This is a Cost Schedule document for RFP# 70CNR-S3893 issued by the State of Nevada Purchasing Division on behalf of the Nevada Department of Conservation and Natural Resources, Division of Environmental Protection, Bureau of Mining Regulation and Reclamation. The document solicits proposals for Certified Environmental Manager services to support interim fluid management operations at a mine site. The cost schedule establishes the framework for vendor pricing and does not specify quantities, response dates, due dates, site visits, bidder meetings, award dates, or contract term information within this document.
The cost schedule requires vendors to submit direct labor rates (excluding overhead, general and administrative expenses, and profit) for ten personnel categories including Program Director/Principal, Associate or Project Manager, Senior Engineer, Senior Hydrogeologist, Project Geologist, Project Engineering, Project Draftsperson, Field Technician, Administrative/Billing, and two additional positions at vendors' discretion. Vendors must also propose billing rates with direct labor overhead multiplier built in for the same positions, with all rates remaining fixed for the contract's duration. The document permits indirect cost reimbursement for travel per current fiscal year State and GSA guidelines, allows main contractors only to request 5% management mark-up on both partnering sub-contractor and outside service sub-contractor invoices, and enables cost recovery for equipment on a daily or unit basis. Vendors may request additional indirect costs with detailed breakdowns and supporting cost sheets as attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Terms-and-conditions-for-services~14.pdf | ||
| 70CNR-S3893 Insurance Schedule.docx | DOCX document | |
| Quote Instructions.pdf | ||
| 70CNR-S3893 NDEP Additional Terms and Conditions.docx | DOCX document | |
| 70CNR-S3893-Reference-Questionnaire~2.docx | DOCX document | |
| 70CNR-S3893 Scope of Work~1.docx | DOCX document | |
| 70CNR-S3893 Standard-form-contract.docx | DOCX document | |
| 70CNR-S3893-Request-for-Proposals~2.docx | DOCX document | |
| 70CNR-S3893 Contract Acronyms and Definitions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Schedule Mine Site Interim Fluid Management
RFP# 70CNR-S3893 DEP #
Vendor Name__________________________________________________________________
A. Personnel Direct Costs – Per hour direct staffing cost excluding overhead, general and administrative expenses, or profit. Rates to remain in effect for the life of the contract for positions noted below:
1. Program Director/Principal
2. Associate or Project Manager
3. Senior Engineer
4. Senior Hydrogeologist
5. Project Geologist
6. Project Engineering
7. Project Draftsperson
8. Field Technician
9. Administrative/Billing
10. (Other Job Title)
11. (Other Job Title)
Cost Schedule Cont.
RFP# 70CNR-S3893 DEP #
B. Proposed Billing Rates – with direct labor overhead multiplier built in. Rates to remain in effect for the life of the contract for positions noted below:
1. Program Director/Principal
2. Associate or Project Manager
3. Senior Engineer
4. Senior Hydrogeologist
5. Project Geologist
6. Project Engineering
7. Project Draftsperson
8. Field Technician
9. Administrative/Billing
10. (Other Job Title)
11. (Other Job Title)
C. Indirect Costs – To include but not be limited to the following:
| 1. Travel: Reimbursement for contractor and sub-contractor travel, including vehicle use /mileage, reimbursed only per current FY State and GSA guidelines. |
| Accept: |
Yes No
| 2. Main Contractor Only: Management mark-up of 5% requested on partnering sub-contractor invoices. Sub-contractors may not select mark-up. |
| Main Contractor Accepts: |
| 3. Main Contractor Only: Management mark-up of 5% requested on outside service sub-contractor invoices. Sub-contractors may not select mark-up. |
| Main Contractor Accepts: |
| 4. Equipment: Provide a list of in-house or rented equipment cost per day or unit, excluding all vehicle usage. |
| Cost sheet included: |
5. Other Indirect Cost Request: Provide specific details as attachment including a cost breakdown per day or unit.
Cost sheet included
DEP # Interim Fluid Management pg. 2 of 2
File details come from the government source that posted it. Updated .