This is a technical schematic drawing depicting a basement interstitial floor plan showing above-ground piping systems. The drawing illustrates the layout and configuration of a new SPS (Sprinkler Protection System) critical water loop that is to be separated from the SPS DI (Domestic Isolation) system and integrated into the RO (Reverse Osmosis) water loop. The schematic includes detailed pipe sizing, connection points, and dimensional specifications throughout the basement interstitial space, with measurements provided in inches and fractions thereof. Red lines highlight the critical water loop piping route, while black lines represent existing systems and connections. The drawing contains general notes addressing operational considerations, construction requirements, and inspection control measures during the installation phase. Revised notes section provides specific directives regarding pipe routing, connections, and system modifications. The plan is identified as project number 1345-P210 and is dated 10/26/17, prepared for the Office of Management and associated with an RO System Expansion project. This appears to be a construction or renovation document requiring coordination between mechanical systems within a basement infrastructure area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Work - SPS System Modifications.docx | DOCX document | |
| 10-Steam Test Port Map.pdf | ||
| 5-RO Loop Plan - Current.pdf | ||
| 6-SPS DI and RO Loop plan - Current.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Text Box New SPS critical water loop after SPS DI is separated and added to the RO water loop.
File details come from the government source that posted it. Updated .