6-NAB-2025-00165.20250404.NWP.2021-Authorization.pdf

PDF 8 MB Posted

Attached to
S. Lapp & A. Beiler Restoration Project Conowingo WS Bid #2
Solicitation number
US.250056
Issued by
Lancaster County, York County, Pennsylvania

About this file

This document is a Department of the Army authorization letter issued by the U.S. Army Corps of Engineers, Baltimore District, in coordination with Pennsylvania state and local authorities for a stream restoration project. The authorization grants Nationwide Permit (NWP) 27 under Section 404 of the Clean Water Act to the Donegal Chapter of Trout Unlimited for the Conowingo Creek Restoration project on the Samuel K. Lapp Jr. property located in Fulton Township, Lancaster County, Pennsylvania. The project involves restoration of approximately 1,300 linear feet of streambank through installation of four boulder walls, three random boulder groups, 20 rock deflectors, one stone channel block, six j-hooks, three rock vanes, and two double rock cross vanes. The work will result in permanent impacts of 23,916 square feet (0.54 acre) and temporary impacts of 39,599 square feet (0.90 acre) of Conowingo Creek. The authorization is contingent upon all state authorizations being granted and compliance with both general NWP 27 conditions and nine project-specific special conditions outlined in the letter dated April 4, 2025.

The special conditions require adherence to detailed project plans prepared by RETTEW Associates, Inc., dated January 13, 2025, and mandate on-site presence of a qualified professional during construction to ensure proper installation of in-stream structures and implementation of sediment control measures. The permittee must submit as-built plans within 60 days of construction completion and conduct annual monitoring for three years post-completion, with reports due by December 31 of each monitoring year. Additional requirements include restoration of temporarily impacted wetlands with native seed mix, avoidance of tree cutting between May 15 and July 31 to protect Northern Long-Eared Bat and Tri-Colored Bat species, and submission of a signed certification of completion within 60 days of project conclusion. The NWP authorization is valid until March 14, 2026, and all terms and conditions remain binding if the property is transferred to new owners. The document includes comprehensive erosion and sediment control specifications, construction sequencing procedures, seeding requirements using native plant species, and riparian buffer planting and maintenance guidelines to be implemented throughout the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U. S. ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT

STATE COLLEGE FIELD OFICE

1631 SOUTH ATHERTON STREET, SUITE 101

STATE COLLEGE, PENNSYLVANIA 16801-6260

April 4, 2025

Operations Division

Mr. Chris Fitterling, Donegal Chapter of Trout Unlimited P.O. Box 8001 Lancaster, Pennsylvania 17604

Dear Mr. Fitterling:

This is in reference to your application, identified by this office as NAB-2025-00165-P33 (Conowingo Creek Restoration - Samuel K. Lapp Jr.), wherein you requested Department of the Army authorization to restore approximately 1,300-linear-feet of streambank along the Conowingo Creek. Restoration activities will include the installation of four boulder walls, three random boulder groups, 20 rock deflectors, one stone channel block, six j-hooks, three rock vanes, and two double rock cross vanes. The implementation of the proposed stream restoration will permanently impact 23,916-square-feet (0.54-acre) and temporarily impact 39,599-square-feet (0.90-acre) of Conowingo Creek. The proposed work is located in Fulton Township, Lancaster County, Pennsylvania.

Our evaluation has determined that the proposed work, if accomplished in accordance with the project plans, is authorized by Nationwide Permit (NWP)s for purposes of Section 404 of the Clean Water Act as published in the January 13, 2021 Federal Register, Final Notice of Issuance, Reissuance, and Modification of NWPs (86 FR 2744) and/or the December 27, 2021 Federal Register, Final Notice of Issuance, Reissuance, and Modification of NWPs (86 FR 73522), NWP number 27, provided all state authorizations are granted. If any of the information contained in the application and/or plan(s) is later found to be in error, this authorization may be subject to modification, suspension, or revocation.

Please note that you must comply with the general conditions and activity-specific impact limits and requirements for NWP 27, including Water Quality Certification conditions, if appropriate, at the following link:

https://www.nab.usace.army.mil/Missions/Regulatory/NWP/. If you are not able to access the conditions, please contact the project manager for a hard copy.

In addition, we have determined that the project-specific special conditions below must also be followed in performing the work to ensure that the project impacts to the aquatic environment are minimal:

https://www.nab.usace.army.mil/Missions/Regulatory/NWP/

-2-

1. The authorized work shall not permanently impact more than 23,916-square-feet (0.54-acre) and shall not temporarily impact more than 39,599-square-feet (0.90-acre) of Conowingo Creek.

2. The work shall be conducted in accordance with the attached project plans (Enclosure) entitled: “Conowingo Creek Restoration – Samuel K. Lapp, Jr.”, prepared by RETTEW Associates, Inc., Sheets 1 through 14, dated January 13, 2025.

3. The permittee shall require its contractors and/or agent to comply with the terms and conditions of this permit in the construction and maintenance of this project and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit.

4. All wetlands temporarily impacted because of project construction shall be restored to wetland conditions and seeded with native wetland seed mix.

5. To the extent possible, areas graded to create a floodplain bench shall be scarified to introduce microtopography components to create conditions for greater habitat and vegetative diversity.

6. No tree cutting shall be conducted during May 15-July 31, inclusive of any year to minimize impacts to the Northern Long-Eared Bat and Tri-Colored Bat.

7. The permittee shall have a qualified professional, with prior experience with stream restoration projects, on-site during project construction to: a) ensure that in-stream structures are installed properly; b) that sediment and control measures are properly implemented; and c) that all practicable steps are taken to minimize all temporary and permanent adverse impacts to the aquatic environment.

8. As-built plans of the Stream Restoration Project shall be submitted to nab-regulatory@usace.army.mil. Please include on the subject line “As-built Plans for NAB-2025-00165-P33”, within 60-days of completion of construction.

9. The permittee shall monitor the stream restoration and floodplain areas once annually for three years after completion of the project with monitoring reports provided electronically by email to nab-regulatory@usace.army.mil with a subject line of “NAB-2025-00165-P33 Monitoring Reports”, by December 31 of each monitoring year.

Annual monitoring should occur during the growing season and reports must include an evaluation of project integrity, brief analysis of the monitoring and inspection results, photographic documentation and proposed remedial measures, if needed. The photographic documentation should be clear and should show as much of the in-stream mailto:nab-regulatory@usace.army.mil

-3-work as required to verify whether the site is stable or if modification or maintenance is necessary.

Please note that as of the date of this authorization, your project is in compliance with Section 7 of the Endangered Species Act. However, new species may be listed, or additional populations found. Therefore, it is your responsibility to ensure that construction of the authorized work does not adversely affect any existing or newly listed federally endangered or threatened species. Information on threatened and endangered species and their critical habitat can be obtained from the offices of the United States Fish and Wildlife Service and National Marine Fisheries Service or their web pages at: https://ecos.fws.gov/ipac and https://www.greateratlantic.fisheries.noaa.gov/protected/section7/guidance/maps/index.

html respectively.

Please note that you are required to submit a signed certification documenting completion of the authorized activity and implementation of any required compensatory mitigation. An example of the information that is required is posted on the Baltimore District webpage at: https://www.nab.usace.army.mil/Portals/63/NAB-xxxx-xxxxx_XXXX_Universal_CompCert_Final.pdf. The signed certification should be emailed nab-regulatory@usace.army.mil within 60 days with NAB-2025-00165-P33 in the subject line following completion of the authorized work and any required mitigation.

Your signature on the certification verifies your understanding that the work was completed in accordance with the terms and conditions associated with your Department of the Army permit.

