Please use the following format, as appropriate, to provide the number of hours and fixed loaded labor rates to the labor categories proposed by the Offeror for the base year and for each of the four option years (see examples provided below).

Table 2-1: Labor Categories and Number of Hours per Category

Labor Category Hours Labor Category 2018 2019 2020 2021 2022 2023 Project Manager Project Scheduler Quality Assurance Manager Administrative Assistant Technician Technician 2 Technician 3 Inspector Inspector 2 Inspector 3 Engineer Engineer 2 Engineer 3

Table 2-2: Labor Categories and Fixed Fully Loaded Rates for each Category

Fixed Fully Loaded Labor Category Rates Labor Category 2018 2019 2020 2021 2022 2023 Project Manager Project Scheduler Quality Assurance Manager Administrative Assistant Technician Technician 2 Technician 3 Inspector Inspector 2 Inspector 3 Engineer Engineer 2 Engineer 3

Labor rates shall be the average rate of the base year and four option years for each position, based on the submitted pricing for labor rates. Labor Categories and

Number of Hours per Category shall be taken from the description of work performed for tasks 1 – 19, submitted as part of your proposal.

Requirement:

Based on your proposed technical approaches please use the following format, as appropriate, to provide the labor category, rate, hours, and mix for each approach. The Labor Categories and Number of Hours per Category must match those presented in Table 2-1: Labor Categories and Number of Hours per Category and Table 2-2: Labor Categories and Fixed Fully Loaded Rates for each Category for the Offeror’s proposal. You may modify the table so that it contains as many labor categories as needed for your solution.

Table 2-3: Labor Category, Rate, Hours, and Mix for Technical Approaches

Pricing Scenario Labor Category Labor Rate Hours Required Total Cost Project Manager $ - Project Scheduler $ - Quality Assurance Manager $ - Administrative Assistant $ - Technician $ - Technician 2 $ - Technician 3 $ - Inspector $ - Inspector 2 $ - Inspector 3 $ - Engineer $ - Engineer 2 $ - Engineer 3 $ -