About this file

This is a Performance Statement of Work for a 12-month essential service plan covering three Thermo Fisher Scientific laboratory instruments: Orbitrap Ascend, Orbitrap Fusion, and Vanquish systems to be maintained for the National Institute of Environmental Health Sciences (NIEHS) located in Research Triangle Park, North Carolina.

The contractor shall provide Level 1 Complete Coverage maintenance services including field service engineer labor, travel, and parts for corrective maintenance with a targeted 3-business-day response time; priority technical support with immediate response; one scheduled annual preventive maintenance visit with standard PM kit included; access to online knowledge bases; 10 percent discount on spare parts and accessories; software and firmware updates; and 10 percent training class discounts. The contractor must respond to initial repair requests within 24 hours via remote technical assistance, with qualified service engineers arriving on-site within 72 hours. All repair parts must be manufacturer-approved and warranted for defects throughout the contract period. The contractor is responsible for all necessary personnel, labor, facilities, equipment, parts, materials, and supplies at no additional cost to the Government. Specific deliverables include preventive maintenance service reports with signatures from NIEHS officials, monthly reports detailing service requests and completions by type, servicing stickers affixed to each instrument, and a maintained history file documenting all repairs and maintenance. The contractor must develop an annual preventive maintenance schedule approved by the Contracting Officer's Representative (COR), maintain a current quarterly inventory list of covered instruments with detailed specifications, and comply with a quality assurance system consistent with commercial industry standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Statement of Work

Service Plan for Thermo Orbitrap Ascend, Orbitrap Fusion, and Vanquish systems

PART I

1. Introduction and Background

The National Institute of Environmental Health Sciences (NIEHS), located in the Research Triangle Park, North Carolina, is one of the 27 Institutes and centers composing the National Institutes of Health. The mission of the NIEHS is dedicated to reducing the burden of disease and dysfunctions associated with the environment. This mission is accomplished by conducting basic and applied research into the effect of environmental exposure on biological systems and human health, on the identification of susceptible human subpopulations and on the interaction between the environment genetics and age. The instruments specified herein are required and used to conduct the stated basic and applied research. NIEHS would like to secure a 12-month essential service plan on instruments needed to accomplish these research efforts.

2. Objective

This contract shall provide for a 12-month essential service plan which will include inspection, preventive maintenance, repair service, and software maintenance as required by NIEHS. The contractor shall provide all necessary services, parts, labor, travel, and trained technical personnel necessary to achieve this.

The equipment to be covered by this contract have been under continuous maintenance following the expiration of their manufacturer warranties. The instruments are therefore considered to be in optimum mechanical operating order with performance that is in accordance with the manufacturer’s design specifications. However, the contractor may elect to inspect and certify that the equipment is functioning properly.

3. General Requirements The services/work that the Contractor shall provide specifically includes those described or specified herein. However, the performance as described and specified shall not be deemed to constitute a detailed specification having the effect of excluding other needed work not specifically mentioned that will be necessary for the successful completion of this project as generally described. The Contractor is required to furnish all service necessary to successfully fulfill the overall objectives set forth in the contract.

The level of service shall be provided by the Contractor for Government-owned equipment as listed.

Level 1 – Complete Coverage

· Equipment listed under UNITY LAB SERVICES ESSENTIAL SERVICE PLAN shall, at a minimum, receive the following:

· Field Service Engineer labor, travel, and parts required for Corrective Maintenance visits with a targeted response time of 3 business days

· Priority status for technical support inquiries with a targeted immediate response time. A certified service engineer will conduct diagnosis and Corrective Maintenance procedures using the latest digital remote support tools

· One (1) scheduled annual standard Preventive Maintenance visit (standard PM kit included)

· Access to Unity Lab Services Online Knowledge Base

· 10% discount on spare parts (not covered by corrective maintenance), accessories, and consumables for the instruments covered under this contract and during the effective period of this contract (please ask for the discount when contacting your local Thermo Fisher Scientific parts ordering department)

· Software and firmware updates upon request and in conjunction with a scheduled Preventive Maintenance or Corrective Maintenance visit (updates are defined as changes of the existing software version that are intended to improve its performance)

· 10% discount off list price for the training classes purchased during the contract validity period. May not be available in all locations or used in conjunction with any other discounts or promotions (please check availability with your local Thermo Fisher sales representative or customer service team)

· Optional Add-on Services:

· Purchase of an Operational Qualification (OQ) with this contract includes an Instrument Requalification (RQ) in conjunction with a scheduled Corrective Maintenance. Scope of RQ testing is defined in the Unity Lab Services

· Re-Qualification Testing Matrix

· Purchase of an additional Preventive Maintenance with this contract available at a reduced price

· Equipment listed under UNITY LAB SERVICES ESSENTIAL SERVICE PLAN:

