONTENTS:
1. Listing of Incorporated Purchase Requisitions
2. Section B - Supplies or Services and Prices/Costs
3. Section C - Description/Specifications/Work Statement
4. Section D - Packaging and Marking
5. Section E - Inspection and Acceptance Terms
6. Section F - Delivery or Performance
7. Section G - Contract Administration Data
8. Section H - Special Contract Requirements
9. Section I - Contract Clauses
10. Section J - List of Documents, Exhibits, and other Attachments
11. Section K - Representations, Certifications, and Other Statements of Offerors
12. Section L - Instructions, Conditions and Notices to Offerors
13. Section M - Evaluation Factors for Award
OBAA Topic Solicitation No. 12 (RFP # 70RWMD22R00000008) Summary:
The Department of Homeland Security (DHS), Office of Procurement Operations (OPO), Countering Weapons of Mass Destruction Acquisition Division (CWMDAD) issues this Request for Proposal (RFP) to solicit capable vendors for the submission of technical and cost proposals in accordance with this Topic Solicitation No. 12, RFP No. 70RWMD22R00000008, titled “Multi-Sensor and Multi-Data Analysis ", its attachments, and the overarching Research and Development (R&D) Open Broad Agency Announcement (OBAA) No. 70RDND19R00000003. This requirement supports the DHS Countering Weapons of Mass Destruction (CWMD), Research and Development Division (RDD), under BAA focus area CWMD.01 – Data Analytics: Improvements over existing data analytics capabilities or creation of new data analytics capabilities for point, local, regional, national and/or worldwide targeting and interdiction of potential CWMD threats or indicators of potential CWMD threats by domestic and foreign partners.
RFP & Attachments:
Total pages: 84
List of Attachments •Attachment 1 - OBAA Topic Solicitation No. 12 – Multi-Sensor, Multi-Data Analysis, 24 Pages •Attachment 2 OBAA Topic Solicitation No. 12 - Pitch Paper Cover Sheet, 2 pages •Attachment 3 OBAA Topic Solicitation No. 12 - Quad Chart, 1 Page •Attachment 4 OBAA Topic Solicitation No. 12 - Proposal Cover Sheet, 2 Pages •Attachment 5 OBAA Topic Solicitation No. 12 -SOW_RandD_Template, 6 Pages •Attachment 6 OBAA Topic Solicitation No. 12 – Economy Act IAA SOW Template, 9 Pages •Attachment 7 OBAA Topic Solicitation No. 12 – DOE Lab IAA SOW Template, 6 Pages •Attachment 8 OBAA Topic Solicitation No. 12 – Company-to-Company NDA Mayvin, 1 Page
1. Listing of Incorporated Purchase Requisitions
Incorporated Purchase Requisition Numbers:
2. Section B - Supplies or Services and Prices/Costs
Item Number Base Item Number
Supplies/Services Quantity Unit
0001 Base Period: Phase I -Review Data Sets, Tailor Approach, Preliminary
Design Review
1 LO
Contract Type:Cost Contract Total Estimated Cost
Description:
Phase I (6 months, not to exceed $350,000) – Review Data Sets, Tailor Approach, Preliminary Design Review
Purchase Requisitions
IDC Type: Not Applicable FSC Codes: AJ12 GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL
SCIENCE AND TECHNOLOG
NAICS Code: 541715 Research and Development in the Physical, Engineering, and Life
Sciences
Supplies/Services Quantity Unit
1001 0001 Option Period 1: Phase II - Development Leading to a Critical
Design Review
1 LO
Contract Type:Cost Contract Total Estimated Cost
Description:
Phase II (9 months, not to exceed $700,000) – Development Leading to a Critical Design Review
Purchase Requisitions
Option: 1 Option Time Date: 3/15/23 Option Time Duration: 274 Option Time Units: Days IDC Type: Not Applicable FSC Codes: AJ12 GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL
SCIENCE AND TECHNOLOG
Supplies/Services Quantity Unit
2001 0001 Option Period 2: Phase III -Develop the Final Product Leading to a Characterization Readiness
Review
1 LO
Contract Type:Cost Contract Total Estimated Cost
Description:
Phase III (6 months, not to exceed $450,000) – Develop the Final Product Leading to a Characterization Readiness Review
Purchase Requisitions
Option: 2 Option Time Date: 12/14/23 Option Time Duration: 184 Option Time Units: Days IDC Type: Not Applicable FSC Codes: AJ12 GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL
SCIENCE AND TECHNOLOG
Clauses incorporated by reference
None
Clauses incorporated by full text
Contract Line Items and Costs TBD prior to Award.
