RFP IDIQ Questions_GovernmentResponses.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Request for Proposal: CBP IDIQ - Aircraft Support Services Federal contract opportunity
Solicitation number
70B02C24R00000060
Issued by
Department of Homeland Security Customs and Border Protection

About this file

This document is a Request for Proposal (RFP) issued by the U.S. Department of Homeland Security Customs and Border Protection (CBP) for aircraft support services, including major and minor aircraft alterations, heavy aircraft maintenance, engineering services, and purchasing. CBP is seeking to award a single IDIQ contract for these services. The RFP provides details on the required services, proposal instructions and evaluation criteria, pricing templates, and a timeline for questions and proposal submissions. Key details include:

  • This is a full and open competition with a total small business set-aside. Offerors must demonstrate prior experience across five categories: major alterations to fixed and rotary wing platforms, minor alterations, heavy maintenance, and engineering services.
  • Proposal instructions outline requirements for technical, management, and pricing volumes. Pricing must be provided at the labor category level for each ordering period.
  • The government anticipates awarding the IDIQ contract in the second quarter, with an initial 12-month base period and four 12-month option periods.

View the file

Other files for this federal contract opportunity

Other files attached to Request for Proposal: CBP IDIQ - Aircraft Support Services, newest first.
File Type Posted
RFP 70B02C24R00000060A00001.pdf PDF
Attachment 3_Pricing Template_112124.xlsx XLSX spreadsheet
70B02C24R00000060A0001.pdf PDF
Attachment1_ Statement of Work_11242024.pdf PDF
Attachment 2_SOW Appendix_11212024.pdf PDF
RFP 70B02C24R00000060.pdf PDF
Attachment 2_SOW Appendix.pdf PDF
Attachment 3_Pricing Template.xlsx XLSX spreadsheet
Attachment 4_Question Template.xlsx XLSX spreadsheet
Attachment1_ Statement of Work_10242024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

DocumentReference SectionQuestion/CommentGovernment Response
Att 3 Pricing TemplateLC Definitions tabThe labor categories of Management Occupations, and Business Operations Specialist shown on the Pricing tab do not have definitions listed.The following definitions were added to the Pricing Template.

Please note the majority of labor category definitions are defined from the Bureau of Labor Statistics (BLS) to establish the labor categories that the government believes will be most commonly used in CBP's aircraft modification environment.

This IDIQ does NOT incorporate or establish a Service Contract Labor Standards (SCLS). Again, the government only used the BLS definitions for the basis of describing the labor category positions.

Management Occupations: Workers in these occupations establish plans and policies, direct business activities, and oversee people, products, and services.

Business Operations Specialist: Performs work directly related to management or general business operations. May include work in functional areas such as tax, finance, accounting, budgeting, auditing, insurance, quality control, purchasing, procurement, advertising, marketing, research, safety and health, personnel management, human resources, employee benefits, labor relations, public relations, government relations, computer network, internet and database administration, legal and regulatory compliance, and similar activities.

RFPVolume III Business Management Information - Price Proposal (p. 73)Are subcontractors required to submit pricing or narrative?Subcontractors are not required to submit pricing or narrative directly; however, it is the Prime Contractor's responsibility to provide the necessary agreement information and pricing information if it impacts the Prime's rates.
RFPIII.22 Price Evaluation (p. 76)Are indirects allowed on NTE values?Indirect/General and Administrative (G&A) expenses can be included within the invoiced amount; the Government will set a Not-to-Exceed (NTE) amount for each task order.
RFPIII.17 General Instructions (p.70)Section III.17 states "To address the Demonstrated Prior Experience factor, Offerors shall describe similar in scope and complexity to the objectives described in the SOW and the five listed topics below for which the Offeror has performed." Later in this section it states, "The Experience shall demonstrate the below characteristics within projects similar in scope and complexity of the requirement as described in the SOW:".

Will the Government clarify, are offerors to provide experience relevant to the 5 characteristics (Major Alterations to Fixed Wing Platforms, Major Alterations to Rotary Wing Platforms, etc.) or are offerors supposed to provide experience relevant to the 5 characteristics AND other objectives in the SOW, such as purchasing aircraft parts and equipment? The offeror shall provide their demonstrated prior experience in accordance with the 5 categories listed in the RFP.

