This federal contract opportunity notice seeks proposals for armed protective security officer services at various federal facilities in Maryland, Virginia, and Washington, D.C. under five separate lots. Services are required at 17 locations under Lot 1, 4 locations under Lot 2, 1 location under Lot 3, 7 locations under Lot 4, and 6 locations under Lot 5. The notice identifies the solicitation number as 70RFP218REC000002 and states that five 100% small business set-aside contracts will be awarded on an indefinite delivery/indefinite quantity basis for a one year base period and four one-year option periods. The NAICS code is listed as 561612 for security guard and patrol services. Interested parties should monitor the Federal Business Opportunities website on or around May 31, 2018 for release of the request for proposals.

Amendment 0007

View the file

Other files

File Type Posted
70RFP218REC000002_-_Amendment_0011.pdf PDF
Award_Notice.pdf PDF
Conformed_Contract.pdf PDF
Amendment_0009.pdf PDF
Pricing_schedule.xlsx XLSX spreadsheet
Amendment_0008.pdf PDF
Lot_1_Exhibit_10_.pdf PDF
Revised_SOW.pdf PDF
CBA-2018-11483_(DC0011).pdf PDF
Lot_3_EXHIBIT_10.pdf PDF
Lot_4_Exhibit_10.pdf PDF
Lot_2_Exhibit_10.pdf PDF
CBA-2014-6843_Rev._3_(MD0785_MD1248_MD0262_MD0774).pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
PreProposalConferenceSlides.ppt PPT presentation
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Lot_5_-_Seniority_List.xlsx XLSX spreadsheet
Lot_1_-_Seniority_List.xlsx XLSX spreadsheet
Lot_4_-_Seniority_List.xlsx XLSX spreadsheet
Lot_3_-_Seniority_List.xlsx XLSX spreadsheet
Lot_2_-_Seniority_List.xlsx XLSX spreadsheet
Lot_2_-_Price_Element_Breakdown.xlsx XLSX spreadsheet
Lot_5_-_Price_Element_Breakdown.xlsx XLSX spreadsheet
Lot_3_-_Price_Element_Breakdown.xlsx XLSX spreadsheet
Lot_4_-_Price_Element_Breakdown.xlsx XLSX spreadsheet
Pricing_schedule.xlsx XLSX spreadsheet
Lot_1_-_Price_Element_Breakdown.xlsx XLSX spreadsheet
Conformed_Solicitation.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

70RFP218REC000002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Philadelphia PA 19106 Attn: Melissa Hally

OPO/FPS/EACCG/R11/C

701 Market Street, Suite 3200 Ofc of Procurement Operations - FPS U.S. Dept. of Homeland Security NPPD/FPS/East CCG/Region 11/Group C

10/05/20180007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/26/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is the following:

A. Replace CBA 2017-10163, Rev. 1 for Lot 3 (DC0011) with revised CBA 2018-11483, Rev. 1 -

Collective Bargaining Agreement between First Coast Security Solutions, Inc. and

International Union, Security, Police and Fire Professionals of American (SPFPA).

B. Replace CBA 2014-6843, Rev. 2 for Lot 4 (covers MD1248, MD0262, MD0785, MD0774, MD0273) with revised CBA 2014-6843, Rev. 3 - Collective Bargaining Agreement between National

League of Justice and Security Professionals and Elite Protective Services.

C. Replace the Statement of Work in the RFP with the attached revised Statement of Work

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOHN DESIMONE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 14

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

70RFP218REC000002/0007

(attachment included with this Amendment).

D. Replace Exhibit 10 for Lots 1-4 with the revised Exhibit 10 for each Lot uploaded with this Amendment.

E. The Post Exhibits have been revised and will be sent to all vendors that submitted a

Non-Disclosure Agreement. Vendors can request

Post Exhibits for this solicitation by submitting a Non-Disclosure Agreement to

Solicitation70RFP218REC000002@hq.dhs.gov.

F. Revise the anticipated start of performance date for each of the Lots. Lots 1 and 2 have a revised anticipated start date of January 1, 2019. Lots 3, 4 and 5 have a revised anticipated start date of February 1, 2019. These dates replace the original estimated start of performance date of December 1, 2018.