3. Section C - Description/Specifications/Work Statement
Statement of Work Attachment #1 OBAA Topic Solicitation No. 12 – Multi-Sensor, Multi-Data Analysis, 24 Pages
Final Statement of Work will be incorporated at time of Award.
4. Section D - Packaging and Marking
Packaging and Marking
5. Section E - Inspection and Acceptance Terms
Article Number Reference Text
52.246-9 52.246-9 INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984)
Inspection and Acceptance Further Details TBD prior to Award.
6. Section F - Delivery or Performance
52.242-15 Alt I 52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)
Period of Performance (estimated) Estimated Duration by Period:
Base Period (Phase I): 6 monthsOptional Period 1 (Phase II): 9 monthsOptional Period 2 (Phase III): 6 months
Note: Specific Period of Performance Dates to be determined prior to Award.
7. Section G - Contract Administration Data
Requesting Office Address Office of Procurement Operations (OPO) U.S. Dept. of Homeland Security 301 7th Street SW, Mailstop 0115 MGMT/OPO/Mailstop 0115 Washington DC 20528-0115 Phone: Fax:
Contact Details:
Property Administration Office Address Countering Weapons of Mass Destruction/MS0315 Mail Stop 0315 Department of Homeland Security 301 7th Street SW Washington DC 20528
COR Office Address Countering Weapons of Mass Destruction/MS0315 Mail Stop 0315 Department of Homeland Security 301 7th Street SW Washington DC 20528
Issuing Office Address Office of Procurement Operations (OPO) U.S. Dept. of Homeland Security 301 7th Street SW, Mailstop 0115 MGMT/OPO/Mailstop 0115 Washington DC 20528-0115 Phone: Fax:
Contact Details:
TONI, SARA
SARA.TONI@HQ.DHS.GOV
Contract Administration Data
G.1 PAYMENT OFFICE
The payment office for this Contract is:
CWMD
United States Coast Guard Finance Center
CWMD Invoices
P. O. Box 4111
Chesapeake, VA 23327
Email address: FIN-SMB-CWMDINVOICES@USCG.MIL
G.2 INVOICES
The Contractor shall invoice once a month (1st of the month, unless otherwise agreed upon between the COR, Finance Office, and the Contractor in writing).
1. The first invoice will be drafted by the Prime Contractor and submitted for review by email to the Contracting Officer at Evelyn.dean@hq.dhs.gov with a courtesy copy to the Contract Specialist at Sara.Toni@hq.dhs.gov prior to actual submission for payment.
2. Invoices are required to be submitted by the Prime Contractor as follows:
EMAIL:
a. FIN-SMB-CWMDInvoices@uscg.mil
b. Prime Contractor must ensure a dated confirmation of receipt from USCG FINCEN is provided.
c. Contracting Officer
d. Contracting Officer's Representative
Prime Contractor may mail or fax a courtesy copy the following:
MAIL:
CWMD United States Coast Guard Finance Center CWMD Invoices
P. O. Box 4111 Chesapeake, VA 23327
FAX:
CWMD Fax Number: 757-413-7315
3. All invoices must include (at a minimum) the following detail:
• Contract Number
• Contract period of performance
• Requirement Name: IRIS-BD for Multiplexed Biothreats
• Invoice monthly billing period dates
• Total invoice charges per CLIN to include current and cumulative charges
• Description of Services for each CLIN (e.g., Labor/Travel/ODC)
• Total Invoice Amount
• Remaining Un-Invoiced CLIN Value and Contract Value
• Supporting documentation to support invoice Labor, Travel and/or ODC's
Note: Further updates/details to this section may need to be updated and finalized prior to award.