This verification is valid until the NWP is modified, reissued, or revoked. The NWPs issued in the January 13, 2021, Federal Register, Final Notice of Issuance, Reissuance, and Modification of NWPs (86 FR 2744) and/or the December 27, 2021, Federal Register, Final Notice of Issuance, Reissuance, and Modification of NWPs (86 FR 73522) expire on March 14, 2026. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued.

Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have twelve months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP.

After you have obtained all required federal, state, and/or local authorizations, you may proceed with the authorized work.

When the structures or work authorized by this NWP are still in existence at the time the property is transferred, the terms and conditions of this NWP, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this NWP and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. A copy of this NWP https://ecos.fws.gov/ipac/ https://www.greateratlantic.fisheries.noaa.gov/protected/section7/guidance/maps/index.html https://www.greateratlantic.fisheries.noaa.gov/protected/section7/guidance/maps/index.html https://www.nab.usace.army.mil/Portals/63/NAB-xxxx-xxxxx_XXXX_Universal_CompCert_Final.pdf https://www.nab.usace.army.mil/Portals/63/NAB-xxxx-xxxxx_XXXX_Universal_CompCert_Final.pdf

-4-verification signed by the transferee must be submitted to the Baltimore District to validate the transfer.

A copy of this letter is being provided to the Pennsylvania Department of Environmental Protection for informational purposes.

If you have any questions concerning this matter, please contact me at

(814) 235-1764 or alicia.e.palmer@usace.army.mil.

Sincerely, Alicia Palmer Biologist, Pennsylvania Section Regulatory Branch

Enclosure mailto:alicia.e.palmer@usace.army.mil

-5-

Transfer Form

NAB-2025-00165-P33 (Conowingo Creek Stream Restoration-Samuel K. Lapp Jr.)

TRANSFEREE SIGNATURE DATE TELEPHONE NO.

PRINTED NAME

ADDRESS

Return to Regulatory by email at nab-regulatory@usace.army.mil with NAB-2025-00165-P33 in the subject line.

To identify how we can better serve you, we need your help. Please take the time to fill out our customer service survey at:

https://regulatory.ops.usace.army.mil/customer-service-survey/ https://regulatory.ops.usace.army.mil/customer-service-survey/

PA ONE CALL UNDERGROUND UTILITY PROTECTION ACT

ONE CALL SYSTEM SERIAL NUMBER:

PURSUANT TO THE PROVISIONS OF ACT NO. 287 OF 1974, AS AMENDED BY ACT

187 OF 1996, ACT 181 OF 2006, ACT 160 OF 2016 AND ACT 50 OF 2017 OF THE

PENNSYLVANIA STATE LEGISLATURE, RETTEW ASSOCIATES, INC. HAS

PERFORMED THE FOLLOWING IN PREPARING THESE DRAWINGS REQUIRING

EXCAVATION OR DEMOLITION WORK AT SITES WITHIN THE POLITICAL

SUBDIVISION(S) SHOWN ON THE DRAWINGS:

1. PURSUANT TO SECTION 4, CLAUSE (2) OF SAID ACT, RETTEW

ASSOCIATES, INC. REQUESTED FROM EACH FACILITY OWNER

DESIGNATED ON SUCH LIST PROVIDED BY THE ONE CALL SYSTEM

NOTIFICATION, THE INFORMATION PRESCRIBED BY SECTION 2, CLAUSE

(4) OF SAID ACT, NOT LESS THAN TEN (10) NOR MORE THAN NINETY (90)

BUSINESS DAYS BEFORE FINAL DESIGN IS TO BE COMPLETED.

2. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS MET THEIR OBLIGATIONS OF CLAUSE (2) BY

CALLING THE PENNSYLVANIA ONE CALL SYSTEM SERVING THE

LOCATION WHERE THE WORK IS TO BE PERFORMED, AND SHOWING

THE ASSOCIATED SERIAL NUMBER(S) ON THIS/THESE DRAWING(S).

3. PURSUANT TO SECTION 4, CLAUSE (3) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

POSITION AND TYPE OF EACH FACILITY, AS DERIVED PURSUANT TO THE

REQUEST MADE AS REQUIRED BY CLAUSE (2),

4. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

TOLL-FREE NUMBER FOR THE ONE CALL SYSTEM AND THE SERIAL

NUMBER(S) FOR THE ASSOCIATED ONE CALL SYSTEM NOTIFICATION(S),

ADDITIONALLY, RETTEW ASSOCIATES, INC. DOES NOT MAKE ANY

REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE

INFORMATION RECEIVED PURSUANT TO SAID REQUEST, AND AS REFLECTED ON

THIS/THESE DRAWING(S), IS CORRECT OR ACCURATE. INFORMATION REFLECTED

ON THIS/THESE DRAWING(S) IS SHOWN AS REQUIRED BY SAID ACT NO. 160 OF

2016, AND AS PROVIDED BY THE FACILITY OWNER PURSUANT TO SECTION 2,

CLAUSE (4) OF SAID ACT.

DATE:

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES THREE (3)

WORKING DAYS NOTICE FOR CONSTRCTION

PHASE AND TEN (10) WORKING DAYS IN

DESIGN STAGE - STOP CALL1-800-242-1776

IT IS THE CLIENT'S RESPONSIBILITY TO NOTIFY RETTEW NO LESS THAN 10 DAYS

AND NO MORE THAN 90 DAYS PRIOR TO THE CONSTRUCTION BEGIN DATE. THIS

NOTIFICATION WILL ALLOW US TO UPDATE THE PA811 ONE CALL TICKETS

ASSOCIATED WITH THIS PROJECT, WHICH IS A REQUIREMENT UNDER ACT 287.

MAY 10, 2024

20241313719

CF

12FS

12FS

12FS

CF

12FS

CF

STANDARD E&S PLAN NOTES

1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE

IN ACCORDANCE WITH THE E&S PLAN. A COPY OF THE DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF

THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.

2. AT LEAST SEVEN DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND

GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER,

APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT, A REPRESENTATIVE FROM THE PA DEP, AND A REPRESENTATIVE FROM THE USACOE

TO AN ON-SITE PRECONSTRUCTION MEETING.

3. AT LEAST THREE DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT

1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.

4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL

CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.

5. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.

6. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED BEFORE

CLEARING AND GRUBBING OPERATIONS BEGIN.

7. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE

SLOPES SHALL BE 2H:1V OR FLATTER.

8. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED

EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST

MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION.

9. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT’S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL

BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.

10. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.

11. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED

IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.

12. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY ONTO ANY ROADS FROM THE PROJECT AREA WITHOUT UTILIZING A ROCK CONSTRUCTION ENTRANCES AS SHOWN ON THE PLAN DRAWINGS.

13. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY.

MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF

THOSE INSTALLED WILL BE REQUIRED.

14. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY

AGENCY OFFICIALS AT THE TIME OF INSPECTION.

15. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR

SURFACE WATER.

16. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN

DRAWINGS.

17. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES (6 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A

MINIMUM OF 2 INCHES OF TOPSOIL.

18. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL

BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.

19. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.

20. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY

FILLS.

21. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED

INTO FILLS.

22. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.

23. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING

TO THE STANDARDS OF THIS PLAN.

24. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE

STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.

25. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION.

CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER

MOVEMENTS.

26. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION

DISTRICT OR THE DEPARTMENT.

27. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.

28. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG OR EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER UNDISTURBED VEGETATED

AREAS.

29. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND MAKE SURE THE SITE(S) RECEIVING THE EXCESS HAS AN APPROVED AND FULLY IMPLEMENTED EROSION AND SEDIMENT CONTROL PLAN THAT MEETS THE CONDITIONS OF CHAPTER 102 AND/OR OTHER STATE OR FEDERAL

REGULATIONS.

