10-Steam Test Port Map.pdf
PDF 212 KB Posted
- Attached to
- J046--Reverse Osmosis System Modifications
- Solicitation number
- 36C26326Q1027
About this file
This document is a floor plan architectural drawing depicting the layout of a medical sterilization facility. The plan shows the spatial organization of a Sterile Processing Department (SPS) with four steam sterilizers (labeled Steam #1, Steam #3, Steam #4, and an unlabeled unit) positioned in an orange-highlighted zone. The facility includes multiple functional areas: ante rooms for equipment staging, decontamination and scope processing areas, pass-through cart wash stations, a drying room, a cart lift system, and various office spaces distributed throughout the layout. The floor plan is oriented with reference grid coordinates (AA through HH horizontally, and numbered vertically from 15 to 21) and includes room designations such as BM-107D, BM-108, BM-111, BA-101 through BA-105, and M3. Equipment is marked in blue highlighting throughout the plan, indicating key operational components. The layout reflects standard sterile processing workflow design, with segregation between dirty utility, decontamination, processing, and clean storage zones to ensure proper infection control and operational efficiency in the sterilization facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Work - SPS System Modifications.docx | DOCX document | |
| 7-SPS Critical Water Loop plan - New.pdf | ||
| 5-RO Loop Plan - Current.pdf | ||
| 6-SPS DI and RO Loop plan - Current.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CC BB AA VWXY
ANTE ROOM
OFFICE
Z
DDEEFFGGHH
OFFICE
BM-107D
CLEAN
STORAGE
STAIR
BM-109
PASS
THROUGH
CART WASH
BM-108A
ANTE ROOM
CB90
COORIDOR
BM-105
HAC
BM-104
LOCKER
ROOM
BM-103
LOCKER
ROOM
CB88
COORIDOR
BM-107C
SCOPE
DECON
BM-111D
OFFICE
BM-108
OFFICE
BM-111
RoomBM-112
Room
M2
ELEVATOR
CB-79A
Room
BA-104
Room
BA-105
Room
BA-103
Room
BA-102
Room
C10
Room
BA-101
Room
BM-111B
Room
BA-106
Room
M3
CART LIFTBM-119
Room
BM-119E
DRYING
ROOM
BM-101
Room
BM-102
Room
BA-107
Room
CB-87
Room
BG-101
Room
BM-119D
Room
BM-114
OFFICE
BM-111C
Room
VHAMINKaediC Image
VHAMINKaediC Image
VHAMINKaediC Image
VHAMINKaediC Callout Steam #1
VHAMINKaediC Callout Steam #2
VHAMINKaediC Callout Steam #3
VHAMINKaediC Callout Steam #4
VHAMINKaediC Text Box Steam Sterilizers in SPS
VHAMINKaediC Arrow
| Floor Plans |
| 0-Floor Plan Existing |
File details come from the government source that posted it. Updated .