Evaluation Bunker Criteria.pdf

PDF 145 KB Posted

Attached to
NAF Bunker Renovation Woodlawn Golf Course (AMENDED 5 March 2025)
Solicitation number
700CONSNAFBUNKER2025
Issued by

About this file

This document outlines the evaluation factors and criteria for award of a NAF bunker renovation contract at Woodlawn Golf Course on Ramstein Air Base, Germany. The technical evaluation is conducted on an acceptable/unacceptable basis across five key criteria.

The contractor must meet specific requirements including: having an Eco/Dura Bunker certified team on-site with manufacturer certification and authorization to work in Germany; proper business registration and permissions for German operations; proof of completing at least 100 bunker projects using crumb rubber or capillary concrete liner systems within the past 5 years with before/after images; a list of owned equipment that complies with local/national environmental and safety requirements; and submission of current passport or identity card for security purposes. All five criteria must be met to receive an acceptable technical rating and advance to past performance evaluation. The work involves renovating 35 golf course bunkers using rubber liner and stacked synthetic edges.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Factors for Award

The following factors will be used to determine the best value to the NAFI:

1. Certifications and Training

2. Authorization to conduct business

3. Proof of work, resume of projects

4. Resources

5. Security

(1) Technical Evaluation. Technical evaluation shall be on an acceptable/unacceptable basis.

Criteria 1 Certifications and Training: Construction company must have an Eco/Dura Bunker certified team on site for the duration of the project.

This standard has been met when the construction company provides: Written certificate from Eco/Dura Bunker manufacturer stating that the team has been trained and certified directly by the manufacturer. Construction company must provide a letter of authorization from the manufacturer to purchase, install and provide warranty of Eco/Dura Bunker systems within Germany.

Criteria 2 Authorization to conduct business: Business registration and permission to work within Germany.

This standard has been met when the construction company submits: A copy of their business registration and authorization to conduct business in Germany.

Criteria 3 Proof of work, resume of projects: Provide documentation describing its experience as a business or corporation in performing as a construction company in the local industry. Construction company must have successfully completed 100 bunkers that utilized crumb rubber or capillary concrete liner systems.

This standard has been met when the construction company submits: Proof of at least 100 bunker projects within the last 5 years that included crumb rubber or capillary concrete liner systems. Concessionaire should provide resume of completed projects with before and after images as proof of work.

Criteria 4 Resources: Construction company must provide their own equipment and comply with all local and national environmental and safety requirements.

This standard has been met when: The construction company provides an equipment list.

Criteria 5 Security. Provide a copy of the current passport or identity card.

This standard has been met when: The offeror submits a copy of his/her passport or identity card

An offeror will receive an acceptable technical rating if all the standards are met from the above 5 criteria.

If any one criteria is not met, the offer will receive an unacceptable technical rating. All offers that receive acceptable technical ratings will be evaluated for past performance.

Evaluation Factors for Award

File details come from the government source that posted it. Updated .