30. THE OPERATOR SHALL ENSURE THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND

COMPLETELY IMPLEMENTED.

31. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER

102, EROSION CONTROL.

32. IF UNDERGROUND STORAGE TANKS, CONTAMINATED SOILS, OR CONTAMINATED FILL MATERIALS ARE

ENCOUNTERED, QUALIFIED PROFESSIONALS MUST BE CONSULTED TO ACCESS AND PROVIDE

RECOMMENDATIONS. QUALIFIED PROFESSIONALS MUST PROPERLY INVESTIGATE, HANDLE, REPORT, AND/OR MITIGATE, IF WARRANTED, SUCH ENCOUNTERED CONDITIONS, IN ACCORDANCE WITH INDUSTRY STANDARDS

AND LOCAL, STATE, AND FEDERAL REGULATIONS.

33. IF THE CONSTRUCTION ACCESS PATHS ARE SEVERELY DISTURBED, THOSE AREAS WILL BE SCARIFIED BEFORE

THEY ARE SEEDED AND MULCHED FOR FINAL STABILIZATION.

34. TEMPORARY STOCKPILE AREAS WILL BE RESTRICTED TO THE AREAS SHOWN ON THE PLAN. SOIL OR ROCK STOCKPILED IN THESE AREAS WILL BE PLACED HERE ONLY WHEN IT CAN BE USED FOR THAT WEEK'S WORK.

RECYCLING AND DISPOSAL METHODS

PROCEDURES, WHICH ENSURE THAT THE PROPER MEASURES FOR THE RECYCLING OR DISPOSAL OF MATERIALS ASSOCIATED WITH OR FROM THE PROJECT SITE, WILL BE UNDERTAKEN IN ACCORDANCE WITH DEPARTMENT REGULATIONS. INDIVIDUALS RESPONSIBLE FOR EARTH DISTURBANCE ACTIVITIES MUST ENSURE THAT PROPER MECHANISMS ARE IN PLACE TO CONTROL WASTE MATERIALS. CONSTRUCTION WASTES INCLUDE, BUT ARE NOT LIMITED TO, EXCESS SOIL MATERIALS, BUILDING MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC.

THAT COULD ADVERSELY IMPACT WATER QUALITY. THE CONTRACTOR SHALL PLAN AND IMPLEMENT MEASURES FOR HOUSEKEEPING, MATERIALS MANAGEMENT, AND LITTER CONTROL DURING CONSTRUCTION. WHEREVER POSSIBLE, RECYCLING OF EXCESS MATERIALS IS PREFERRED, RATHER THAN DISPOSAL. DISPOSAL OF CONSTRUCTION WASTES SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL GUIDELINES AND REGULATIONS.

CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE

1. IF THE SITE WILL HAVE EXCESS FILL THAT WILL NEED TO BE EXPORTED TO AN OFF SITE LOCATION, THE

RESPONSIBILITY OF CLEAN FILL DETERMINATION AND ENVIRONMENTAL DUE DILIGENCE RESTS ON THE APPLICANT. IF ALL CUT AND FILL MATERIALS WILL BE USED ON THE SITE, A CLEAN FILL DETERMINATION IS NOT REQUIRED BY THE OPERATOR UNLESS THERE IS A BELIEF THAT A SPILL OR RELEASE OF A REGULATED

SUBSTANCE OCCURRED ON THE SITE.

2. ALL FILL MATERIAL MUST BE USED IN ACCORDANCE WITH PA DEP'S POLICY "MANAGEMENT OF FILL"

DOCUMENT NUMBER 258-2182-773.

3. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT (NOT INCLUDING MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE), AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE

COMMONWEALTH UNLESS OTHERWISE AUTHORIZED.

4. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTIONS AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED

SUBSTANCE.

5. FILL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH PA DEP'S MUNICIPAL OR RESIDENTIAL WASTE REGULATIONS BASED ON 25 PA CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER

IS APPLICABLE.

MAINTENANCE EROSION AND SEDIMENT CONTROL

1. ALL EROSION AND SEDIMENT CONTROL FACILITIES MUST BE INSPECTED WEEKLY AND AFTER EACH RUNOFF

EVENT. ALL FACILITIES THAT ARE DAMAGED, CLOGGED, OR CAN NO LONGER PERFORM AS DESIGNED, SHALL BE REPLACED. REFER TO DETAILS ON THE PLANS FOR SPECIFIC MAINTENANCE METHODS FOR EACH

SEDIMENT-TRAPPING DEVICE.

2. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN ONE OF THE FOLLOWING MANNERS:

2.A. IN VEGETATED AREAS WITHIN LIMIT OF DISTURBANCE AND OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS, OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED.

2.B. OR, PLACED IN TOPSOIL STOCKPILES.

3. ANY PERMANENT SEEDED AREAS THAT BECOME ERODED OR DISTURBED SHALL HAVE THE TOPSOIL REPLACED, THE GRASS RESOWN, AND THE MULCH REAPPLIED, OR, AT THE DISCRETION OF THE OWNER, SOD MAY BE

INSTALLED.

4. THE PERMIT HOLDER SHALL BE RESPONSIBLE FOR MAINTENANCE OF EROSION AND SEDIMENT CONTROLS UNTIL THE SITE IS STABILIZED. PERMANENT STABILIZATION IS DEFINED, AS "A UNIFORM 70% VEGETATIVE COVER OF EROSION RESISTANT PERENNIAL SPECIES HAS BEEN ACHIEVED," OR THE DISTURBED AREA IS COVERED WITH AN ACCEPTABLE BMP, WHICH PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION. UNTIL SUCH TIME AS THIS STANDARD IS ACHIEVED, INTERIM STABILIZATION MEASURES AND TEMPORARY EROSION AND SEDIMENT CONTROL BMPS THAT ARE USED TO TREAT PROJECT RUNOFF MAY NOT BE REMOVED.

THERMAL IMPACTS

NO ADDITIONAL THERMAL IMPACTS SHOULD RESULT FROM THIS PROJECT. THERMAL IMPACTS WILL BE

AVOIDED/MINIMIZED DURING CONSTRUCTION BY:

1. MAINTAINING VEGETATIVE COVER AND LIMITING THE DISTURBED AREA TO THE GREATEST EXTENT PRACTICABLE: VEGETATION COOLS RUNOFF THROUGH THE PROCESS OF EVAPOTRANSPIRATION AND CANOPY COVER LIMITS GROUND SURFACE EXPOSURE TO DIRECT SUNLIGHT EFFECTIVELY CONTROLLING THERMAL

POLLUTION.

2. SEEDING AND MULCHING IMMEDIATELY FOLLOWING CONSTRUCTION LIMITS BARE GROUND EXPOSURE

REDUCING THE RUNOFF TEMPERATURES.

3. PLANTING TREES AND ENHANCING THE RIPARIAN CORRIDOR THE RUNOFF TEMPERATURE WILL BE REDUCED

DUE TO THE CANOPY OF THE TREES.

CONSTRUCTION EQUIPMENT AND STREAM CHANNEL NOTES

1. EQUIPMENT WORK WILL BE COMPLETED FROM THE TOP OF THE STREAM BANK WHERE FEASIBLE. WORK

AROUND EXISTING TREES (ESPECIALLY MATURE, HEALTHY, NATIVE TREES) AS MUCH AS PRACTICAL. THE

STREAM BED WILL NOT BE USED AS A TRAVEL CORRIDOR.