8. Section H - Special Contract Requirements
Special Contract Requirements Please see the 5-yr OBAA and Topic Solicitation #12 for more information. Further Details for this section are TBD prior to Award.
Per FAR 16.301-3 Cost Reimbursement Contracts Limitations: The Contractor must have an approved accounting system in order to be eligible for a Cost Reimbursement Contract award.
9. Section I - Contract Clauses
52.202-1 52.202-1 DEFINITIONS (JUN 2020)
52.203-10 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (JUN 2020)
52.203-17 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT
TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)
52.203-19 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
52.203-3 52.203-3 GRATUITIES (APR 1984)
52.203-5 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-7 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
52.203-8 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
52.204-10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
52.204-13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-18 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204-19 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.204-2 52.204-2 SECURITY REQUIREMENTS (MAR 2021)
52.204-4 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.209-10 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
52.209-6 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING
WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(NOV 2021)
52.209-9 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
52.215-10 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA
(AUG 2011)
52.215-11 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA-
MODIFICATIONS (JUN 2020)
52.215-12 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (JUN 2020)
52.215-13 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA-MODIFICATIONS
(JUN 2020)
52.215-14 Alt I 52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021) ALTERNATE I (OCT 1997)
52.215-15 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
52.215-16 52.215-16 FACILITIES CAPITAL COST OF MONEY (JUNE 2003)
52.215-18 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JULY 2005)
52.215-19 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
52.215-2 52.215-2 AUDIT AND RECORDS-NEGOTIATION (JUN 2020)
52.215-23 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)
52.215-8 52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT (OCT 1997)
52.216-15 52.216-15 PREDETERMINED INDIRECT COST RATES (APR 1998)
52.216-8 52.216-8 FIXED FEE (JUN 2011)
52.219-16 52.219-16 LIQUIDATED DAMAGES-SUBCONTRACTING PLAN (SEP 2021)
52.219-28 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP
2021)
52.219-8 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
52.219-9 Alt II 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021) ALTERNATE II (NOV 2016)
52.222-21 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222-26 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
52.222-3 52.222-3 CONVICT LABOR (JUNE 2003)
52.222-37 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222-40 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
52.222-50 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.222-54 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (NOV 2021)
52.223-18 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
52.223-6 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.225-13 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.227-1 Alt I 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020) ALTERNATE I (APR 1984)
52.227-11 52.227-11 PATENT RIGHTS-OWNERSHIP BY THE CONTRACTOR (MAY 2014)
52.227-14 Alt IV 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) ALTERNATE IV (DEC 2007)
52.227-16 52.227-16 ADDITIONAL DATA REQUIREMENTS (JUNE 1987)
52.228-7 52.228-7 INSURANCE-LIABILITY TO THIRD PERSONS (MAR 1996)
52.229-12 52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
52.230-3 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES (JUN
2020)
52.230-6 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUNE 2010)
52.232-17 52.232-17 INTEREST (MAY 2014)
52.232-22 52.232-22 LIMITATION OF FUNDS (APR 1984)
52.232-23 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-25 Alt I 52.232-25 PROMPT PAYMENT (JAN 2017) ALTERNATE I (FEB 2002)
52.232-33 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
52.232-39 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.233-1 52.233-1 DISPUTES (MAY 2014)
52.233-3 Alt I 52.233-3 PROTEST AFTER AWARD (AUG 1996) ALTERNATE I (JUNE 1985)
52.233-4 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.242-1 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)
52.242-13 52.242-13 BANKRUPTCY (JULY 1995)
52.242-3 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (SEP 2021)
52.242-4 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)
52.242-5 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
52.243-2 Alt V 52.243-2 CHANGES-COST-REIMBURSEMENT (AUG 1987) ALTERNATE V (APR 1984)
52.243-6 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
52.244-5 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
52.244-6 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (JAN 2022)
52.245-1 52.245-1 GOVERNMENT PROPERTY (SEP 2021)
52.245-9 52.245-9 USE AND CHARGES (APR 2012)
52.246-24 52.246-24 LIMITATION OF LIABILITY--HIGH VALUE ITEMS (FEB 1997)
52.246-25 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)
52.249-14 52.249-14 EXCUSABLE DELAYS (APR 1984)
52.249-6 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)
52.253-1 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
52.204-23 (DEVIATION
2020-05)
PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES
(DEVIATION 2020-05)
(a) Definitions. As used in this clause—
"Covered article" means any hardware, software, or service that–
(1) Is developed or provided by a covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a covered entity.
