7-S.Lapp A.Beiler Bid Schedule-Response .docx
DOCX document 4 MB Posted
- Solicitation number
- US.250056
- Issued by
- Lancaster County, York County, Pennsylvania
About this file
This is a bid schedule response document for the S. Lapp & A. Beiler Restoration Project Conowingo WS Bid #2, a stream restoration project in Pennsylvania involving the Department of Transportation Unit (DTU). The project encompasses streambank stabilization work at two sites: the Sam Lapp property (1,300 feet of stream restoration at 2384 Robert Fulton Hwy, Peach Bottom 17563) and the Amos Beiler property (628 feet of stream restoration at 824 Conowingo Rd, Quarryville 17566). The bidder must submit pricing for both sites combined and separately for the Sam Lapp site only. The scope of work is a build-to-print project with approved permits supplied and includes furnishing all materials, equipment, supplies, and labor to implement streambank stabilization using multiple Best Management Practice (BMP) approaches as described in the Pennsylvania Fish and Boat Commission's "Habitat Improvements for Trout Streams" guidance to achieve long-term stabilization and sediment reductions.
Award of the contract for both sites will be granted to a single contractor if the total bid cost does not exceed available grant funds; if the combined bid exceeds the grant amount, only the Sam Lapp project will be awarded. The DTU is not obligated to award any contract and may select a proposal based on criteria beyond lowest cost, including how proposals meet project objectives, quality of services, responsiveness, past performance, and ability to handle the work as specified in the solicitation materials. No set-asides are indicated in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DONEGAL CHAPTER OF TROUT UNLIMITED
BID SCHEDULE and RESPONSE FORM S. Lapp & A. BEILER STREAM RESTORATION
Project Title: “S. Lapp & A. Beiler STREAM RESTORATION” Bid Due Date/Time: November 9, 2026 at 6:00pm Bid Opening Date/Time: November 10, 2026 at 11:am
| Item No. |
| Description |
S. Lapp & A Beiler Combined Cost
S. Lapp Cost
| 1. |
| Material - (Material is quoted as installed) |
| 2. |
| Tools/Equipment – (rental optional) |
| 3. |
| Labor – Prevailing Wages |
| 4. |
| Other - Optional |
| 5. |
| Oversight, reporting and final report (3rd party consultant) |
| 6. |
| Total Cost |
· Bids shall be submitted on this form via PennBid (https://pennbid.bonfirehub.com).
· This project must be completed by March 1, 2028.
· The undersigned agrees to meet all requirements stated in the bid instructions, drawings, and specifications.
Company and EIN # : ____________________________________________________________ Company Address: ______________________________________________________________ Contact Name: _________________________________________________________________ Phone: ___________________ Fax: _____________________Email: ______________________ Planned Subcontractors: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ The following three references are provided with telephone numbers for projects completed of similar scope and size:
1. _________________________________ Phone: _______________
2. _________________________________ Phone: _______________
3. _________________________________ Phone: _______________
Date by which construction can begin: ____________________________
Signature: _________________________________________ Date: ______________________
File details come from the government source that posted it. Updated .