2. WHEN WORK IS TO BE COMPLETED ON THE OPPOSITE BANK FROM ACCESS, ONE OF THE FOLLOWING MAY

BE DONE:

2.A. COMPLETE THE WORK FROM THE ACCESS SIDE OF THE STREAM AND REACH ACROSS THE STREAM TO

THE OPPOSITE BANK;

2.B. USE A PROPOSED STRUCTURE ON THE ACCESS SIDE OF THE BANK AS A PLATFORM TO COMPLETE THE

WORK.

2.C. UTILIZE TIMBER MATS ON THE STREAM BED FOR ACCESS.

ANY AREA DISTURBED ACCESSING THE STREAM WILL BE RETURNED TO ORIGINAL CONDITIONS.

3. EQUIPMENT WILL BE INSPECTED DAILY TO ENSURE THERE IS NO LEAKING OF LUBRICANTS, FUEL, HYDRAULIC FLUIDS, OR ANTIFREEZE. ANY MACHINE THAT DEVELOPS A LEAK WILL BE REMOVED FROM

SERVICE UNTIL REPAIRS ARE COMPLETED.

RECEIVING WATER CLASSIFICATION WATER QUALITY DESIGNATION

1. CONOWINGO CREEK

1.A. DESIGNATED USE: COLD WATER FISHES, MIGRATORY FISHES (CWF, MF)

1.B. EXISTING USE: NO SEPARATE CLASSIFICATION

1.C. TROUT STOCKED WATERS. NO IN-STREAM WORK FROM FEBRUARY 15 TO JUNE 1.

PROJECT SITE LAND USES

PAST: AG FIELD AND FORESTED RIPARIAN BUFFER

PRESENT: AG FIELD AND FORESTED RIPARIAN BUFFER

PROPOSED: AG FIELD AND FORESTED RIPARIAN BUFFER

GEOLOGIC FORMATIONS

ACCORDING TO THE PA DCNR, THE PROJECT AREA IS UNDERLAIN BY THE PETERS CREEK SCHIST (Xpc) AND ULTRAMAFIC ROCKS (Xu).

THE PETERS CREEK SCHIST CONSISTS OF FINE-GRAINED, FINELY LAMINATED, CHLORITE-SERICITE (MICA) SCHIST CONTAINING NUMEROUS THIN BEDS OF QUARTZITE. THE QUARTZITIC LAYERS ARE INTERLEAVED WITH LAYERS OF MICA. ITS BANDING IS THIN AND STEEPLY DIPPING IN MOST PLACES, AND IT IS ESTIMATED TO BE 2,000 FEET THICK

(GEYER AND WILSHUSEN, 1982).

· EASE OF EXCAVATION: MODERATELY EASY; UNWEATHERED ROCK IS DIFFICULT; MODERATE DRILLING RATE.

· CUT-SLOPE STABILITY: FAIR, IN PART DUE TO PARTIAL DISINTEGRATION WHEN EXPOSED TO MOISTURE FOR A

RELATIVELY SHORT TIME; WHERE FAIRLY STEEP CUTS ARE MADE, MAINTENANCE IS REQUIRED; DRAINAGE

MAINTENANCE MAY BE NECESSARY.

ULTRAMAFIC ROCKS ARE MAGNESIUM-RICH ROCKS DERIVED FROM PYROXENITE AND PERIDOTITE. THEY ARE COMMONLY GREEN IN COLOR AND CAN BE FIBROUS, AND INCLUDE SERPENTINITE AND STEATITE. THERE IS NO

BANDING. THE THICKNESS IS UNKNOWN (GEYER AND WILSHUSEN, 1982).

· EASE OF EXCAVATION: DIFFICULT; SLOW DRILLING RATE; NUMEROUS QUARTZ VEINS CONTRIBUTE TO SLOW

DRILLABILITY.

· CUT-SLOPE STABILITY: FAIR TO GOOD, DUE TO FRACTURING.

SOILS LIMITATIONS AND RESOLUTIONS

THE USDA NRCS WEB SOIL SURVEY INDICATES THAT THE SOILS WITHIN THE LIMIT OF DISTURBANCE ARE COMPRISED OF

THE FOLLOWING:

· GdB GLENVILLE SILT LOAM, 3 TO 8 PERCENT SLOPES

· Nd NEWARK SILT LOAM

THE FOLLOWING ADDRESSES POTENTIAL SOILS USE LIMITATIONS AND PROPOSED RESOLUTIONS:

1. CUTBANKS CAVE

1.A. LIMITED SOILS: GLENVILLE AND NEWARK

1.B. RESOLUTIONS: THE SITE IMPROVEMENTS WILL REQUIRE BULK EXCAVATION. ADEQUATE SHORING IS TO BE

USED FOR ANY DEEP EXCAVATION.

2. CORROSIVE TO CONCRETE

2.A. LIMITED SOILS: GLENVILLE

2.B. RESOLUTIONS: OUTSIDE OF CONCRETE SHOULD BE TREATED PER CONTRACTOR'S DISCRETION.

3. CORROSIVE TO STEEL

3.A. LIMITED SOILS: GLENVILLE AND NEWARK

3.B. RESOLUTIONS: NO STEEL IS PROPOSED AS PART OF THIS PROJECT.

4. EASILY ERODIBLE

4.A. LIMITED SOILS: NEWARK

4.B. RESOLUTIONS: CONTROL RUNOFF THROUGH IMPLEMENTATION OF E&SC BMPs BEFORE IT DEVELOPS INTO

AN EROSIVE FORCE AND USE LAND ACCORDING TO ITS CAPABILITY.

5. FLOODING

5.A. LIMITED SOILS: NEWARK

5.B. RESOLUTIONS: AVOID CONSTRUCTION DURING FLOODING EVENTS, AND PERFORM CONSTRUCTION

DURING LOW FLOW CONDITIONS AS ABLE. IF NECESSARY, USE ADDITIONAL COFFERDAMS.

6. DEPTH TO SATURATED ZONE/SEASONAL HIGH WATER TABLE

6.A. LIMITED SOILS: GLENVILLE AND NEWARK

6.B. RESOLUTIONS: IF GROUNDWATER IS ENCOUNTERED DURING CONSTRUCTION, THE SEDIMENT-LADEN

WATER SHALL BE PUMPED TO AN APPROVED SEDIMENT-REMOVAL FACILITY SUCH AS A PUMPED WATER

FILTER BAG AND DISCHARGED AT A STABILIZED POINT OF DISCHARGE.

7. HYDRIC/HYDRIC INCLUSIONS

7.A. LIMITED SOILS: GLENVILLE AND NEWARK

7.B. RESOLUTIONS: A WETLAND STUDY WAS PERFORMED, AND SEE PLAN FOR WETLAND LOCATIONS.

WETLANDS ARE TO BE AVOIDED FOR THIS PROJECT.

8. LOW STRENGTH/LANDSLIDE PRONE

8.A. LIMITED SOILS: GLENVILLE AND NEWARK

8.B. RESOLUTIONS: SOIL AMENDMENTS AND PROPER COMPACTION TECHNIQUES MAY BE NECESSARY DURING

CONSTRUCTION. DO NOT COMPACT SOILS WHEN SATURATED.

9. SLOW PERCOLATION

9.A. LIMITED SOILS: GLENVILLE AND NEWARK

9.B. RESOLUTIONS: IF PONDING IS ENCOUNTERED DURING CONSTRUCTION, THE SEDIMENT-LADEN WATER

SHALL BE PUMPED TO AN APPROVED SEDIMENT-REMOVAL FACILITY SUCH AS A PUMPED WATER FILTER

BAG AND DISCHARGED AT A STABILIZED POINT OF DISCHARGE.

