70FA19R0000000006-_Attachment_C_-_PPQ.docx

DOCX document 14 KB Posted

Attached to
Chemical, Biological, Radiological, and Nuclear (CBRN) Program Federal contract opportunity
Solicitation number
70FA5019R00000006
Issued by
Federal Emergency Management Agency National Community Section

About this file

Attachment C - PPQ (Word Version)

View the file

Other files for this federal contract opportunity

Other files attached to Chemical, Biological, Radiological, and Nuclear (CBRN) Program, newest first.
File Type Posted
70FA5019R00000006_-_Amendment_0003.pdf PDF
70FA5019R0000000006-_Attachment_A_-_SOW_-_Amendment_3.docx DOCX document
70FA5019R00000006__-_(Amendment_3).docx DOCX document
Questions_and_Answers_-_Amendment_3.xlsx XLSX spreadsheet
70FA5019R00000006_-_Amendment_0001.pdf PDF
70FA5019R00000006_-_Amendment_0002.pdf PDF
70FA5019R00000006_-_Amendment_0002.pdf PDF
Questions_and_Answers_-_Amendment_2.xlsx XLSX spreadsheet
70FA5019R00000006_-_Amendment_0001.pdf PDF
70FA5019R0000000006-_Attachment_E_-_LCAT_Qualifications_(Amendment_1).docx DOCX document
70FA5019R0000000006-_Attachment_A_-_SOW_-_Amendment_1.docx DOCX document
70FA5019R00000006__-_(Amendment_1).docx DOCX document
70FA5019R0000000006-_Attachment_D_-_Price_Evaluation_Worksheet_(Amendment_1).xlsx XLSX spreadsheet
Questions_and_Answers.xlsx XLSX spreadsheet
70FA19R0000000006-_Attachment_E_-_LCAT_Qualifications_docx.pdf PDF
70FA19R0000000006-_Attachment_C_-_PPQ_-_Final.pdf PDF
70FA19R0000000006_-_Final.pdf PDF
70FA19R0000000006-_Attachment_B_-_QASP_-_Final.pdf PDF
70FA19R0000000006-_Attachment_A_-_SOW_-_Final.pdf PDF
70FA19R0000000006-_Attachment_D_-_Price_Evaluation_Worksheet.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

Past Performance Questionnaire

Contractor name:_______________________Role in this contract: ______________
Email Address: __________________________Phone Number: __________________
Contract Period of Performance: ____________Date of Survey: __________________
Person Completing the Survey: _____________Phone Number: __________________

Please assess each of the seven (7) following areas with a rating that is based on the provided objective measurable performance indicators to the maximum extent possible, Commentary to support the rating for the element assessed where indicated at the end of each section. Assign each a rating among the choices of Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory. Use the below rating guidelines as guidance in making these evaluations. Insert the appropriate rating.

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefits. The contractual performance of the area being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. There are multiple significant events identified relating to the area being assessed with detail as to how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there have been no significant weaknesses identified.

Very Good – Performance under the area being assessed meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the area being assessed was accomplished with some minor problem for which corrective actions taken by the contractor was effective.

There is a significant event identified relating to the area being assessed with detail as to how it was a benefit to the Government. There have been no significant weaknesses identified.

Satisfactory – Performance under the element being assessed meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. For the element being assessed, there have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There have been NO significant weaknesses related to the element being assessed. The contractor has not been assessed a rating lower than Satisfactory solely for not performing beyond the requirement of the contract/order.

Marginal – Performance under the element being assessed does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. For the element being assessed, a significant event has been identified in each category that the contractor had trouble overcoming and details provided as to how it impacted the Government. A reference to the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter) should also be provided.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. For the element being assess as multiple significant events have been identified in each category that the contractor had trouble overcoming and details provided as to how it impacted the Government. A singular problem, however could be of such serous magnitude that it alone constitutes an unsatisfactory rating. A reference to the management tools used to notify the contractor of the contractual deficiencies (e, g. management, quality, safety, or environmental deficiency reports, or letters) should also be provided.

Contract Effort Description

Quality of Product or Service

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Quality of Product or Service (2000 characters maximum):

Schedule

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Schedule (2000 characters maximum):

Cost Control (Rating and Comments for Cost Control are not required if contract type is Fixed-Price)

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Cost Control (2000 characters maximum):

Business Relations

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Business Relations (2000 characters maximum):

Management

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Management of Key Personnel (2000 characters maximum):

Small Business (Rating and Comments for Small Business are not required if contract did not utilize a small business subcontracting plan)

_ Unsatisfactory _ Marginal _ Satisfactory _ Very Good _ Exceptional

Government Comments for Small Business (2000 characters maximum):

Customer Satisfaction

Would you recommend the selection of this firm again?

_ definitely would not _ probably would not _ might or might not _ probably would _ definitely would

File details come from the government source that posted it.