G. Provide answers to the questions submitted.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFP 70RFP218REC000002

PSO Services for Five Lots with locations in Maryland, Virginia and Washington D.C.

Questions and Answers

1. Is there a specific requirement for assignment of vehicles to this opportunity? If so, please provide required quantity and suggested type (Sedan, SUV, 4X4, Pickup, etc)

Answer: See Statement of Work, Exhibit 10, Pages 159-213. There is no vehicle requirement for any of the lots.

2. Does the security force have dedicated office space in any of the buildings?

Answer: There is no guarantee that dedicated office space will be provided in any of the buildings.

3. Is non-firearms training allowed to be conducted on site at any of the buildings?

Answer: NWDTP classes can be conducted at Lot 1 (MD0766) and (MD1185), Lot 2 (MD0784), Lot 3 (DC0011), and Lot 5 (VA0301). This training must be coordinated through the COR and the stakeholders before scheduling any training. Lot #4 has 7 buildings with 3 screening posts;

however none of the buildings have the facilities to accommodate the NWDTP training.

Additional non-firearms training (ie. Basic and Refresher training) is not to be conducted on site.

4. Does the government have minimum experience or education requirements for supervisory personnel?

Answer: Yes. Supervisors are required to have the same qualifications as PSOs which can be found in the Statement of Work on page 68 of the RFP.

5. What are the minimum requirements to schedule the Government-Provided eight (8) hour block of Orientation Training, i.e. (minimum number of students, minimum notice period, approved training locations, etc.)?

Answer: Orientation Training will be addressed post award. Refer to pages 89-90 and pages 156- 157 of the RFP.See updated SOW 6.8.1.2 The Contractor shall schedule and coordinate Government-Provided training and testing with the COR and PSOPM. See updated SOW provided with Amendment 0007.

6. Is this the first time that this opportunity is being solicited as a Small Business set-aside?

Answer: No. The incumbent contracts were all solicited as Small Business set-asides.

7. Will incumbent PSOs who are not due for refresher training based on their previously completed training be required to be re-certified before assuming their posts under the new contract?

Answer: No, PSOs do not need to be re-certified before assuming their posts under the new contract.

8. With regards to the request for the Contractor to use an electronic time and attendance system that captures and records productive hours of a PSO while on post, please advise of the acceptable format for monthly reports to be prepared?

Answer: Refer to Section 9.3.2 of the Statement of Work.

9. Is the incumbent fully staffed at this time to fulfill all post requirements based on the seniority list provided?

Answer: This information is not necessary to submit a proposal in response to the RFP.

10. Is there a dedicated Site Supervisor to be assigned to this security program?

Answer: The vendor is responsible for supervision. The minimum supervision requirements for each LOT are identified on the applicable LOT post exhibit.

11. Are firearms stored on site or are officers issued take-home weapons?

Answer: All firearms are stored on site with exception of MD0195 under Lot 1 and MD1248 under Lot 4. There is no place to store the weapons at MD0195 and MD1248. PSOs are not issued take-home weapons.

12. LOT 1 - The Hours Per Day for the Roving Supervisor Positions (S1 & S2) do not correspond with the Start Time and End Time.

Answer: Supervisory hours can occur within the given timespan on the post exhibit. The number of hours indicated on the post exhibit for the supervisory posts is the minimum number of supervisor hours that the vendor must provide, as discussed in Section A. Field Level Supervision Command and Control of the Management Approach.

13. LOT 1 - Please confirm that the successful bidder is not required to possess a Top Secret and Top-Secret SCI clearance OR that the government is willing to sponsor the successful bidder.

Answer: There is no Secret or Top Secret security clearance requirement for Lot 1. This lot requires DHS Suitability. See 5.7.1 of the SOW.

14. LOT 1 -The Hours Per Day for the Roving Supervisor Positions (S1 & S2) at DC 0011 do not correspond with the Start Time and End Time. Please provide correct and updated Exhibit

Answer: See #12 above.