The "and other objectives in the SOW" was removed from the RFP.

RFPIII.17 General Instructions (p.69 & 77)Page 69 states that "The Title Page, table of contents, indexes and glossaries will not count against page limitations." Since Volume II - Technical Approach Proposal (Phase 2 - Factor 2) combines the Executive Summary and Table of Contents into one section (Section 2), will the Government also exclude the Executive Summary (therefore all of Section 2) from the page limitations?The Executive Summary and Table of Contents will be excluded from the page limitation count.
RFPIII.17 General Instructions (p.71)Page 71 states, "For requirements that describe a mandatory feature, the response may consist of a reference to the offeror's technical literature. Any technical literature used as a reference must be furnished as an attachment to the proposal." Will the Government clarify if this literature is part of the page limitation?This portion of the RFP was revised and removed the technical literature verbiage.
RFPAppendix 2 Major AlterationsWould the government consider expanding the definition of Major Aircraft Alterations to include glass cockpit upgrades?No. The minor and major aircraft alterations definitions are defined in the SOW and Appendix.
RFP+70B02C24R00000060, Attachment+3_Pricing+TemplateRFP Section "Contract Line Item Number (CLIN) Structure" and Attachment+3 Pricing TabWould the USG please indicate which sections of the pricing tab should be included in the CLIN X001 Labor series and CLIN X002 Engineering series total price for each order period? Is it the intent that only the "Engineering Positions" section would be applied to the CLIN Engineering X002 series while all other sections would be applied to the X001 Labor CLIN series for each respective order period?Correct. All labor categories except for the engineering positions would fall under CLIN X001 Labor.
Attachment+3_Pricing+TemplatePricing TabIn Attachment+3_Pricing+Template, there are labor categories that the contractor does not charge direct to programs and captures separately in DCAA approved overhead rates (specifically "Buyers and Purchasing Agents" and "Computer Support Specialist (IT Technician)"). In execution, these labor categories will be available to support the program, however, will not charge direct.
Because these individuals are already captured in the DCAA approved overhead rates applied to the labor hour cost buildup, would the USG please consider removing these categories from the buildup of the total evaluated price for the proposal?At this time, a rate shall be provided for the respective labor positions.
Attachment+2_SOW+AppendixAppendix 3 AIRCRAFT MAINTENANCE LABOR CATEGORIESIn Appendix 3 AIRCRAFT MAINTENANCE LABOR CATEGORIES, there are categories that the contractor does not have charge direct to programs and captures separately in our DCAA approved overhead rate applied to all labor (such as "Buyer", "Contracts Manager", and "IT Technician"). In execution, these labor categories will be available to support the program, however, will not charge direct.
Is it the intent of the USG to require these categories to be priced separately within the proposal or at time of execution?The categories will be priced separately within the proposal on the Pricing Template attachment provided by the government.
RFP+70B02C24R00000060, Attachment+3_Pricing+TemplateRFP Section "Period of Performance" and Attachment+3 Pricing TabIn Attachment+3_Pricing+Template, there is an hourly rate for each labor category for each order period. In the RFP+70B02C24R00000060 under Period of Performance, it states "Task Orders (TOs) may have a period of performance of 12 months beyond the last day of the contract’s ordering period. A TO may be placed against the anticipated contract on or before the last day of the contract’s ordering period."
Is it the intent for this hourly rate in each order period to cover the entire 24 month potential of the order period (for example, a single rate for order period one that could be applied anytime from January 2025 through December 2026), or is it the intent to provide a rate for the calendar year associated with that order period (with an escalated rate for the next fiscal year allowable if the work is taking place outside of the fiscal year associated with the order period)?The scope for tasks are not anticipated to exceed 12 months; however, in the instances where the task commences in one period and extends into the following period, the applicable rate from when the order was issued shall be applied for the entire task.
Attachment1_Statement+of+Work_10242024Paragraph 11. Technical Interchange MeetingsThe first sentence states the contractor "…shall participate…" in the TIM however the last sentence states the contractor "…shall conduct…" the TIM. Can the USG please clarify which is correct?The term "participate in" was changed "conduct" in the Statement of Work (SOW).
Attachment1_Statement+of+Work_10242024Paragraph 31.a. Technical ManualsThe third paragraph states "The Contractor shall be responsible for maintaining the currency of the technical manuals." Can the USG please clarify if this is just for the respective TO work / while a given aircraft is in the contractor's facility for TO work?The SOW was revised to the following: The Contractor shall be responsible for maintaining the currency of the technical manuals that are impacted by the TO work.
RFP+70B02C24R00000060III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS - Phase 1 Volume - Demonstrated Experience (Factor 1)Section states that "Offerors shall describe similar in scope and complexity to the objectives described in the SOW and the five listed topics below for which the Offeror has performed." Further on, the instructions state "The Experience shall demonstrate the below characteristics..." and then lists the five (5). Within the volume's 25-page limit, does the USG require offerors to address their experience with ALL SOW sections in its Phase 1 response, or only those SOW sections applicable to the 5 stated characteristics of: 1. Major Alterations to Fixed Wing Platforms, 2. Major Alterations to Rotary Platforms, 3. Minor Alterations, 4. Heavy Maintenance (Depot Level), and 5. Performing Engineering Services?The offeror shall provide their demonstrated prior experience in accordance with the 5 categories listed in the RFP.

