6-SPS DI and RO Loop plan - Current.pdf
PDF 470 KB Posted
- Attached to
- J046--Reverse Osmosis System Modifications
- Solicitation number
- 36C26326Q1027
About this file
This is a technical drawing document showing the Current DI and RO Loop Plan for basement interstitial floor piping above ground. The plan is a detailed schematic depicting the routing and layout of DI (Deionized) lines marked in blue and RO (Reverse Osmosis) lines marked in red throughout a building system. The drawing includes dimensional annotations, connection points marked with circles, and multiple branch lines with specifications for various pipe sizes and directions (up, down, across). The document contains general notes regarding operational constraints, construction requirements, and inspection control measures during installation, along with revised notes that reference specific modifications and dimensional changes to the piping configuration. The plan is labeled as project number 1345-P210 and includes standard architectural/engineering drawing conventions with a title block, revision history, and reference to Office of Project Management as the responsible entity. The document appears to be a construction or renovation plan for a water treatment or laboratory facility requiring precise piping coordination and installation specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Work - SPS System Modifications.docx | DOCX document | |
| 7-SPS Critical Water Loop plan - New.pdf | ||
| 5-RO Loop Plan - Current.pdf | ||
| 10-Steam Test Port Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Highlight
VHAMINKaediC Highlight
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Text Box Current DI and RO Loop Plan
VHAMINKaediC Callout DI Lines
VHAMINKaediC Callout RO Lines
File details come from the government source that posted it. Updated .