10. PIPING

10.A. LIMITED SOILS: GLENVILLE AND NEWARK

10.B. RESOLUTIONS: POTENTIAL SOIL PIPING ALONG OUTSIDE WALLS OF INSTALLED PIPE IS NOT A CONCERN

SINCE PIPES/CULVERTS ARE NOT PROPOSED AS PART OF THIS PROJECT. SOIL PIPING ELSEWHERE IS NOT A CONCERN SINCE PROPOSED GRADING ALONG THE STREAMBANKS PROVIDE POSITIVE OVERLAND FLOW

AND DRAINAGE TOWARDS THE STREAM.

11. POOR SOURCE OF TOPSOIL

11.A. LIMITED SOILS: GLENVILLE AND NEWARK

11.B. RESOLUTIONS: THIS SHOULD NOT BE A CONCERN SINCE THE PROJECT IS LOCATED WITHIN ALLUVIAL SOILS.

IF NEEDED, PROPER PREPARATION (RAKING, AMENDMENTS, ETC.) OF THE TOPSOIL WILL AID IN

VEGETATION ESTABLISHMENT. SEE ADDITIONAL GENERAL NOTES.

12. FROST ACTION

12.A. LIMITED SOILS: GLENVILLE AND NEWARK

12.B. RESOLUTIONS: FROZEN FILL MATERIAL MUST NOT BE USED IN CONSTRUCTION. PLACE ASIDE AND ALLOW

TO THAW AND DRY OUT PRIOR TO USE. DO NOT PLACE FILL ON FROZEN GROUND. ONLY EXCAVATE DURING

FREEZING TEMPERATURES WHEN FILL CAN BE IMMEDIATELY PLACED AND COMPACTED.

13. POTENTIAL SINKHOLE

13.A. LIMITED SOILS: NEWARK

13.B. RESOLUTIONS: SHOULD A SINKHOLE BE UNCOVERED OR DEVELOP, NOTIFY THE PROJECT ENGINEER AND

UTILIZE THE SINKHOLE REMEDIATION DETAIL ON THE PLANS.

14. WETNESS

14.A. LIMITED SOILS: GLENVILLE

14.B. RESOLUTIONS: USE WET TOLERANT VEGETATION WITHIN THESE AREAS AS APPLICABLE.

SCHEDULE OF MAINTENANCE OF EROSION & SEDIMENT CONTROLS

THE SOIL EROSION AND SEDIMENT CONTROLS UTILIZED IN THE DEVELOPMENT OF THIS PLAN SHALL BE MAINTAINED AND REPAIRED IN ORDER TO KEEP THEM IN EFFECTIVE CONDITION UNTIL PERMANENT STABILIZATION OCCURS. THE CONTRACTOR SHALL INSPECT AND PERFORM NEEDED MAINTENANCE AT A MINIMUM ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5" OF RAIN PER 24 HOUR PERIOD. IN ORDER TO ASSURE PROPER FUNCTION, MAINTENANCE OF THE CONTROLS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING

MAINTENANCE PROCEDURES FOR UTILIZED CONTROLS:

INSPECTIONS MUST BE BY A QUALIFIED PERSON TRAINED AND EXPERIENCED IN EROSION AND SEDIMENT CONTROL. A WRITTEN REPORT OF EACH INSPECTION SHALL BE KEPT AND DOCUMENTED IN AN INSPECTION LOG DEP FORM

3150-PM-BWEW0083 DATED 2/2012, TO BE MAINTAINED ON SITE AT ALL TIMES.

ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN-OUT, REPAIR, REPLACEMENT, RE-SEEDING, RE-MULCHING, AND RE-NETTING, MUST BE PERFORMED IMMEDIATELY.

MISCELLANEOUS ADJUSTMENTS AND CORRECTIONS SHALL BE MADE TO ANY EROSION CONTROL STRUCTURE AS DEEMED NECESSARY BY THE ENVIRONMENTAL INSPECTOR. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS

EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE NEEDED.

ROCK CONSTRUCTION ENTRANCE

1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT

ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED

IMMEDIATELY.

2. WHEELS ON ALL VEHICLES SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. IF WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO APPROVED SEDIMENT TRAPPING DEVICE. PRECAUTIONS MUST BE TAKEN TO PREVENT MUDDY WATER

FROM RUNNING INTO WATERWAYS OR STORM SEWERS.

FILTER SOCK

1. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING FILTER SOCKS.

2. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING ½ THE HEIGHT BETWEEN THE TOP OF THE FILTER SOCK

AND THE GROUND SURFACE.

3. REPAIR ANY RILLS OR GULLIES PROMPTLY.

4. RESEED OR REPLANT VEGETATION IF NECESSARY UNTIL THE SLOPE IS STABILIZED.

TOPSOILING

1. ADDITIONAL APPLICATIONS OR REPLACEMENT OF TOPSOIL IN GRADED AREAS SHOULD NOT BE NECESSARY.

HOWEVER IF LACK OF TOPSOIL IS NOTICED, THE CONTRACTOR SHALL INSTALL A 6" LIFT OF TOPSOIL TO PROMOTE VEGETATIVE GROWTH. THERE SHOULD BE AN EXCESS OF AVAILABLE TOPSOIL ON THIS PROJECT SITE.

2. TAKE CARE TO AVOID EXCESSIVE MIXING OF TOPSOIL INTO THE SUBSOIL.

3. PERMANENTLY STABILIZE THE SITE FOLLOWING APPROPRIATE PRACTICE STANDARDS AS QUICKLY AS PRACTICABLE.

4. PERIODICALLY INSPECT THE SITE UNTIL PERMANENT STABILIZATION IS ACHIEVED.

5. MAKE NECESSARY REPAIRS TO ERODED AREAS OR AREAS OF LIGHT VEGETATIVE COVER.

TEMPORARY SEEDING

1. AREAS THAT FAIL TO ESTABLISH A VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION SHOULD BE RE-SEEDED

AS SOON AS SUCH AREAS ARE IDENTIFIED.

PERMANENT SEEDING

1. EVEN WITH CAREFUL, WELL-PLANNED SEEDING OPERATIONS, FAILURES OCCUR. WHEN IT IS CLEAR THAT PLANTS

HAVE NOT GERMINATED ON AN AREA OR HAVE DIED, THESE AREAS MUST BE PREPARED AND RESEEDED IMMEDIATELY TO PREVENT EROSION DAMAGE. IT IS EXTREMELY IMPORTANT TO DETERMINE WHY GERMINATION DID NOT TAKE PLACE AND MAKE ANY NECESSARY CORRECTIVE ACTIONS. HEALTHY VEGETATION IS THE MOST EFFECTIVE EROSION CONTROL AVAILABLE. SOME HIGHLY ACIDIC SOILS (ESPECIALLY AROUND VARIOUS COAL SEAMS IN THE COALFIELDS) WILL RESIST THE BEST EFFORTS TO REVEGETATE THEM. IN THESE CASES, TOPSOILING WILL BE

THE ONLY WAY TO ESTABLISH VEGETATION.

MULCHING

1. ALL MULCHES AND SOIL COVERINGS SHOULD BE INSPECTED PERIODICALLY (PARTICULARLY AFTER RAINSTORMS AND

HIGH WINDS) TO CHECK FOR EROSION AND DISPLACEMENT. WHERE EROSION IS OBSERVED IN MULCHED AREAS, ADDITIONAL MULCH SHOULD BE APPLIED AND EROSION REPAIRED IF NECESSARY.

2. NETS AND MATS SHOULD BE INSPECTED AFTER RAINSTORMS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, REINSTALL NETTING OR MATTING AS NECESSARY AFTER REGRADING TO REPAIR DAMAGE TO THE SLOPE OR DITCH. INSPECTIONS SHOULD TAKE PLACE UP UNTIL GRASSES ARE FIRMLY ESTABLISHED OR THE AREA IS

REDISTURBED.