The "and other objectives in the SOW" was removed from the RFP.

RFP+70B02C24R00000060III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS - Phase 1 Volume - Demonstrated Experience (Factor 1)States: "if any of these categories will be covered by your subcontractor...". Please confirm that the term "categories" here pertains to the 5 stated characteristics of: 1. Major Alterations to Fixed Wing Platforms, 2. Major Alterations to Rotary Platforms, 3. Minor Alterations, 4. Heavy Maintenance (Depot Level), and 5. Performing Engineering Services.Yes, the categories are the five (5) listed in the question.
RFP+70B02C24R00000060III.17 Volume II – GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS -Technical Approach Proposal (Phase 2 – Factor 2)States “This volume must not contain any reference to cost”; however, resource information (such as data concerning labor hours and categories, materials, subcontracts, etc.) must be contained in the technical proposal so that the Contractor's understanding of the requirements may be evaluated.” As this is an IDIQ level proposal, on what should the offeror base the required labor hours and materials? Or, is the Government just looking for the offeror's approach to describe how we will establish such resources at the task/delivery order level?Yes, the government is looking for the offeror's approach to describe how we will establish such resources at the task/delivery order level.
RFP+70B02C24R00000060III.17 Volume II – GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS -Technical Approach Proposal (Phase 2 – Factor 2)Requirement states “For requirements that describe a mandatory feature, the response may consist of a reference to the offeror's technical literature. Any technical literature used as a reference must be furnished as an attachment to the proposal. If the reference contains the required technical detail, it is not necessary to restate such detail in the proposal itself. All references must clearly identify the volume, page and line number of the referenced material. For requirements that describe an optional feature or function, the offeror must provide a response on how this optional requirement is to be satisfied.” As this is an IDIQ level proposal , please confirm that “mandatory feature” , “optional feature”, and “functions” refer to the specific proposal requirements provided within Section III.17 d (e.g., Staffing Plan, Quality Control Plan, Hangar Facilities, etc.). If not, please further define what each of these terms mean.This section was removed from the RFP.
RFP_70B02C24R00000060
Attachment_3_Pricing_TemplatePage 17 of 77, Section II.8 (c)
Tab LC DefinitionsThere appears to be a contradiction between RFP_70B02C24R00000060, Page 17 of 77, Section II.8 (c) language and Attachment_3_Pricing_Template Tab LC Definitions.

The RFP states "The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference..."

No FAR clauses relevant to Service Contract Act (SCA) requirements in this section have been selected, however

Attachment_3_Pricing_Template Tab LC Definitions uses SCA DIRECTORY OF OCCUPATIONS Job Codes and Job Descriptions which would normally be used for SCA contracts.

Can the Government clarify that SCA Job Codes and Job Titles in the Pricing Template are not contractual requirements as the FARs governing these have not been incorporated by the Contracting Officer? The following definitions were added to the Pricing Template. These definitions are defined from the Bureau of Labor Statistics (BLS) to establish the labor categories that the government believes will be most commonly used in CBP's aircraft modification environment.