Manufacturer
System
Serial Number
Level of Service
Thermo
Thermo Scientific Orbitrap Ascend
FSN06-10003
Essential Service Plan-LSMS
Thermo
Vanquish NEO System
VN-S10-A-01
Essential Service Plan-HPLC
Thermo
System Orbitrap Fusion IC
FSN01-10001
Essential Service Plan-LSMS
Thermo
Vanquish Binary Pump H. Supports high-sp
VH-P10-A-02
Essential Service Plan-HPLC
Thermo
Vanquish Split Sampler HT.
VH-A10_A-02
Essential Service Plan-HPLC
Thermo
Vanquish Column Compartment H.
VH-C10-A-02
Essential Service Plan-HPLC

The COR or Alternate COR will request repair service when determined to be necessary to maintain the equipment in optimum mechanical operating order so that desired performance will be in accordance with design specification.

The Contractor shall be held responsible for the cost of any repairs caused by negligence and abuse on his/her part. The Contractor shall be responsible for the cost for safeguarding all Government property that will be serviced under this contract.

The Contractor shall maintain a current list of all instruments covered by this contract and shall provide an updated list to the COR on a quarterly basis. This list must include the following information for each covered instrument; description, model number, serial number, NIEHS property number (if applicable), location of instrument (room number), principal investigator, and responsible contact. Only listed instruments shall be covered by the terms of this contract.

The Contractor shall remove all trash, discarded parts, dunnage, and other material from areas immediately after completion of preventive maintenance and/or emergency repair. Government-owned dumpsters and recycling containers shall be used for disposal of this waste material. The general area shall be left in a clean and orderly condition free of any foreign material caused by the preventive maintenance or repair activities.

4. Contractor Personnel Requirements The Contractor shall provide trained personnel with experience in repair and maintenance of the equipment types listed herein. Personnel must be qualified to perform the required preventive maintenance services and repairs for all listed equipment, and to properly re-install relocated instruments.

The Contractor should demonstrate experience, qualifications, and availability of the proposed personnel to include detailed resumes, relevant proof of training, as well as descriptions of previous experience with projects of similar complexity. Personnel should be able to fulfill the administrative requirements for successful contract monitoring and reporting and have demonstrated ability to maintain the types of instruments and prepare service reports.

In the event the service representative is unable to rectify the situation, the Contractor shall provide a senior service engineer, or like, to resolve any problems. All workmanship performed by the Contractor shall be of acceptable industry standard quality and shall be immediately rectified at no additional cost to the Government upon notification of non-acceptability by the Government.

5. Specific Requirements and Tasks The Contractor shall furnish all necessary personnel, labor, facilities, equipment, parts, materials, and supplies to provide the required technical support and expertise for the following services:

a. Preventive Maintenance

The Contractor shall provide regular service that shall consist of a minimum of one preventive maintenance inspection. The instruments shall be inspected, and all necessary adjustments made at the time of. To continue proper performance, the units shall be checked completely for parts that may need to be replaced, reassembled, adjusted, and the unit will be thoroughly tested.

Preventative maintenance by the Contractor is to be made in accordance with model specific preventive maintenance checklists to assure maintenance in accordance with original factory specification. A copy of the preventive maintenance checklists shall be provided to the Government as part of the Contractor’s technical proposal. An annual preventative maintenance schedule shall be developed by the Contractor and provided to the COR for approval.

The Contractor must complete the PM’s and submit the paperwork to the Project Officer or Alternate Project Officer for instruments scheduled to receive service by the last day of the month following the scheduled PMs. The Contractor shall perform preventive maintenance procedures as described in checklists that are provided to the Government as part of the Contractor’s technical proposal. The Contractor shall provide the lab representative with a Preventive Maintenance Service Report upon completion of the preventive maintenance.

The Contractor shall notify the NIEHS users at least forty-eight hours in advance of making preventive maintenance inspections and shall confirm that the schedule work will be performed at a time convenient to the user.

b. Repair Service The Contractor shall perform all repairs as may be required to restore instruments to optimum operating capacity. The COR, Alternate COR or designated laboratory personnel may place calls for repairs; the caller will indicate the equipment in need of repair and its location. This contact with the Contractor will be done by the most convenient means, normally by direct telephone contact or email. The Contractor shall be required to respond to this initial contact within 24 hours such that remote technical assistance is provided. If on-site repairs are needed, a qualified service engineer must arrive to the laboratory site within 72 hours of the initial inquiry for assistance. The Contractor shall be required to furnish manufacturer approved repair parts. Repair parts used by the Contractor must be warranted against defects in materials and workmanship for the duration of the contract. The Contractor shall perform all repairs as may be required to restore instruments to optimum operating capacity. The COR, Alternate COR, or authorized lab representative may notify the Contractor for repairs; the initiator will indicate the equipment in need of repair and its location. This contact with the Contractor will be done by the most convenient means, normally by direct telephone contact or email. As a part of services provided under this contract, the Contractor shall, at no additional cost to the Government, perform all repairs necessary to prevent a breakdown or failure of Government-owned equipment covered by this contract.