ROLLED EROSION CONTROL PRODUCTS (RECPs) (SLOPE & CHANNEL MATTING)

1. BASIC MONITORING SHOULD CONSIST OF VISUAL INSPECTIONS TO DETERMINE MAT INTEGRITY AND ATTACHMENT

PERFORMANCE. RILL DEVELOPMENT BENEATH THE MAT OR EDGE LIFTING IS EVIDENCE OF INADEQUATE ATTACHMENT. UNTIL THE VEGETATION IS FULLY ESTABLISHED, THE GROUND SURFACE SHOULD BE INSPECTED FOR

SIGNS OF RILL OR GULLY EROSION BELOW THE MATTING.

2. ANY SIGNS OF EROSION, TEARING OF THE MATTING, OR AREAS WHERE THE MATTING IS NO LONGER ANCHORED FIRMLY TO THE GROUND SHOULD BE REPAIRED. REPAIR ANY DAMAGED AREAS IMMEDIATELY BY RESTORING SOIL TO FINISHED GRADE, RE-APPLYING SOIL AMENDMENTS AND SEED, AND REPLACING THE RECPs. ADDITIONAL STAKING AND TRENCHING CAN BE EMPLOYED TO CORRECT DEFECTS. RECENTLY PLACED MATS MAY BE REPLACED, BUT ONCE VEGETATION BECOMES ESTABLISHED, REPLACEMENT IS NOT A REASONABLE OPTION UNLESS LARGE FAILURES HAVE OCCURRED. IF THE RECPs ARE VEGETATED, THE VEGETATION SHOULD BE WATERED AS NEEDED. GETTING GRASS

ESTABLISHED AS QUICKLY AS POSSIBLE IS VERY IMPORTANT.

RIP-RAP

1. INSPECT AFTER HIGH FLOWS FOR EVIDENCE OF SCOUR BENEATH THE RIPRAP OR FOR DISLODGED STONES.

2. IF A SIGNIFICANT NUMBER OF STONES HAVE BEEN DISLODGED IT WILL BE NECESSARY TO RECALCULATE STONE SIZE

AND REPLACE THE EXISTING STONE WITH PROPERLY SIZED STONE.

3. ANY REPAIRS MUST BE MADE IMMEDIATELY.

DEWATERING BAG

1. THE FILTERING DEVICES MUST BE INSPECTED FREQUENTLY DURING PUMPING OPERATIONS AND REPAIRED OR

REPLACED ONCE THE SEDIMENT BUILD-UP PREVENTS THE STRUCTURE FROM FUNCTIONING AS DESIGNED.

2. THE ACCUMULATED SEDIMENT THAT IS REMOVED FROM A DEWATERING DEVICE MUST BE SPREAD ON-SITE AND

STABILIZED OR DISPOSED OF AT AN APPROVED DISPOSAL SITE AS PER APPROVED PLAN.

TIMBER MATS

1. TIMBER MATS SHALL BE INSPECTED DAILY AND AFTER EACH RUNOFF EVENT.

2. TIMBER MATS SHALL BE REPLACED OR REPAIRED IF BROKEN. GEOTEXTILE SHALL BE REPLACED OR REPAIRED IF TORN.

3. ANY ACCUMULATED SEDIMENT FROM THE TIMBER MATS SHALL BE REMOVED AND RETURNED TO THE

CONSTRUCTION SITE IN AN UPLAND AREA.

CONSTRUCTION SEQUENCE

GENERAL

1. CONSTRUCTION WILL PROCEED IN A TIMELY MANNER IN ORDER TO LIMIT THE POTENTIAL FOR ACCELERATED EROSION AND SEDIMENTATION. THE SEQUENCE OF EARTHMOVING ACTIVITIES SHALL BE APPROXIMATED AS FOLLOWS.

2. CHANGES OR ALTERATIONS TO THIS CONSTRUCTION SEQUENCE MAY OCCUR DUE TO FIELD CONDITIONS, CONSTRUCTION SCHEDULING, SEASONAL CONDITIONS TO PREVENT ACCELERATED EROSION AND SEDIMENTATION OF THE PROJECT SITE.

3. AT LEAST TEN DAYS PRIOR TO WORK COMMENCING, CONTACT PA FISH & BOAT COMMISSION TO PROVIDE NOTIFICATION OF THE

PROJECT.

4. AT LEAST SEVEN DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT, A REPRESENTATIVE FROM THE PA DEP, AND

A REPRESENTATIVE FROM THE USACE TO AN ON-SITE PRECONSTRUCTION MEETING.

5. AT LEAST THREE DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND

UTILITIES.

6. CONSTRUCTION SHALL TAKE PLACE DURING PERIODS WHEN THE STREAM IS AT LOW FLOW.

SITE IMPROVEMENTS

1. ESTABLISH THE LIMIT OF DISTURBANCE BY VISUAL MEANS (TEMPORARY STAKES, FLAGGING, PAINT MARKINGS, ETC.).

2. INSTALL ROCK CONSTRUCTION ENTRANCE 1. ESTABLISH TEMPORARY STOCKPILE AREA 1, AND INSTALL FILTER SOCK ALONG

DOWNSLOPE EDGE OF STOCKPILES.

3. MAKE EVERY EFFORT TO WORK AROUND EXISTING TREES (ESPECIALLY MATURE, HEALTHY, NATIVE TREES) AS MUCH AS PRACTICAL

THROUGHOUT DURATION OF PROJECT.

4. INSTALL CONSTRUCTION FENCE ADJACENT TO WETLAND WHERE INDICATED. INSTALL TEMPORARY FORD CROSSING 1. DO NOT

INSTALL AG CROSSING 1 FOR CONSTRUCTION ACCESS.

5. BEGINNING UPSTREAM AND PROCEEDING DOWNSTREAM, INSTALL IN-STREAM STRUCTURES AND COMPLETE GRADING. PER PA FISH AND BOAT COMMISSION DIRECTION, THIS IS BEST ACCOMPLISHED WHEN CONSTRUCTED DIRECTLY IN THE STREAM FLOW.

6. UPON REACHING FINAL GRADE, IMMEDIATELY SEED AND STABILIZE AROUND EACH STRUCTURE, STREAMBANKS, AND ANY AREA NO

LONGER NEEDED FOR ACCESS THROUGHOUT ALL PHASES OF THE PROJECT.

7. INSTALL TEMPORARY FORD CROSSING 2. PROCEED INSTALLING IN-STREAM STRUCTURES AND COMPLETE GRADING WHERE THIS FORD IS NEEDED TO ACCESS. IMMEDIATELY SEED AND STABILIZE ADJACENT AREAS WHEN COMPLETE.

8. REMOVE THIS FORD WHEN IT IS NO LONGER NECESSARY. REMOVE WESTERN STONE APPROACH, AND COMPLETE BOULDER WALL 2.

SEED AND STABILIZE AREA ACCORDINGLY. ENSURE ROCK DEFLECTOR 10 AND J-HOOK 2 ARE COMPLETE AND REMOVE TIMBER MATS FROM STREAMBED. REMOVE EASTERN STONE APPROACH, RESTORE AREA, AND SEED AND STABILIZE ACCORDINGLY.

9. CONTINUE TO PROCEED DOWNSTREAM, INSTALL IN-STREAM STRUCTURES, AND COMPLETE GRADING. IMMEDIATELY SEED AND

STABILIZE AROUND EACH STRUCTURE AND STREAMBANKS.

10. INSTALL TEMPORARY FORD CROSSING 3. PROCEED INSTALLING IN-STREAM STRUCTURES AND COMPLETE GRADING WHERE THIS FORD IS NEEDED TO ACCESS. IMMEDIATELY SEED AND STABILIZE ADJACENT AREAS WHEN COMPLETE.