This IDIQ does NOT incorporate or establish a Service Contract Labor Standards (SCLS). Again, the government only used the BLS definitions for the basis of describing the labor category positions.

RFP_70B02C24R0000060 11.14 52.219-14 (f) (1) Limitations on Subcontracting Both of the following are selected under 52.219-14 (f) (1) Limitations on Subcontracting. Can the USG clarify which one applies?

[Contracting Officer check as appropriate.] [Z219_14DF1] By the end of the base term of the contract and then by the end of each subsequent option period; or [Z219_14DF2] By the end of the performance period for each order issued under the contract. The government has revised the selection to the following:

By the end of the base term of the contract and then by the end of each subsequent option period.

RFPRFP, pg 69, Electronic Written Submission"Offerors should either password protect or encrypt contents. Provide a separate e-mail for password. Offerors shall not submit PDF documents."
Question: Does CBP have a preferred encryption or password process?The government does not have preference on the submittal of the proposal.
RFPSection II.24, pg 44Question: What are the elements of the Contractor Performance Evaluations? Are they defined in FAR Subpart 42.15?This overall section is regarding Contractor Performance Assessment Reporting System (CPARS) for post award. The selected awardee will be issued a CPARS annually. The FAR does define and provide further information regarding the elements and definitions for CPARs.

The government is not evaluating an Offeror's CPARs for this solicitation.

RFP Solicitation Information, pg 3 "Extent of Competition: This procurement is being solicited as Full and Open Competition with a Total Small Business (SB) Set Aside."

Question: This IDIQ requires relationships with large business support suppliers (e.g. JHU APL for minotaur). Please confirm large business (LB) subcontractors are permitted to participate in task orders and explain any SB/LB work percentage restrictions or requirements.Offerors may partner with large businesses for the IDIQ. The large business are permitted in performing the task orders; however, 50% of the overall work for each respective task order shall be performed by the small business. Refer to 52.219–14 for additional information.
Attachment 3 Pricing Template.xlsxIDIQ Pricing SectionPricing Question(s):

1. Is the Program Manager '1,200 hours per year' intended to be used on a task order basis only?

Or does AMO anticipate having an IDIQ Program Manager available at all times including 12 months per year for calls and project planning?

2. The same question applies for the Deputy Program Manager.

3. Will CBP/AMO please provide additional explanation for the labor hours used in the pricing model?

4. Is any routine or depot maintenance anticipated to be required and included with any major or minor modifications support, during contract years 1, 2 and 3? 1. The Program Manager is intended to be used on a task order only basis. It is the government's intent to issue a task order to allow for initial services to commence such as on-boarding, planning, and other startup tasks.

However, a full time Program Manager is not anticipated for this IDIQ.

2. The Deputy Program Manager will also be tasked in the same manner as the Program Manager.

3. The labor hours are for evaluation purposes.

4. Depot/heavy maintenance is not anticipated for the first three ordering periods.

SOW Pg. 13, Para. 17a, FAA Certification In Section 17, Paragraph (a), FAA Certification, it references existing STC's.

Question: Could the government please clarify if the STC's are the "Held by and issued to the Government"- or held by and issued to the Contractor with Government retaining unlimited rights?

If so, will the government be able to provide the STC technical data or will the government -or the Contractor- be required to obtain technical data from the OEM? The government does not own the STCs. The government will provide any technical data if it is available.

The contractor will be required to obtain any necessary technical data or STCs required to perform a task order.

SOW Section 25 Warranty, pg 19 "Warranty work will be conducted at the Contractor’s facility unless agreed otherwise by both the Contractor and the Government."

Question 1: If warranty work is conducted at the Contractor's facility, is the Contractor expected to cover the cost of the aircraft transit to and from their facility?

In this Section under Warranty, it states that, "These Warranties shall start at aircraft acceptance." Normal OEM warranties are for 1 year and begin upon receipt.

Question 2: Will the government accept a shorter warranty period for "prototype" hardware/components?

Reasoning: Due to integration program schedule and procurement timelines, it may take several months to obtain hardware/components for integration, testing, and acceptance activities - which inherently will use several months of the initial OEM warranty period.

Answer 1: No, all cost to transit the aircraft will be covered by the government.

