Attachment 9 - Proposal Submission Checklist - July 2022 Version.doc
DOC document 98 KB Posted
- Attached to
- RFP 70RFPW23RW9000002, PSO Services for Nevada
- Solicitation number
- 70RFPW23RW9000002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 70RFPW23RW9000002 AM0002 rv2.pdf | ||
| Attachment 06 - Price Element Breakdown - NV AM0002 -final.xlsx | XLSX spreadsheet | |
| Exhibit 13_Update 5-24-2023.xlsx | XLSX spreadsheet | |
| 70RFPW23RW9000002 A0001.pdf | ||
| 11 Attachment 9 - Proposal Submission Checklist - January 2023 Version.pdf | ||
| 11 Attachment 9 - Proposal Submission Checklist - January 2023 Version.pdf | ||
| exhibit 13.xlsx | XLSX spreadsheet | |
| Pricing Schedule.xlsx | XLSX spreadsheet | |
| 5_Synopsis.docx | DOCX document | |
| Attachment 8 - Field Level Supervision Exhibit - APRIL 2023 REVISION.xls | XLS spreadsheet | |
| 6 Attachment 4 - Past Performance Questionnaire August 2020.pdf | ||
| Attachment 06 - Price Element Breakdown - 5-year ordering period - APRIL 2023 REVISION.xlsx | XLSX spreadsheet | |
| 5 Attachment 3 - Past Project Form August 2020.pdf | ||
| RFP 70RFP23RW9000002.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 9
PROPOSAL CHECKLIST FOR OFFERORS
70RFPW23RW9000002 NEVADA
The below checklist will serve to assist you in insuring that all required elements of your proposal are submitted. You are cautioned that the below is a summary of items necessary for submittal with your proposal, however it is imperative that you completely and thoroughly examine all elements of the Request for Proposal and all Amendments thereto, as these sections provide more detailed information regarding our evaluation and describes particular items you must address on forms and your narratives. Failure to comply and adequately respond to the full requirements of the solicitation may result in an Unacceptable rating. If there is a discrepancy between the information provided on this checklist and the body of the Request for Proposal and Amendments, the Request for Proposal and Amendments shall take precedence.
PROPOSAL SUBMISSION REQUIREMENTS SUMMARY
ELECTRONIC FILE ONE – TECHNICAL (NON-PRICE) PROPOSAL
RELEVANT PAST PERFORMANCE: Submission Guidelines
1. Contractors may submit up to a maximum of three (3) contract references for evaluation. Where a teaming arrangement is proposed, an additional maximum of up to three (3) projects for partner(s)/subcontractor(s) may be submitted. Thus, a maximum of no more than six (6) projects (3 for the prime and 3 for the subs or other partners) may be submitted in total. See RFP for Note to Joint Ventures.
2. Past Performance Questionnaires (Attachment 4) may be submitted for each reference contract. Contractors shall forward the Past Performance Questionnaire to a cognizant representative of the customer organization that purchased the services from your company.
3. If a teaming arrangement is proposed, a narrative and/or the actual Teaming Agreement if one exists shall be submitted as part of the proposal.
4. If submitting reference contracts performed by an affiliate, a narrative demonstrating that the affiliate will be meaningfully involved in the performance of the solicited contract shall be submitted as part of the proposal.
MANAGEMENT APPROACH: Minimum Submission Requirements
A. Quality Assurance
1. Field Level Supervision. Complete Attachment 8, “Field Level Supervision Exhibit”.
2. Quality Assurance.
a. Provide a narrative summary of your Quality Control Plan which will be provided as a post award deliverable. At a minimum, the summary shall detail what will be inspected, the methods of inspection to be used and the frequency of inspections.
b. Discuss your processes for addressing non-compliance issues (employee and other) which are identified through their Quality Control efforts.
B. Transition. Offerors shall outline significant transition steps and the associated timeframes for completing these steps to assure timely contract start-up and performance.
C. Staffing: Minimum Submission Requirements
1. Staffing Plan. The offeror shall describe their staffing Plan. Offerors, at their discretion, may include information to enhance the Government’s understanding of the proposal, such as the number of PSO full time equivalents (FTEs) to be assigned to this contract, staffing of TAS and ESS requirements, and the contractor’s ability to permanently staff additional posts with licensed/trained/certified and suitably cleared PSOs with little advance notice. Offerors shall provide a detailed plan indicating their approach to providing staffing for remote post locations. Some posts may be located in remote locations where local labor may not be obtainable for certain requirements and may consist of short periods of time. The Offeror shall address how it plans to staff and supervise such posts and meet last minute requirements. In the responses, offerors must convey an understanding of the geographic dispersion of remote posts in accomplishing TAS/ESS requirements and how requirements will be met while reducing the risk of open posts.
PROPOSAL SUBMISSION REQUIREMENTS SUMMARY
ELECTRONIC FILE TWO – ALL NON-TECHNICAL DOCUMENTS
PRICE PROPOSAL
1. SF 1449 - All pages of the SF1449 must be completed to include the Pricing Schedule, which details all CLINs, quantities, unit prices and extended prices.
2. Acknowledge Amendments (if any) in accordance with the instructions in Block 11 of the Amendment(s) SF30.
3. Detailed Breakdown of Proposed Unit Prices. Price Element Breakdown Worksheet (Attachment #6) provides expected form. Attachment #6 shall be provided in excel.
OTHER DOCUMENTS TO INCLUDE IN ELECTRONIC FILE TWO
Disclosure. Completed disclosure required under HSAR 3052.209-76, Prohibition on Federal Protective Service Guard Services Contracts with Business Concerns Owned, Controlled, or Operated by an Individual Convicted of a Felony (Dec 2009).
Representation and Certifications. Completed certification. See FAR 52.212-3. Offeror Representations and Certifications – Commercial Items (MAY 2022)
Telecommunications Representations. Completed certifications. See FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) (required only if applicable) and FAR 52.204-26 Covered Telecommunications Equipment or Services - Representation (OCT 2020)
Information Regarding Responsibility Matters. Completed certification. See FAR Clause 52.209-7 (October 2018)
July 2022 Version
File details come from the government source that posted it. Updated .