15. LOT 1 - There are several “Patrol and Response” posts without a determination of whether PSO Break is Required (MD 0766 & MD 1185). Please provide response accordingly.

Answer: They are considered “self-relieving” posts.

16. LOT 1 - Bldg MD1185 Post 4 indicates 24 hrs for SSH, but the note section says Holidays. Are Sat and Sun required as well?

Answer: The post is required to be manned on Saturday, Sunday and Holidays (SSH).

17. LOT 1 - The last column of the table for MD0195 indicating the effective date for the wages and benefits is cut-off (not visible). Will the Government please advise bidders what the effective date is to properly bid the base period wages and benefits?

Answer: The effective date is December 1, 2018. Refers to page 405 of the RFP.

18. LOT 1 - Are the S-1 and S-2 Supervisor Posts currently covered under CBA 2014-6776 Rev. 5; as there are “Sergeant” positions listed in the CBA that covers MD0766 & MD1185?

Answer: The supervisor posts are not SCA covered positions because the personnel at those posts will be performing management and/or supervisory job duties. Therefore, no minimum wages or fringe benefits for the supervisor posts will be incorporated into an award resulting from this RFP. Furthermore, since supervisors are not SCA covered, they will not be subject to contract price adjustments under FAR 52.222-43. Offerors should therefore price the costs for supervisor posts accordingly, including escalation for any anticipated increases in costs for wages and fringe benefits. Refer to Contingency Pricing on Page 19 of the RFP.

The sergeant rates will not be incorporated into the contract. The only minimum wages and fringe benefits to be incorporated into the contract are those applicable to the Guard II (ie. PSO) DoL labor category.

19. LOT 1 - The Post Exhibit lists (3) posts at this location and the applicable CBA covers both “Armed Guard” and “Sergeant” labor categories. Is one of these posts paid at the higher “Sergeant” labor rate?

Answer: Refer to the answer for question 18.

20. LOT 1 - Will the Government please confirm the number of total cell phones required for Lot 1?

Answer: Refer to Exhibit 10 on page 167 of the RFP.

21. LOT 1 - Post Exhibit - In column M – Please confirm whether the Blank positions require relief.

Answer: Supervisors, Rovers and Patrol and Response posts do not require breaks. Please refer to the revised Post Exhibits referenced in Amendment 0007.

22. LOT 1 - CBA 2014-6777 does not have current rates. Please provide the associated amendment or updated CBA agreement.

Answer: The rates in the Collective Bargaining Agreement provided in the RFP represent the current wage and fringe rates applicable.

23. Lot 1 CBA 2014-6777 has H & W and Pension rates as TBD (pages 490 & 491).

Answer: See #22 above.

24. LOT 2 - Please provide the correct addresses for the site locations?

The revised addresses for the sites at Lot 2 are 4300 River Road College Park, MD 20740 (MD0792); 4700 River College Park, MD 20737 (MD1872); 5830 University Research Ct, College Park MD 20740 (MD0784); 5001 Campus Drive, College Park MD 20740 (MD0334). Refer to page 55 of the RFP and the revised SOW provided with Amendment 0007.

25. LOT 2 - Is the “S” Supervisor Post at building MD0784 (NOAA/NCWCP) currently covered under CBA 2017-10357? (There is a “Sergeant” positions listed in the CBA that covers this building.)

Answer: Refer to “Contingency Pricing” on page 19 of the RFP. Also, see the answer to question 18.

26. LOT 2 - Will the Government please confirm that building Supervisors also need to be trained to NWDTP X-Ray or Non-X-ray standards (all the Lot 2 buildings have X-Ray machines)?

Answer: Confirmed. See SOW Section 6.7.4.1.1.

27. LOT 2 - This Patrol and Response post covers addresses that are about .4 miles apart. Please clarify: is this is foot patrol or a mobile patrol that may require a golf cart or similar method of transportation to patrol these 2 locations?

Answer: The Patrol and Response posts are interior or exterior only. They are site specific. The two buildings are next door to each other therefore the PSO will walk across the parking lot to travel from one building to the other. There is no vehicle required.

28. LOT 2 - Will the Government please confirm the number of total contractor-provided radios required for buildings under Lot 2?