Answer 2: No, the warranties shall start at aircraft acceptance from the government.

SOWSection 32, pg 26, CDRLsRe: CDRLs A001 and A002
Question: Is the stated "10 days" in A001 and "30 days" in A002 referring to working days or calendar days?It is calendar days regarding the 10 and 30 days statement.
RFPIII.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALSDiscussion: Page72 states: "Technical proposals submitted in response to this RFP must be prepared and presented in the chronological format as described below. Failure to do so may result in the rejection of the proposal as non-compliant." There are six (6) topics listed in the section following this statement. In the Technical Proposal instructions on page 71, there is also a discussion of what the Technical Proposal should contain, such as '...a description of its overall operational approach' and 'perceived areas of risk and risk management'. It is not clear where offerors should address those items in our response, as they do not appear as part of the six (6) topics in the sections following the 'chronological format' .

Question: Please clarify where this information should be included in the Technical Proposal. Offerors shall provide their overall technical approach that is addressed under Section 3 - Technical approach then address the six (6) topics listed within that section. The chronological format should be:

-Technical Approach (summarized content) -6 Topics

RFPIII.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALSFor Volume II - Technical Proposals, Section 3 - Technical Approach, will the government consider numbering the items that are required to be 'provided in chronological format'?No. The six topics/categories are identified under the 'Technical Approach' section. Offerors should label or identify each title section in their response in the same chronological format at the RFP.
RFPQuestions/Proposal Due Date(s), Acquisition Timeline Table, and
III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALSWhat is the anticipated time from submission of Phase 1 proposals to notification to proceed (advisory notices)?It is contingent upon government review.
RFPQuestions/Proposal Due Date(s), Acquisition Timeline Table, and
III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALSHow long do you expect offerors will have to respond with Phase 2 proposals after the advisory notices are issued?The timeline will be provided at the conclusion of the Advisory Notice(s). However, only Offerors who elect to continue to Phase 2 after issuance of the advisory notification will be provided the final dates for Phase 2 submittals. The government will provide a sufficient amount of time to prepare Phase 2 submissions.
Attachment 3 Pricing TemplateInstructions TabIn the pricing template instructions, it indicates heavy maintenance (depot level) pricing is only for ordering periods four (4) and five (5). Should offerors assume this is for bidding purposes only?Ordering periods four (4) and five (5) is the timeframe of which the government is projecting the depot level work will be required. Pricing blocks are redacted for ordering periods one through three (1-3).
RFPII.14 52.219-14 LIMITATIONS ON SUBCONTRACTINGThe limitations on subcontracting clause on page 25 appears to have a typo in the selection blocks for item (f)(1). Please clarify which block is checked.The RFP has been revised.
RFPSF1449, PDF page 3, III.17 Volume III, Section 4 - Pricing DataDiscussion: The PDF page 3 introductions states: "This procurement is being solicited as Full and Open Competition with a Total Small Business Set Aside." And page 74, Section 4 pricing data states: "Full and open competition is expected which will be used to determine prices fair and reasonable." The SF1449 indicates this opportunity is set aside for small business.
Question: Will the government remove the language pertaining to "full and open" as this is a "restricted" bid?Section updated to state "Competition is expected which will be used to determine prices fair and reasonable."
RFPSF1449, PDF pages 2-4Would the government consider adding paragraph numbering and page numbers for the proposal instruction section following the SF 1449 of the solicitation?Page numbers have been left off to distingush between the instructions and the RFP clauses.
Attachment 3 Pricing TemplatePricing TabIn attachment 3-Pricing Template on the Pricing tab why does the Program Manager on rows 7, 30, and 54 have “Sub-Contractor” in parentheses?Clarified in the pricing template for the descriptions. The "Sub-Contractor" reference was removed and re-titled as "Task Order Program Manager". There is a definition for the position in the template.

There are two Program Management positions identified in the pricing template. The first being the Overall IDIQ Program Manager (Prime Contractor). This position will handle the overall logistics of the IDIQ throughout the span of the ordering periods.

The second Task Order Program Manager position will provide support for the specified task order. This could entail for overseeing the task order work either performed by the prime contractor or respective subcontractor (if applicable).