Equipment shall be maintained by the Contractor to be 100% of equipment’s original specifications and technical updates.

c. Replacement Parts and Supplies All necessary repair parts and materials for maintenance of the instruments listed herein shall be furnished at no additional cost to the Government. The Contractor shall be required to furnish manufacturer approved repair parts. Repair parts used by the Contractor must be warranted against defects in materials and workmanship for the duration of the contract.

d. Reporting Requirement and Deliverables

1. Service Reports – Delivery Tickets: The Contractor shall instruct its service representatives to obtain a signature from the NIEHS official responsible for the equipment on a service report upon completion of each service call. A copy of the signed service report shall be left with the NIEHS official responsible for the instrument under repair. The Contractor shall also forward copies of the Preventive Maintenance, Repair Service, and Relocation Service Reports to the COR, by the last day of the month following the end of the scheduled activity. However, Emergency Maintenance Service Reports shall be forwarded to the COR within 10 working days after completion of the service. At a minimum, Service Reports should include the following:

A. The Model Number, Serial Number, NIH Property Decal Number (if applicable), Principal Scientist, Responsible User Name, Location, Date of Service, and a description of the service performed (i.e. calibration, parts replaced, etc.) for each instrument.

2. Monthly Report: The Contractor shall provide a typed monthly report to the Project Officer or Alternate Project Officer not later than the last working day of the month following each scheduled activity. The monthly report should include the following:

A. A summary of the number and types of requests (i.e. emergency repairs, service repairs, and relocation) received, and completed. This summary shall be broken down for each type of service and grouped according to the type of service performed. The report should include: The Model Number, Serial Number, NIH Decal Number (if applicable), Principal Scientist, Responsible User Name, Location, and Date of Service.

3. Servicing Stickers: The Contractor shall affix a new sticker to each instrument each time that service is performed on the instrument, removing and discarding any previous stickers. The sticker should include the following information:

A. Contractor Name & Contract Number, Instrument Serial Number, Instrument Model Number, Service Representative Name & Telephone Number and Date of Service.

4. History File: The Contractor shall maintain a history file on all repairs, emergency repairs, preventative maintenance, and relocations and must indicate any corrective action taken. The history file shall be the property of the Government and be turned over to the COR upon completion of the contract.

e. Quality Assurance System The Contractor's Quality Assurance System is an everyday tool to ensure the Government's performance standards are being met and should be consistent with Commercial Industry Performance Standards. The system may include, but is not limited to, a written set of self-inspection check lists developed by the Contractor which comprehensively detects variations from the contract requirements; recording of work data; problem analysis; feedback and control systems for correcting deficiencies; and the necessary documentation to record findings. The adequacy and efficient management by contractor personnel can have a great impact on both the performance of the contract and the Government's quality assurance surveillance of performance. For this reason, Contractors are encouraged to use any industry or commercial standards that are available in their Quality Assurance System. Further, the comprehensiveness of the contractor's Quality Assurance System must be commensurate with the complexities and criticality of the service being performed.

f. Inventory The COR and the Contractor shall perform a quarterly inventory of all equipment covered on the contract.

6. Government Responsibilities

The COR will ensure that the service personnel have government issued badges to gain access to the NIEHS facility and any equipment or instrument to be serviced.

The Government will monitor the Contractor’s performance under this contract and shall retain the right to perform unscheduled inspections, as it deems necessary. Furthermore, the Government retains all rights provided by the FAR (Federal Acquisition Regulations) clause entitled “Inspection of Services – Fixed Price” and any other inspection clause, which may be specified in the contract.

7. Inspection and Acceptance Criteria The COR and/or Alternate COR will monitor the Contractor’s activities and accomplishments and will indicate acceptance or non-acceptance of the deliverable. The deliverables identified above will be inspected and either approved or, if they are not acceptable, rejected by the COR and/or Alternate COR. Such inspections will occur within five workdays after receipt of the deliverable.

8. Definitions The definitions listed below are the special terms and phrases used in this Work Statement or elsewhere in the contract document. For the purpose of the contract, all definitions will apply throughout.

a. Preventive Maintenance (PM) – scheduled checks and services (to include adjustments, cleaning, calibration, inspection, parts replacement and equipment servicing) of installed equipment at intervals recommended by the manufacturer or standards within the industry to ensure proper and efficient operation with minimum breakdowns, deterioration, or other deficiencies.

b. Repair Service – The restoration of failed or failing Government-owned property to its intended capability or use. Repairs may be accomplished by replacement or restoration of component parts or materials that have deteriorated, worn out, or are broken and unable to perform to current prescribed standards.

PAGE

File details come from the government source that posted it. Updated .