"Covered entity" means–
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits Government use of any covered article. The Contractor is prohibited from—
(1) Providing any covered article that the Government will use on or after October 1, 2018; and
(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.
(c) Reporting requirement.
(1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing via email, to the Contracting Officer, Contracting Officer's Representative, and the Enterprise Security Operations Center (SOC) at NDAA_Incidents@hq.dhs.gov, with required information contained in the body of the email. In the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Enterprise SOC, Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) and Contracting Officer's Representative(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:
(i) Within 1 business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.
(End of clause)
52.204-25(DEVIATION
2020-05)(DEC 2020)
PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (DEVIATION 2020-05)(DEC 2020)
(a)Definitions. As used in this clause—
"Backhaul" means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
"Covered foreign country" means The People's Republic of China.
"Covered telecommunications equipment or services" means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
"Critical technology" means–
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
"Interconnection arrangements" means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
"Reasonable inquiry" means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
"Roaming" means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
"Substantial or essential component" means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b)Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115–232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in
FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115–232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunicationequipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c)Exceptions. This clause does not prohibit contractors from providing—
(1)A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d)Reporting requirement.
(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause in writing via email to the Contracting Officer, Contracting Officer's Representative, and the Network Operations Security Center (NOSC) at NDAA_Incidents@hq.dhs.gov, with required information in the body of the email. In the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the NOSC, Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) and Contracting Officer's Representative(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e)Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e)and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications.
As prescribed in 15.408(m), insert the following clause:
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Nov 2021)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable—
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial products or commercial services.
(A) If—
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial product or commercial service; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial product or commercial service, to a contract or subcontract for mailto:NDAA_Incidents@hq.dhs.gov the acquisition of other than a commercial product or commercial service.
(B) For a commercial product and commercial service exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include-
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
52.215-20 Alt IV REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER
THAN CERTIFIED COST OR PRICING DATA (NOV 2021) ALTERNATE IV (OCT 2010)
(a) Submission of certified cost or pricing data is not required.
(1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following paragraphs.The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial product and commercial service exception. For a commercial product and commercial service exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include-
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.
(b) Provide data described below: [Insert description of the data and the format that are required, including the access to records necessary to permit an adequate evaluation of the proposed price in accordance with 15.403-3 .]
(1) The offeror shall prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of Provision)
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications
(NOV 2021).
As prescribed in 15.408(m), insert the following clause:
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Nov 2021)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable—
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial products or commercial services.
(A) If—
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial product or commercial service; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial product or commercial service, to a contract or subcontract for the acquisition of other than a commercial product or commercial service.
(B) For a commercial product and commercial service exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include-
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
52.215-21 Alt I REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020) ALTERNATE I (OCT
2010)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable-
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial items.
(A) If-
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.
(B) For a commercial item exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification.
Such information may include-
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments prepared in the following format:
(2) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
52.215-21 Alt III REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020) ALTERNATE III (OCT
1997)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable-
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial items.
(A) If-
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .