Revised_Question_and_Answers_combined.docx

DOCX document 17 KB Posted

Attached to
Debris and damaged mobile home removal to allow for installing units to house displaced survivors
Solicitation number
70FBR419Q00000033
Issued by

About this file

Revised Questions/Answers

View the file

Other files

File Type Posted
70FBR419Q00000033_Amendment_3.pdf PDF
Final_Question_and_Answers_combined.pdf PDF
B5_Revised_COMBINED_SYNOPSIS-SOLICITATION.pdf PDF
70FBR419Q00000033_Amendment_2.pdf PDF
Question_and_Answers_combined.docx DOCX document
70FBR419Q00000033_Amendment_1.pdf PDF
70FBR419Q00000033.pdf PDF
70FBR419Q00000033.pdf PDF
A15_WD_Jackson_county.pdf PDF
A15_WD_Calhoun_county.pdf PDF
A15_WD_Gulf_county.pdf PDF
A15_WD_Bay_county.pdf PDF
SOW_Debris_Removal.pdf PDF
B5_COMBINED_SYNOPSIS-SOLICITATION_BPA.pdf PDF
A15_WD_Gadsden_county.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mobile Home, Debris Removal and Site Restoration Solicitation No. 70FBR419Q00000033

1. The solicitation states that 10 each should be used for the sampling evaluation size but the quantity on the Form 1449 is 18. Please clarify if there are 18 sites throughout the 5 counties or 18 mobile homes in the Bay County site.

A. 18 is correct quantity, however the quantity is for each Mobile Home to be remove within the listed site in CLIN 0001, not counties.

CLIN 0001 quantity is for 18 each Mobile homes to be priced for removal within the specified site.

CLIN 0002 quantity is for 18 each Lots to be cleared of debris, trees, etc, within the specified site.

2. How many sites are planned for each county?

A. As this is request for a BPA which does not obligate any funds by the Government, our requirement is currently unknown. We currently have one requirement at the address listed within CLIN 0001.

3. Can the govt. provide addresses for the sites for hauling purposes?

A. The only site currently available is located at CLIN 0001.

4. Is a bid bond required?

A. No.

5. Solicitation states delivery is required 1 day after award. We request the govt give 10 days for delivery to allow for obtaining P&P bond, utility locates, etc.

A. No, Will allow up to 3 days for the vendor to request permits once a call order is issued. Please note this requirement is supporting displaced survivors and clearing Mobile homes lots to house displace survivors in support of Hurricane Michael.

6. What it the period of performance for each site?

A. Will be determined on each call order, but shall not exceed 15-20 days.

7. Is site stabilization such has seeding, sodding or mulching required as part of the site restoration?

A. No, only raking of the lot to ensure it is clean of trash/debris

8.What is the payment terms on this contract?
A.Will be specified on each call order as Net 15 unless contractor request Net 30. All call orders Period of Performance shall not exceed 15-20 days maximum.

9. How many days is the government allowing for this contract?

A. All call orders from date of award shall not exceed 15-20 days maximum.

10. Is there a debris site to dump close by that is already set up through the government for this or will the contractor have to work this out?

A. This is the contractor’s responsibility

11.Is the contractor expected to be on site as soon as the award is made, or will there be a variance in there for a start date?
A.We are awarding a Blanket Purchase Agreement, upon issuance of Call Order, the contractor is required to begin work immediately to ensure they meet the Period of Performance requirements.

Furthermore, contractors are required to survey the Mobile Home Park to understand work and equipment necessary to complete requirement.

12. Any photos of the above available for reference A. No, as this was issued under 52.226-3 local area set-aside for WOSB

13. Is any environmental testing or reporting required?

A. See 14 below

14. Will we be responsible for asbestos testing and removal, if necessary? Or has DEP waived the requirement?

A.All debris must be disposed of in accordance with Florida State/county Waste regulations. Debris should be taken to an FDEP permitted landfill or by some other method authorized by FDEP.
•Class I wastes, including all mixed waste, non-recyclables and residuals generated from debris segregation (excluding asbestos containing material) must go to a Class I landfill or to a waste-to-energy landfill;
•Uncontaminated vegetative debris may be disposed of in permitted lined or unlined landfills, permitted land clearing debris facilities, registered yard trash processing facilities, or permitted construction and demolition debris disposal;
•Demolition debris may be taken to a permitted demolition debris disposal or recycling facility;
•Hazardous waste must be removed by authorized hazardous waste transporters and taken to a permitted hazardous waste facility.
oWhite goods:
•Must be separated from vegetative debris and solid waste.
•Unsalvageable be taken to a Class I landfill or recycling facility.
•CFCs should be removed by a certified technician.
oWhole tires:
•Must be separated from vegetative debris and solid waste.
•The State of Florida bans the disposal of whole tires in landfills.
oAsbestos and lead-based paint:
•If any asbestos containing material, lead-based paint, or other hazardous materials are found during activities, the contractor must comply with all federal, state, local abatement and disposal requirements. Coordination with the FDEP Division of Air Resource Management or the local pollution control agency PRIOR to any demolition of units that contain asbestos or asbestos-containing materials is required.
•All asbestos containing materials must be deposited at a waste disposal site licensed and permitted to handle this material.
15.Should a line item be added to the price sheet for asbestos testing?
A.A cost reimbursable CLIN for miscellaneous requirements: CLIN 0003 Miscellaneous (for example: If Asbestos is found, please stop work immediately and notify Contracting officer immediately before contacting license contractor.
16.Should a line item be added to the price sheet for asbestos removal?
A.Cover under CLIN 0003 above
17.Will debris be pushed to nearest ROW or will it be required to be hauled to nearest reduction site or will it be required to be hauled to the certified landfill?
A.Remove from site

18. Who is responsible for disposal cost?

A: Contractor

19.Please clarify the meaning/give explanation for Item 0001 NOTE regarding sampling evaluation. The line item price is for 18 sites, but it also indicates to use 10 each as a sampling evaluation.
A.18 each is the correct sampling, was corrected in the last amendment