RFI Questions and Answers.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
HVAC Replacement for Buildings 217, 641 and 1, Federal Law Enforcement Training Center
Solicitation number
70LGLY21RSSB00009
Issued by

About this file

This document contains questions and answers regarding a solicitation for HVAC replacement services at three buildings at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work involves replacing HVAC equipment and associated components such as ductwork, electrical systems, and controls at Buildings 217, 641, and 1. Questions addressed piping and insulation specifications, staging and disposal logistics, certification requirements, and clarified that engineered design drawings are recommended but not required. Responses provided guidance on the use of existing infrastructure where possible, equipment manufacturer requirements, and submission of past performance information. The contracting officer must receive any requests for information by July 7, 2021.

View the file

Other files

File Type Posted
70LGLY21RSSB000090001 Amendment 1.pdf PDF
Att 23 Financial Questionnaire.pdf PDF
Site Visit Sign-in page 2.jpg JPG image
Site Visit Sign-in page 1.jpg JPG image
HVAC Requirement Specifications.pdf PDF
Scope of Work - Section 01 11 00 (amendment 1).pdf PDF
Att 16 Security Handout.pdf PDF
Att 17 Security Training List.pdf PDF
Att 11 Non-Disclosure Agreement.pdf PDF
70LGLY21RSSB00009.pdf PDF
Att 07 FMD_70.pdf PDF
Att 20 SF1444.pdf PDF
Att 18 GA Construction Requirements Statue Wage Determination Bldg. (GA20210160).pdf PDF
Att 08 WH-347 Instruction.pdf PDF
Att 13 I-9.pdf PDF
Att 01 Statement of Work.pdf PDF
Att 15 SF85.pdf PDF
Att 03 SF25A.pdf PDF
Att 19 SF1413.pdf PDF
Att 04 SF28.pdf PDF
Att 21 SF24.pdf PDF
Att 14 OF306.pdf PDF
Att 02 SF25-14.pdf PDF
Att 10 FMD_42.pdf PDF
Att 22 SF LLC.pdf PDF
Att 24 DHS-Form-700-3.pdf PDF
Att 06 Format FIN INST ILC CONFIRM.pdf PDF
Att 12 FLETC Form 121-00-02 (5 days or less).pdf PDF
Att 23 Financial Questionnaire.pdf PDF
Att 05 Format ILC.pdf PDF
Att 25 WH1321 DOL POSTER.pdf PDF
Att 09 WH 347.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Tracker

Sol. No 70LGLY21RSSB00009 - FLETC Bldgs. 217, 641, and 1 HVAC Replacement
RFIDocumentSection/ ParagraphPage #Question
Do NOT include any company identifying information.Response DateGov Response ReferenceQuestion

Do NOT include any company identifying information.

1Will any engineer design be required for this project?No.
2Will as-builts be required at the end of the project?
If so will the Government provide CAD files of the buildings?No.
3Will test & balancing of the new systems be required?
If so will the Government supply a test & balance report for each building that they may have on the existing systems?Yes, but test & balance reports on existing systems are not available.
4Will any temporary heating or cooling system be required?No.
5Will we be required to work all buildings at the same time or one building at a time?Any order is acceptable as long as once a building is started, work continues every work day until that building is completed.
6Will the Government move any furniture/computers from site prior to start of project or will that be the responsibility of the Contractor?Contractor will move furniture. Government will move computers.
7Will work be completed during normal business hours or non-standard hours.Normal business hours.
8Bldg. 217 Staging for equipment and crane. Will we be able to utilize the access road for driving range to stage crane and tractor trailer for placement/removal of old chiller units and installation of new equipment?Yes.
9SF33L.3.2(c)(3)(d)76 of 81For Tab D, Factor 1: Past Performance asks for relevant contracts performed. May offeror's submit team member experience? If so, will team member experience be weighted equally to offeror experience in evaluation of past performance?Relevenat Contract information must be provided unless the vendor has no past performance, relevant can be works performed outside the federal government. Team member experience can be factored into the offeror experience.
10SF33, Section JAttachment 2159 of 81, Attach. 21Section J references Attachment 21 - SF24 Bid Bond. Please confirm an SF24 Bid Bond is NOT required to be completed and submitted with offeror proposals.Bid Bonds are NOT REQUIRED
11Is it acceptable to utilize a pre-cast concrete equipment pad in lieu of pouring? If so, can it be installed over the existing concrete pad?No.
12Statement of WorkWhen replacing equipment noted in the Scope of Work, is it a requirement to utilize the same manufacturer?No.
13Per the site walk we are to replace the copper line sets. Is this copper to be recycled by the contractor or turned in to base recycling?Recycled by the contractor.
14Is the existing equipment to be disposed of by the contractor or turned in to base recycling?Disposed of by the contractor.
15Is the base or contractor responsible for reclaiming the refrigerant from the existing equipment?The contractor is responsible.
16Is it acceptable to utilize the existing condensate drain lines if they are in good working condition?Yes.
17Solicitation 70LGLY21RSSB00009Submission Requirements77“The offeror shall have staff with the following license and certifications; GA Conditioned Air Contractor License, Class II Unrestricted, and EPA Section 608 Technician Certification – Universal (Type I, II, and III). Are these certifications required for staff such as Project Manager, Superintendent/SSHO, and Quality Control Manager? Or is it acceptable to have these covered by a subcontractor?Yes, it is acceptable to have these covered by a subcontractor.
18Statement of Work1.6.13BG0641 calls for replacement of equipment with three (3) 4-ton packaged heat pumps. What is the design intent for the outside air as the current unit is being demoed? Is there an option to install a Variable Refrigerant Flow System in lieu of the packaged units?All (3) 4-ton packaged heat pumps are scheduled for 300cfm of outdoor air controlled by CO2 monitors. No, a Variable Refrigerant Flow System is not an option.
19Statement of Work3.3.9
3.3.137BG0641 3.3.9 specifies connecting new duct to existing duct for various systems. 3.3.13 specifies demolishing all existing equipment, ductwork, pads, electrical, etc. Do we replace all duct, or can we connect to existing duct as explained in 3.3.9?Existing duct reused may remain. Demolish ducts that are not reused (i.e. abandoned).
20Statement of WorkBG0641 - During the walk through it was asked whether we needed engineered duct drawings, it is our recommendation to provide engineered design drawings for specified duct layout.Although not required, engineered design drawings may be provided.
21Statement of WorkBG0217 - can the crane be setup on the back side of the building utilizing the road on the other side of the fence?Yes.
22Who is the fire alarm contractor for the base?FLETC has an inhouse fire alarm technician.
23What is the specification for exterior duct and piping insulation?Refer to specification section 23 07 00.
24What is the specification for interior duct and piping insulation?Refer to specification section 23 07 00.
25Statement of Work3.1.963.1.9 specifies start up and test balance of new units per manufacture instructions. Is the test and balance required to be certified?No, unless required by the manufacturer.
26Financial QuestionnaireAttachment 23Is an electonic version of Attachment 23 allowed to be submitted, or does the perspective vendor have to mail the form in physically.An electornic version can be emailed directly to the contracting officer when submitting proposal.

&F &A

&P &D

File details come from the government source that posted it. Updated .