Answer: Refer to Exhibit 10 on page 178 of the RFP. Twenty eight radios are required.

29. LOT 3 -Can the Government confirm that there is a known expectation in Ordering Period 1 and beyond to add as much as 26,000 additional hours?

Answer: The solicitation is clear on its face. Reference page 18 of the RFP, Maximum Quantities Clause.

30. LOT 3 - Are the armed PSOs and Supervisors at DC0011 also required to hold a D.C. Special Police Officer (SPO) Commission?

Answer: No.

31. LOT 3 - Please confirm the supervision required, Post Exhibit says 10 Hrs. M-F and 8 hours SSH.

However, the POC Information Tab indicates only 8 hours per day.

Answer: Supervision is required 10 hours per day Monday through Friday and 8 hours a day on Saturdays, Sundays and Holidays. The POC tab has been removed from revised post exhibits mentioned in Amendment 0007 which are being provided to vendors who submitted/submit Non-Disclosure Agreements.

32. LOT 3 - Please confirm the number of radios required, the POC Information Tab indicates 24 radios whereas Exhibit 10 Contractor Provided Equipment requires 25.

Answer: Refer to Statement of Work Exhibit 10, page 189. A total of 25 radios are required.

33. Will the Government please confirm that there are only (2) hourly CLINs associated with Lot 3 (PSO and Supervisory)?

Answer: Yes, there are only two hourly CLINs associated with Lot 3 (PSO and Supervisory).

34. For Lot #5 VA0382, what is the function of the supervisor being scheduled for only 3 hours per day on SSH?

Answer: The vendor should decide how utilize the supervisors to achieve the best performance within the times indicated.

35. For Lot #5, for VA 0822, what is the function of the supervisor being scheduled for only 1 hour per day on M-F?

Answer: The vendor should decide how utilize the supervisors to achieve the best performance within the times indicated.

36. Only Lot 5 requires the Contractor to provide weapons safes and clearing barrels. For the other 4 Lots there is no indication if these are required; in Lots 1-4 do PSOs carry their weapon to and from work?

Answer: Refer to Amendment 0007. The contractor must provide weapons safes and clearing barrels at all locations where weapons are stored. This includes all locations at all Lots with the exception of MD0195 under Lot 1 and MD1248 under Lot 4. The government will not provide safes or clearing barrels.

37. With regards to the Contract Manager position referenced in Item #11.2, Contract Manager of the SOW, does this refer to a Contract Manager for the overall program OR a Contract Manager for each lot? It would not be feasible to propose a Contract Manager for the entire program as there is no assurance that a single firm will be awarded all five lots. As an alternative, would the government suggest that we propose a dedicated Site Supervisor for each lot?

Answer: A Contract Manager is required for each Lot.

38. Please provide which posts require Holiday coverage for each Lot.

Answer: Any post identified on a post exhibit that has operating days listed as “SSH” or “7 Days” are required to be staffed on holidays.

39. With regards to the POC tab of each Post Exhibit, please clarify the significance of the referenced equipment and associated quantities.

Answer: Refer to Statement of Work Exhibit 10 for equipment requirements for each LOT. The POC tab for each post exhibit mentioned in Amendment 0007 has been deleted and revised Post Exhibits will be provided to vendors who submitted Non-Disclosure Agreements.

40. Is it the Government’s intent to award this contract to multiple companies, and then compete each task order between the winners?

Answer: No. This RFP will NOT result in a multiple award contract. Reference FAR 52.212-2 Evaluation on page 866 which states, “The Government intends to make award(s) by Lot. For each Lot, the Government intends to award a single award indefinite delivery indefinite quantity contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and non-price factors considered. The Government reserves the right to award multiple Lots under a contract for administrative convenience.

For example, the proposals submitted for Lot 1 will be evaluated in accordance with the terms of the RFP and the vendor whose proposal for Lot 1 that represents the best value to the Government will be the successful awardee to cover Lot 1. However, should this same vendor’s proposal submitted for Lot 2, be determined the best value to the Government for Lot 2; the Government may choose to award a single contract to this vendor to cover both Lots, where their offer was considered the best value to the Government.