11. REMOVE THIS FORD WHEN IT IS NO LONGER NECESSARY. REMOVE WESTERN STONE APPROACH, AND COMPLETE ROCK DEFLECTOR 12 AND BOULDER WALL 4. SEED AND STABILIZE AREA ACCORDINGLY. ENSURE ROCK DEFLECTOR 12 AND DOUBLE ROCK CROSS VANE 2 ARE COMPLETE AND REMOVE TIMBER MATS FROM STREAMBED. REMOVE EASTERN STONE APPROACH, RESTORE AREA, AND SEED AND STABILIZE ACCORDINGLY.

12. CONTINUE TO PROCEED DOWNSTREAM, INSTALL IN-STREAM STRUCTURES, AND COMPLETE GRADING. IMMEDIATELY SEED AND

STABILIZE AROUND EACH STRUCTURE AND STREAMBANKS.

13. RESTORE ANY TEMPORARY ACCESSES AS EACH IS NO LONGER NECESSARY. RESTORE TO PRE-CONSTRUCTION CONDITIONS, INCLUDING DECOMPACTING AREAS BY SCARIFYING, AND IMMEDIATELY SEED AND STABILIZE ADJACENT AREAS PER PLAN

SPECIFICATIONS.

14. WHEN ALL OTHER IN-STREAM CONSTRUCTION IS COMPLETE, REMOVE TEMPORARY FORD CROSSING 1 AND INSTALL AG CROSSING

1. IMMEDIATELY SEED AND STABILIZE THE ADJACENT AREA.

15. UPON ALL PROJECT AREA COMPLETIONS, REMOVE ROCK CONSTRUCTION ENTRANCE AND TEMPORARY STOCKPILE AREA. PROPERLY DISPOSE ANY REMAINING MATERIALS FROM STAGING AREAS. RESTORE TO PRE-CONSTRUCTION CONDITIONS, INCLUDING DECOMPACTING AREAS BY SCARIFYING, AND IMMEDIATELY SEED AND STABILIZE PER PLAN SPECIFICATIONS. UPON REACHING 70%

VEGETATIVE COVER, REMOVE FILTER SOCK OR SPREAD CONTENTS AS A SOIL ADDITIVE.

16. PLANT RIPARIAN BUFFER ACCORDINGLY.

SEEDING SPECIFICATIONS (SEE RIPARIAN BUFFER PLAN FOR LOCATIONS)

A. SEEDING FOR DISTURBED STREAMBANKS AND AREAS IN RIPARIAN BUFFER

1. RIPARIAN BUFFER MIX (ERNMX-178)

20.0% ELYMUS VIRGINICUS VIRGINIA WILDRYE

18.0% PANICUM CLANDESTINUM, TIOGA DEERTONGUE, TIOGA

17.9% ANDROPOGON GERARDII, 'SOUTHLOW'-MI ECOTYPE BIG BLUESTEM, ‘SOUTHLOW’-MI ECOTYPE

17.9% SORGHASTRUM NUTANS, NY4 ECOTYPE INDIANGRASS, NY4 ECOTYPE

9.0% PANICUM VIRGATUM, 'SHELTER' SWITCHGRASS, ‘SHELTER’

3.5% VERBENA HASTATA, PA ECOTYPE BLUE VERVAIN, PA ECOTYPE

3.0% RUDBECKIA HIRTA BLACKEYED SUSAN

2.4% ASCLEPIAS INCARNATA, PA ECOTYPE SWAMP MILKWEED, PA ECOTYPE

2.0% ASTER PILOSUS, PA ECOTYPE HEATH ASTER, PA ECOTYPE

2.0% HELIOPSIS HELIANTHOIDES, PA ECOTYPE OXEYE SUNFLOWER, PA ECOTYPE

1.5% ZIZIA AUREA, PA ECOTYPE GOLDEN ALEXANDERS, PA ECOTYPE

0.8% EUPATORIUM PERFOLIATUM, PA ECOTYPE BONESET, PA ECOTYPE

0.8% SOLIDAGO RUGOSA, PA ECOTYPE WRINKLELEAF GOLDENROD, PA ECOTYPE

0.5% MONARDA FISTULOSA, FORT INDIANTOWN GAP-PA ECOTYPE WILD BERGAMOT, FORT INDIANTOWN GAP-PA ECOTYPE

0.4% ASTER LANCEOLATUS LANCE LEAVED ASTER

0.3% EUPATORIUM FISTULOSUM, PA ECOTYPE JOE PYE WEED, PA ECOTYPE

2. SEED THIS MIX AT A RATE OF 20 LBS PER ACRE.

3. SEED THE FOLLOWING COVER CROP AT 30 LB PER ACRE:

3.1. DRY SITES - GRAIN OATS, JAN 1-AUG 1; OR, GRAIN RYE, AUG 1-JAN 1;

3.2. MOIST SITES - GRAIN RYE YEAR-ROUND.

B. SEEDING FOR DISTURBED PASTURE AREAS

1. MULTI-PURPOSE MIX (ERNMX-121)

25.0% FESTUCA ELATIOR X LOLIUM PERENNE, DUO FESTULOLIUM, ‘DUO’

20.0% DACTYLIS GLOMERATA, POTOMAC ORCHARDGRASS, POTOMAC

20.0% DACTYLIS GLOMERATA, 'TEKAPO' ORCHARDGRASS, ‘TEKAPO’

20.0% LOLIUM PERENNE, 'TETRA SWEET', TETRAPLOID PERENNIAL RYEGRASS, ‘TETRA SWEET’, TETRAPLOID

10.0% LOLIUM MULTIFLORUM ANNUAL RYEGRASS

5.0% TRIFOLIUM PRATENSE, MAMMOTH RED CLOVER, MAMMOTH

2. SEED THIS MIX AT A RATE OF 35-40 LBS PER ACRE.

C. VEGETATIVE STABILIZATION WILL BE PERIODICALLY INSPECTED FOR PROPER GROWTH. ANY AREAS NOT RESPONDING WILL BE PROMPTLY RESEEDED. AREAS, WHICH SHOW SIGNS OF EROSION, PRIOR TO STABILIZATION, SHALL BE GRADED, RESEEDED, AND

RE-MULCHED AS SOON AS POSSIBLE.

D. AVAILABILITY

1. SEED MIXES A-B ARE AVAILABLE FROM ERNST CONSERVATION SEEDS, 9006 MERCER PIKE, MEADVILLE, PA 16335, PHONE: (800) 873-3321, WEBSITE: HTTP://WWW.ERNSTSEED.COM. AN EQUIVALENT SEED MIX CAN BE USED AS APPROVED BY THE

DESIGNER.

TEMPORARY SEEDING SPECIFICATIONS

TEMPORARY SEEDING APPLICATION RATE

PERMANENT SEEDING APPLICATION RATE

NOTE: A COMPOST BLANKET WHICH MEETS THE STANDARDS OF CHAPTER 11 OF THE PADEP E & S MANUAL MAY BE

SUBSTITUTED FOR THE SOIL AMENDMENTS SHOWN IN THE TABLE ABOVE.

SOIL AMENDMENT PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

AGRICULTURAL LIME

10-20-20 FERTILIZER

AGRICULTURAL LIME

10-10-10 FERTILIZER

6 TONS

1,000 LBS.

1 TON

500 LBS.

240 LBS.

25 LBS.

40 LBS.

12.5 LBS.

2,480 LBS.