Attachment 3 Pricing TemplatePricing TabIn attachment 3-Pricing Template on the Pricing tab what is the Management Occupations on rows 15, 38, and 62? There is no labor category definition for this.Added the definitions to the pricing template.
Attachment 3 Pricing TemplatePricing TabIn attachment 3-Pricing Template on the Pricing tab, is the 'Business Operations Specialist' on rows 19, 42, and 66 the 'Contracts Manager' in the LC Definitions tab?Added the definitions to the pricing template.
RFP and SOWIII.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008), Phase 1: Volume I – Demonstrated Prior Experience (Factor 1), page 70 of 77
SOW Section 2 Task Descriptions, page 5 of 27Discussion: Regarding demonstrated experience, the Government states, "To address the Demonstrated Prior Experience factor, Offerors shall describe similar in scope and complexity to the objectives (underline added) described in the SOW and the five listed topics below for which the Offeror has performed."

We did not find a section in the SOW that listed Objectives. Section 2 on page 5 of the SOW lists SOW Tasks.

Question: Will the Government clarify if the word "objectives" in section III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008) refers to the SOW tasks listed in Section 2 of the SOW or is there a list of objectives?The RFP has been revised.
RFPIII.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008), Phase 1: Volume I – Demonstrated Prior Experience (Factor 1), page 70 of 77Discussion: Regarding demonstrated experience, the Government states, "Consideration will be given for aircraft types in the CBP inventory and the extensiveness of the experience."
Question: Will the Government define "extensiveness of the experience"? Question: Does the Government want comprehensive detail about each project cited and/or a large number of projects cited?1. The section of the RFP was revised.

2. As per the RFP, descriptions shall be sufficiently detailed to allow evaluators to judge relevancy to this Program within the page limits specified.

RFP III.17 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008), Phase 1: Volume I – Demonstrated Prior Experience (Factor 1), page 70 of 77, and

III.20 EVALUATION CRITERIA (JUN 2007), Technical Non-Price, page 75 of 77 Discussion: Regarding Instructions for the preparation of proposals, the Government states, "Consideration will be given for aircraft types in the CBP inventory and the extensiveness of the experience." In the Evaluation of Factor 1 Experience, the Government states, "In evaluating Factors 1 and 2, each factor will have its own confidence assessment. The government will consider the offeror’s approaches to arrive at a confidence assessment of the offeror’s likelihood of successfully performing the work and meeting the objectives. Factor 1 is the most important factor."

Question: Will the Government explain what "consideration will be given for aircraft types in the CBP inventory" in the Evaluation Criteria?

Question: Will the Government explain how "extensiveness of the experience" will be given consideration in the Evaluation Criteria? 1. The government understands that not all offeror's have directly worked on a CBP aircraft. However, consideration will be given if an Offeror has demonstrated experience working on the same type or similar type of aircraft in the CBP inventory.

2. As noted above, this section was revised.

RFPSolicitation InformationQuestion: Will the Government provide any information related to CBP AMO aircraft modification schedules for major and minor alterations, with any anticipated future workflow, specifically the number and type of modification (major or minor) and frequency, by aircraft type per year?The government cannot provide any further information at this time.
SOWStatement of Work (SOW), 6. Place of Performance and Period of PerformanceDiscussion: The Government states, "The primary place of performance shall be at the Contractor provided facility. The Government will transfer aircraft requiring alterations or maintenance from CBP aircraft facilities to the Contractor's place of performance."

Contractor provided facilities require hangar stack planning to effectively support the Government’s aircraft inductions.

Question: In order to plan for the appropriate amount of hangar space to be available will the Government provide more details on anticipated workflow for the contractor provided facilities? The government cannot provide a schedule at this time for task orders. The government will provide adequate planning/forecasting at time of request to fulfill the task orders.

Per the RFP, the offeror must include whether they have access to hangar facilities.