41. What are the period of performance dates?

Answer: See Amendment 0007 for revised anticipated periods of performance for each LOT.

42. Are the incumbents trained to the standards set forth in this RFP?

Answer: No. NWDTP requirements were not part of the incumbent contracts.

43. What weapon is currently being used on this contract? Is this a platform change?

Answer: Refer to Exhibit 10 for each Lot beginning on page 115 of the RFP. PSOs on Lots 1,2,3 and 4 carry Smith & Wesson M&P .9mm. PSOs on Lot 5, 2070 Chain Bridge Road and 5275 Leesburg Pike carry the Smith and Wesson M&P .9mm as well. PSOs at the other sites under Lot 5 carry Glock 17 .9mm.

The platforms for the incumbent contracts are as follows:

Lot 1: 9mm Smith and Wesson M&P Lot 2: 9mm Smith and Wesson M&P Lot 3: Smith and Wesson 9mm M&P Lot 4: 9mm Smith and Wesson M&P Lot 5: VA0301, VA0316, VA0008 and VA0263 – 9mm Glock 17 VA0382, VA0822: 9mm Smith and Wesson M&P

Refer to SOW Section 14.4 Firearms, Ammunition and Intermediate Weapons.

44. Will the 3 incumbents be permitted to bid on the above captioned solicitation?

Answer: Yes, as long as they still meet the Small Business Size Standards for this RFP.

45. Can the Technical Proposal be submitted as either a Word or PDF document?

Answer: Yes.

46. Within Page Limitation, it states that Past Performance Questionnaires are excluded from page limits, which implies inclusion of PPQs. Should offeror-completed section of Past Performance Questionnaires be submitted in the Technical Proposal?

Answer: Past Performance Questionnaires are part of the Technical Submission however they are not subject to the page limitation. See page 868-870 of the RFP.

47. In order to offerors to include both a timeline and narrative for a 90-day transition, would the

Government change the page limitation from two to three?

Answer: No. There is a 2 page limit for Transition.

48. What is the anticipated Start Date for the Base Period in each of the Lots? This is important to pricing since many of the CBAs have effective dates that change at some point in 2019.

Answer: See Amendment 0007 for revised anticipated periods of performance for each LOT.

49. Most of the CBAs also require the provision of breaks and meal periods, but not necessarily in the same quantities or durations as SOW 12.1.2. Where a CBA speaks to break & meal period requirements – would the language in the CBA take precedence over the language in the

SOW?

Answer: See Amendment 0007. Refer to the Section 12.1.2 in the Statement of Work updated by this Amendment which replaces the Statement of Work originally included with the RFP.

50. If bidders are proposing on multiple Lots, does the Government prefer all technical and price proposal documents in (1) email, or a separate email submission for each “Lot” being proposed?

Answer: A separate E-mail for each Lot is preferable but not required. A separate Technical Proposal and separate pricing is required for each individual Lot. One Relevant Past Performance submission may be submitted for all lots.

51. For the Price Proposal, when responding to more than one Lot: will the Government please confirm if only (1) set of the below documents is required for the entire submission, or does the Government want a set of these documents for each Lot: Signed SF 1449, Acknowledged Amendments, Indirect Burden Rates, All Other Documents (Disclosure, Reps & Certs, etc.)

Answer: All documents, including those referenced, must be provided for each individual Lot, EXCEPT for the Relevant Past Performance submission. A separate price element spreadsheet is required for each individual lot. Only one set of Relevant Past Performance is required.

52. Would the Government please provide the historical TAS estimates for the locations on the

Lots?

Answer: Historical TAS estimates are not necessary to submit a proposal in response to the RFP.

Reference pages 21-22 of the RFP under the Temporary Additional Services paragraph which provides: The Government anticipates that approximately 2% of the maximum hours solicited under this requirement will be for temporary additional services.

53. When Supervisors are site-specific – are those supervisors to be priced/included und the

Supervisory CLIN – or under the CLIN for the specific Building they supervise?

Answer: All supervision is to be priced under the Supervisory CLIN.