210 LBS.

410 LBS.

100 LBS.

OR AS PER SOIL TEST, MAY

NOT BE REQUIRED IN

AGRICULTURAL FIELDS

OR AS PER SOIL TEST, MAY

NOT BE REQUIRED IN

AGRICULTURAL FIELDS

TYPICALLY NOT REQUIRED

FOR TOP SOIL

TYPICALLY NOT REQUIRED

FOR TOP SOIL

SOIL AMENDMENT PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

SOIL AMENDMENT APPLICATION RATE EQUIVALENTS

NOTE:

RETTEW DOES NOT RECOMMEND SOIL AMENDMENTS FOR THIS STREAM

RESTORATION PROJECT DUE TO PROXIMITY TO STREAM AND ALLUVIAL SOILS.

HOWEVER IF STABILIZATION DOES NOT OCCUR IN A TIMELY MANNER, PLEASE

CONDUCT SOIL TESTING, AND FOLLOW THE BELOW RECOMMENDATIONS FOR

AMENDMENTS.

APPLICATION RATE (MIN.)

MULCH TYPE PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

STRAW

HAY

3 TONS

3 TONS

140 LBS.

140 LBS.

1,240 LBS.

1,240 LBS.

EITHER WHEAT OR OAT

STRAW, FREE OF WEEDS, NOT

CHOPPED OR FINELY BROKEN

TIMOTHY, MIXED CLOVER

AND TIMOTHY OR OTHER

NATIVE FORAGE GRASSES

MULCH APPLICATION RATES

WOOD CHIPS

HYDROMULCH

4 - 6 TONS

1 TON

185 - 275 LBS.

47 LBS.

1,650 - 2,500 LBS.

415 LBS.

MAY PREVENT

GERMINATION OF

GRASSES AND LEGUMES

SHOULD NOT BE USED ON

SLOPES STEEPER THAN 5%

PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON NONCROPLAND"

1. PLS IS THE PRODUCT OF THE PERCENTAGE OF PURE SEED TIMES PERCENTAGE GERMINATIONS DIVIDED BY 100. FOR EXAMPLE, TO SECURE THE ACTUAL PLANTING RATE FOR SWITCHGRASS, DIVIDE 12 POUNDS PLS SHOWN ON THE SEED TAG. THUS, IF THE PLS CONTENT OF A GIVEN SEED LOT IS 35%, DIVIDE 12 PLS BY 0.35 TO OBTAIN 34.3 POUNDS OF SEED REQUIRED TO PLANT ONE ACRE. ALL MIXTURES IN THIS TABLE ARE SHOWN IN TERMS OF PLS.

2. IF HIGH-QUALITY SEED IS USED, FOR MOST SITES SEED SPRING OATS AT A RATE OF 2 BUSHELS PER ACRE, WINTER WHEAT AT 1.5 BUSHELS PER ACRE, AND WINTER RYE AT 1 BUSHEL PER ACRE. IF GERMINATION IS BELOW 90%, INCREASE THESE SUGGESTED SEEDING RATES BY 0.5 BUSHEL PER ACRE.

SPRING OATS (SPRING), OR

WINTER WHEAT (FALL), OR

WINTER RYE (FALL)

64 96

MOST SITES ADVERSE SITES

SEEDING RATE - PURE LIVE SEED 1

SPECIES

DEP RECOMMENDED TEMPORARY SEED MIXTURE TO BE UTILIZED

MIXTURE

NUMBER

RIPARIAN BUFFER PLANTING NOTES

A. INSTALLATION NOTES

1. PLANTING SPECIES MAY VARY DUE TO NURSERY AVAILABILITY. IF SO, SUITABLE REPLACEMENTS ARE TO BE

USED WITH CLIENT AND OWNER APPROVAL.

2. INSTALL TREE TUBES ON ALL DECIDUOUS TREES WITHIN THE RIPARIAN BUFFER.

3. INSTALL SHRUB TUBES ON ALL SHRUBS WITHIN THE RIPARIAN BUFFER.

4. THE RIPARIAN BUFFER SHALL BE PLANTED BETWEEN MARCH 15TH TO MAY 15TH OR OCTOBER 1ST TO NOVEMBER 30TH AFTER SITE WORK IS COMPLETED. PLANTING SHALL NOT OCCUR IF THE GROUND IS FROZEN. FALL PLANTING IS RECOMMENDED IF POSSIBLE FOR BETTER ESTABLISHMENT AND SURVIVAL

RATES.

5. IF ADDITIONAL TREES REQUIRE REMOVAL BEYOND THOSE INDICATED ON THIS PLAN SET, ADDITIONAL

PLANTINGS CAN BE OBTAINED AND PLANTED AS REPLACEMENT.

6. IN AREAS WHERE EXISTING TURF IS TO BE MAINTAINED, HERBICIDE SPRAY IS NOT RECOMMENDED FOR INITIAL INSTALLATION. THE TURF SHALL BE REMOVED A MINIMUM OF 1' DIAMETER AROUND THE PLANTED

TREES AND MULCH APPLIED

B. RIPARIAN BUFFER MAINTENANCE - MAINTENANCE CAN INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING

TASKS OVER FIRST FIVE YEARS OF ESTABLISHMENT:

1. PLANTING SURVIVAL

1.a. PERIODIC WATERING DURING FIRST YEAR OF GROWTH, DROUGHT, AND THROUGHOUT FIRST THREE

GROWING SEASONS.

1.b. IF TREE SURVIVAL RATE IS OBSERVED TO BE LESS THAN REQUIRED DURING INSPECTION, REPLANTING

SHALL BE NECESSARY TO MEET THE BUFFER REQUIREMENTS. ANY REPLANTING SHALL OCCUR AT THE

SAME TIME PERIODS NOTED UNDER INSTALLATION.

1.c. MOW/WEED TRIM/APPLY AN APPROVED HERBICIDE AROUND PLANTINGS TO REDUCE COMPETITION

FROM OTHER PLANTS.

1.d. IDENTIFY AND ADDRESS ANY PLANT DISEASES.

1.e. STOP MOWING AREAS IF NATURAL REGENERATION OCCURS FROM DESIRABLE NATIVE PLANTS.

2. INVASIVE PLANT CONTROL

2.a. SPOT TREAT OR REMOVE SPECIFIC PLANTS.

2.b. MOW/WEED TRIM/APPLY AN APPROVED HERBICIDE AROUND PLANTINGS.

2.c. ADDITIONAL MOWING/WEED TRIMMING/HERBICIDE APPLICATION TO LARGER AREAS IF INVASIVE

PLANTS ARE MORE WIDESPREAD.

3. TREE/SHRUB SHELTERS

3.a. REPAIR BENT, TILTED, OR FALLING SHELTERS AND STAKES.

3.b. REPLACE MISSING SHELTERS, STAKES, AND TIES.

3.c. REMOVE UNDESIRABLE PLANTS FROM WITHIN SHELTERS.

3.d. REMOVE SHELTERS WHEN THE PLANTINGS BEGIN TO OUTGROW THE TUBE. THIS MAY TAKE SEVERAL

YEARS DEPENDING ON GROWING CONDITIONS AND TREE SPECIES.

4. LIMIT DAMAGE FROM LIVESTOCK, WILDLIFE, AND INSECTS

4.a. REPAIR OR ADD FENCE AND GATES FOR LIVESTOCK CONTROL.

4.b. REINFORCE FENCE OR SHELTERS.

4.c. MOW/WEED TRIM/APPROVED HERBICIDE APPLICATION AROUND PLANTINGS TO AID RODENT

PROBLEMS.

4.d. CONSIDER LEAVING SHELTERS/STAKES IN PLACE AFTER MATURITY IF THERE IS SIGNIFICANT DEER

DAMAGE.

4.e. IDENTIFY AND ADDRESS SIGNIFICANT INSECT DAMAGE.

2025-04-04T09:56:28-0400
PALMER.ALICIA.E.1503994344