RFPVolume III - Business Management Information - Price Proposal (Phase 2 – Factor 3), Section 4, Page 74 of 77Discussion: The RFP states "Offerors shall also provide whole dollars (no cents) in their price submission."
Question: Is it the Government's intent for bidders to round up to the nearest dollar for each individual wage rate?Correct, please round to the nearest dollar.
RFPII.8.(c) Page 17 of 77Discussion: 52.222-43 has not been selected.
Question: Is it the Government's intent to not allow ceiling rate adjustments if there are increases to local AWDs?This IDIQ does NOT incorporate or establish a Service Contract Labor Standards (SCLS). As noted earlier, the government only used the BLS definitions for the basis of describing the labor category positions.
RFPIII.17, Volume I and Volume II, Section 3 - Technical Approach, page 71In Section 3, Technical approach, offerors are allowed to provide references to technical literature for those requirements that describe a mandatory feature. Will the government allow this same technical product literature as an attachment to Volume I as well?The RFP has been revised.
Attachment 2 SOW Appendix, Attachment 3 Pricing TemplateAPPENDIX 3 AIRCRAFT MAINTENANCE LABOR CATEGORIES and Pricing TabIn Attachment 2, SOW Appendix 3, there is an LCat definition for “Program Manager (Engineer)”, but nowhere to add rates on the pricing tab. This LCat is not listed in the pricing template. Please clarify.The appendix was revised to remove the position.
RFPIII.17, page 69The solicitation states: "Proposals shall be valid for a period of not less than 120 calendar days from the date of delivery." Please confirm this is intended for Phase 2 proposals only.Correct, Phase 2 proposals only.
RFPQuestions/Proposal Due Date(s) and Acquisition Timeline TableAfter Phase 1 is complete, will offerors have another opportunity to ask questions prior to Phase 2 proposal delivery?No further questions will be accepted.
RFPQuestions/Proposal Due Date(s) and Acquisition Timeline TableSince answers to questions will likely affect Phase 1 proposals, will offerors be afforded an extension to the 22 Nov due date to incorporate changes? Suggest 2 weeks from the time answers to questions are published.An extension has been granted until December 5, 2024.
RFPQuestions/Proposal Due Date(s) and Acquisition Timeline TableWhen does the government anticipate responses to questions will be published? If answers affect Phase 1 proposals, will offerors be afforded an extension to the 22 Nov due date to incorporate changes?An extension has been granted until December 5, 2024.
Questions/Proposal Due Date(s) and Acquisition Timeline TableWhat is the anticipated contract award date?The government anticipates an award in the second quarter.
RFPSF 1449, III.17, Volume III, Section 1 Signed ProposalSection 1, Signed Proposal provides instructions to fill out an SF33, but the solicitation includes an SF1449. Will the government provide updated instructions for completing the SF1449?The instructions were updated.
RFP 70B02C24R00000060GeneralWill the U.S. Government consider adding the following clause to this contract: 252.228-7001 Ground and Flight Risk?The Ground Flight Risk Clause (GFRC) 252.228-7001 is not applicable to U.S. Customs and Border Protection (CBP) as it is a Department of Defense (DOD) clause. CBP is a civilian agency and does not follow DFARS.
RFP 70B02C24R00000060GeneralIf the answer to the above question is no, how will the Government assess the safety operations and training of the awarded contractor?The government will conduct a final inspection and acceptance (per the RFP clauses) prior taking possession of the aircraft post modification.

Contractors will not be required to fly the aircraft. Contractors will be required to tow aircraft if needed. Training will only be required per the task order.

RFP 70B02C24R00000060Acquisition Timeline TableWill offerors be afforded an opportunity to ask questions if invited to Phase 2 of the RFP process?No further questions will be submitted after Phase 2.
RFP 70B02C24R0000006052.219-14(f)(1)It looks as though the USG checked this box under 52.219-14(f)(1) --

"[Z219_14DF1] By the end of the base term of the contract and then by the end of each subsequent option period"

Instead of an X, the box contains the above text. Can you confirm that this box is now checked in the Final RFP? Government will update and recheck to the following:

By the end of the base term of the contract and then by the end of each subsequent option period.

Attachment 2_SOW AppendixAppendix 3Will you add years of experience and education level for ALL exempt labor categories (those not included within the wage determination)The vendor shall provide their proposed ceiling rate based on the definition provided for each position. No additional years of experience/education will be added to the overall positions.
Attachment 2_SOW AppendixAppendix 3Will you review the Labor Categories and ensure that all SCA LCATS have a Wage Determination Code included in their description?Pricing template has been reviewed to remove the codes originally referenced.

File details come from the government source that posted it. Updated .