54. Does the Contractor have to provide antennas or repeaters at the facilities where radios are required?

Answer: The vendor must ensure the radio system that they provide will function in the facility.

Refer to pages 167, 178, 189, 200 and 211 under Exhibit 10 of the RFP.

55. Do we submit one set of Past Performance overall, or do you want to receive a set with the technical for each lot?

Answer: Vendors may submit one set of Relevant Past Performance which will be evaluated for all lots. See the answer to question 51. One set of Relevant Past Performance is acceptable.

56. In reviewing the pricing forms, periods one to five are presented. We do not see a place to record pricing for transition. Please advise.

Answer: Transition costs are to be built into an offeror’s fully burdened hourly rate. There will be no separate billing for transition costs. Transition costs should be included under “Other Start-up/ Transition costs” on the Price Element Worksheets. Refer to page 872 of the solicitation as well as pages 838, 842, 846, 850 and 854 of Attachment 6.

57. Is the NWDTP Instructor Certification from FLETC a new FPS requirement for this work? When did the certification become a FPS requirement for guard services?

Answer: The NWDTP instructor certification from FLETC is a new government requirement for this RFP and is not currently included in any of the incumbent contracts.

58. Per the pre-proposal conference slides, both the award date and the start of full contract performance is December 1, 2018, which does not allow for up to the maximum 90 day transition period. Do you expect to submit a revised POP for full contract performance?

Answer: The anticipated start dates for each Lot are revised in Amendment 0007.

59. If the full contract performance changes after bid submittal will the government allow a base year price adjustment as many of the CBAs have different cycle dates other than 12/1/18, and will require blended base rates based on the number of months in each CBA cycle?

Answer: Only if a price adjustment is applicable pursuant to FAR 52.222-43. If the Period of Performance dates change and offeror’s pricing is impacted, the Government may request revised price proposals prior to award or allow for an REA to be submitted after award.

60. Are any M-F or M, T, Th, F, or W posts staffed on Holidays?

Answer: No. These posts are not staffed on Holidays.

61. Will the government provide storage space for weapons and ammunition on site?

Answer: Refer to the answer for question 2. All locations serviced by a PSO must have a location for a safe/ clearing barrel and all sites must have a clearing barrel that is contractor provided.

There is no guarantee that the Government will provide additional storage (ie. Weapons and ammunition) at all locations serviced by PSOs.

62. If the successor contractor uses the same weapons platform as the incumbent, will weapons qualifications under the incumbent be deemed adequate for the successor (until the next scheduled qualification) or will all PSO’s require recertification during transition?

Answer: Weapons must be assigned to PSOs by serial number. PSOs must qualify with the weapon they are issued. The current qualification achieved under the incumbent contract will only remain valid if the successor obtains the weapons and the provided weapon assigned to each PSO by serial number does not change. Refer to Sections 6.6.3.1 and 14.4.9.

63. Are the incumbent PSOs and supervisors trained to the NWDTP standards in this RFP, and therefore do not require any additional NWDTP training?

Answer: See answer to question 42.

64. Do the current NWDTP trainers require government certification at FLETC?

Answer: The NWDTP instructor certification from FLETC is a new requirement for this RFP and is not currently included in any of the incumbent contracts. The NWDTPI Certification is issued by

FLETC. If the Contractor’s instructor does not possess a FLETC Certification, they cannot train on

NWDTP.

65. Do the incumbent guard force currently possess PIV cards?

Answer: Yes.

66. Are the incumbent PSOs currently required to meet the same medical and physical requirements as established by this RFP?

Answer: No, the incumbent PSOs currently meet all of the medical and physical requirements established in the specific incumbent contracts. Refer to SOW Section 5.2.2 Pre-Employment Examinations.

67. What is the anticipated percentage of TAS hours by Lot?

Answer: Reference pages 21-22 of the RFP under the Temporary Additional Services paragraph which provides: The Government anticipates that approximately 2% of the maximum hours solicited under this requirement will be for the temporary additional services.

68. Does the Government intend to purchase all the hours on the Pricing Schedule or the hours listed on the post exhibit?

Answer: The solicitation is clear on its face. Reference RFP page 19 MAXIMUM QUANTITIES.

69. Will the Government allow an equitable adjustment if all costs are not recovered due to this significant difference in bid hours vs. purchased hours?

Answer: No. See also the answer to question 68.

70. Will the Government consider a separate CLIN for overhead costs so that regardless of the number of hours purchased, an offeror would be made whole for its overhead expenses?

Answer: No. The solicitation is clear on its face. Reference RFP page 872 paragraph #4 which states, “The Contractor’s price shall be inclusive of all the Contractor’s direct costs, indirect costs and profit and shall include all costs associated with providing the services described in the Statement of Work, the Post Exhibits and the Contractor’s technical proposal.”

71. Please confirm that the following statement applies to all buildings across all Lots “The

Contractor shall designate an area off Government property for the PSOs to clear and clean their duty weapon. At no time while on duty shall a PSO remove his/her weapon from the holster for clearing or cleaning while in or directly around a Federal facility unless approved by the COR.”

Answer: The COR will designate an area for clearing and cleaning for all Lots.

72. Per the SOW, “PSOs working a minimum 8-hour shift shall be provided a 15-minute break for each 4 hours of work. This break should normally be scheduled in the middle of each 4-hour period. A 30-minute lunch break shall also be provided to those individuals. All PSOs working a 6-hour shift shall be provided a 15-minute break and a 30-minute lunch break. PSOs working a minimum of 4 hours shall be provided a 15-minute break.” Please confirm if the 30-minute lunch break is paid. Additionally, should breaks be outlined in the CBA, does the CBA or SOW supersede?

Answer: Refer to Section 12.1.2 “Breaks” in the revised Statement of Work included in Amendment 0007.

73. If a firm is interested in submitting a bid for more than one Lot, and that firm's approach/transition plan is different for each Lot, can a firm submit a separate 5 page management plan for each Lot?

Answer: Yes, a separate Management Approach is required for each Lot. Relevant Past Performance is the ONLY submission that is required once and will be applicable for all Lots. See the answer to question 51.

74. The Post Exhibits for several supervisory posts give a Start and End time of 0:00, which usually indicates a post that requires 24-hour coverage. Would the Government please clarify if the number of hours to be worked at this post M-F is 24.00/day or 9.00/day?

Answer: See Amendment 0006. The Post Exhibits have been revised to include language with further explanation and will be sent to all vendors who submitted Non-Disclosure Agreements.

The number of hours required is indicated on the post exhibits. The vendor has discretion over the specific times that the supervisor is present within the 24-hour time frame.

75. At VA0301, the Post Exhibit for this building shows 2 supervisory positions, one for 8.00/day and one for 24.00/day. Would the Government please clarify what hours of the day M-F require the presence of 2 supervisors?

Answer: S-1 is a supervisory position with flexible hours but should be on duty during the day shift and S-2 is the supervisory position who is 24 hours.

76. What is the currently hourly rate the government is paying on these contracts?

Answer: This is not releasable information pursuant to the Freedom of Information Act (FOIA).

77. How much did the government spend annually on these contracts?

Answer: This is releasable information pursuant to the Freedom of Information Act (FOIA), however, a formal FOIA request will need to be submitted to the appropriate FOIA office in order to release this information.

78. Which firm or firms currently provide these services to the government?

Answer: PSO services for Lots 1, 2, and 4 are currently provided by Elite Protective Services.

Services at Lot 3 are provided by First Coast Security Solutions and services at Lot 5 are provided by Applied Integrated Technologies with the following exceptions: Lot 2 – MD0784 and Lot 4 – MD1863 and MD1848 are under task orders with American Security Programs.

79. Will the government consider value-added benefits such as complimentary equipment, technology/software, personnel, etc. to increase the overall ranking of a proposal?

Answer: The Government will evaluate proposals in accordance with the solicitation evaluation criteria outlined in the RFP. See solicitation pages 866-874.

70RFP218REC000002 Amendment 0007
RFP 70RFP218REC000002 QA Final

File details come from the government source that posted it. Updated .