3-Conowingo Creek Amos Beiler Site 1 Stream Plans 2025-06-24.pdf

PDF 4 MB Posted

Attached to
S. Lapp & A. Beiler Restoration Project Conowingo WS Bid #2
Solicitation number
US.250056
Issued by
Lancaster County, York County, Pennsylvania

About this file

Stream Restoration Plans Summary

This document contains stream restoration design plans for the Amos Beiler site, prepared in support of a Pennsylvania Department of Transportation Unit (DTU) stream restoration project bid solicitation. The project involves streambank stabilization and restoration work across two properties in Lancaster County: the primary Sam Lapp site requiring 1,300 feet of stream restoration at 2384 Robert Fulton Highway, Peach Bottom, and the secondary Amos Beiler site requiring 628 feet of stream restoration at 824 Conowingo Road, Quarryville. The scope of work encompasses furnishing all materials, equipment, supplies, and labor to implement multiple Best Management Practice (BMP) approaches for streambank stabilization, consistent with Pennsylvania Fish and Boat Commission guidelines for habitat improvements in trout streams. Bids must include total costs for both sites and separate pricing for the Sam Lapp site only, with both sites awarded to a single contractor if the combined bid is within available grant funds; otherwise, only the Sam Lapp project will be awarded.

The project utilizes a build-to-print delivery model with approved permits provided by the awarding agency. Award decisions will be based on how proposals meet project objectives, quality of services, responsiveness, past performance, and ability to execute the work, rather than solely on lowest price. The DTU retains discretionary authority regarding contract award and is not obligated to make any award under this solicitation. Funding for this initiative derives from designated grant funds available for stream restoration and environmental improvement purposes in Pennsylvania.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PA ONE CALL UNDERGROUND UTILITY PROTECTION ACT

ONE CALL SYSTEM SERIAL NUMBER:

PURSUANT TO THE PROVISIONS OF ACT NO. 287 OF 1974, AS AMENDED BY ACT

187 OF 1996, ACT 181 OF 2006, ACT 160 OF 2016 AND ACT 50 OF 2017 OF THE

PENNSYLVANIA STATE LEGISLATURE, RETTEW ASSOCIATES, INC. HAS

PERFORMED THE FOLLOWING IN PREPARING THESE DRAWINGS REQUIRING

EXCAVATION OR DEMOLITION WORK AT SITES WITHIN THE POLITICAL

SUBDIVISION(S) SHOWN ON THE DRAWINGS:

1. PURSUANT TO SECTION 4, CLAUSE (2) OF SAID ACT, RETTEW

ASSOCIATES, INC. REQUESTED FROM EACH FACILITY OWNER

DESIGNATED ON SUCH LIST PROVIDED BY THE ONE CALL SYSTEM

NOTIFICATION, THE INFORMATION PRESCRIBED BY SECTION 2, CLAUSE

(4) OF SAID ACT, NOT LESS THAN TEN (10) NOR MORE THAN NINETY (90)

BUSINESS DAYS BEFORE FINAL DESIGN IS TO BE COMPLETED.

2. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS MET THEIR OBLIGATIONS OF CLAUSE (2) BY

CALLING THE PENNSYLVANIA ONE CALL SYSTEM SERVING THE

LOCATION WHERE THE WORK IS TO BE PERFORMED, AND SHOWING

THE ASSOCIATED SERIAL NUMBER(S) ON THIS/THESE DRAWING(S).

3. PURSUANT TO SECTION 4, CLAUSE (3) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

POSITION AND TYPE OF EACH FACILITY, AS DERIVED PURSUANT TO THE

REQUEST MADE AS REQUIRED BY CLAUSE (2),

4. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

TOLL-FREE NUMBER FOR THE ONE CALL SYSTEM AND THE SERIAL

NUMBER(S) FOR THE ASSOCIATED ONE CALL SYSTEM NOTIFICATION(S),

ADDITIONALLY, RETTEW ASSOCIATES, INC. DOES NOT MAKE ANY

REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE

INFORMATION RECEIVED PURSUANT TO SAID REQUEST, AND AS REFLECTED ON

THIS/THESE DRAWING(S), IS CORRECT OR ACCURATE. INFORMATION REFLECTED

ON THIS/THESE DRAWING(S) IS SHOWN AS REQUIRED BY SAID ACT NO. 160 OF

2016, AND AS PROVIDED BY THE FACILITY OWNER PURSUANT TO SECTION 2,

CLAUSE (4) OF SAID ACT.

DATE:

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES THREE (3)

WORKING DAYS NOTICE FOR CONSTRCTION

PHASE AND TEN (10) WORKING DAYS IN

DESIGN STAGE - STOP CALL1-800-242-1776

IT IS THE CLIENT'S RESPONSIBILITY TO NOTIFY RETTEW NO LESS THAN 10 DAYS

AND NO MORE THAN 90 DAYS PRIOR TO THE CONSTRUCTION BEGIN DATE. THIS

NOTIFICATION WILL ALLOW US TO UPDATE THE PA811 ONE CALL TICKETS

ASSOCIATED WITH THIS PROJECT, WHICH IS A REQUIREMENT UNDER ACT 287.

20250232561

JANUARY 23, 2025

X

12FS

12FS

X X

X

12FS

CF

STANDARD E&S PLAN NOTES

1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN

ACCORDANCE WITH THE E&S PLAN. A COPY OF THE DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE

CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.

2. AT LEAST SEVEN DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT, A REPRESENTATIVE FROM THE PA DEP, AND A REPRESENTATIVE FROM THE USACOE TO AN ON-SITE

PRECONSTRUCTION MEETING.

3. AT LEAST THREE DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR

THE LOCATION OF EXISTING UNDERGROUND UTILITIES.

4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL

CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.

5. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.

6. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED BEFORE CLEARING AND

GRUBBING OPERATIONS BEGIN.

7. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR

FLATTER.

8. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT

PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION.

9. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT’S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE

BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.

10. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF

A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.

11. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN

THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.

12. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY ONTO ANY ROADS FROM THE PROJECT AREA WITHOUT UTILIZING A ROCK CONSTRUCTION ENTRANCES AS SHOWN ON THE PLAN DRAWINGS.

13. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED

WILL BE REQUIRED.

14. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY

OFFICIALS AT THE TIME OF INSPECTION.

15. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.

16. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN

DRAWINGS.

17. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES (6 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2

INCHES OF TOPSOIL.

18. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE

COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.

19. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.

20. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.

21. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO

FILLS.

22. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.

23. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE

STANDARDS OF THIS PLAN.

24. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN

ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.

25. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.

26. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR

THE DEPARTMENT.

27. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN

MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.

28. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG OR EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER UNDISTURBED VEGETATED AREAS.

29. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND MAKE SURE THE SITE(S) RECEIVING THE EXCESS HAS AN APPROVED AND FULLY IMPLEMENTED EROSION AND SEDIMENT CONTROL PLAN THAT MEETS THE CONDITIONS OF CHAPTER 102 AND/OR OTHER STATE OR FEDERAL REGULATIONS.

30. THE OPERATOR SHALL ENSURE THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND

COMPLETELY IMPLEMENTED.

31. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION

CONTROL.

32. IF UNDERGROUND STORAGE TANKS, CONTAMINATED SOILS, OR CONTAMINATED FILL MATERIALS ARE ENCOUNTERED, QUALIFIED PROFESSIONALS MUST BE CONSULTED TO ACCESS AND PROVIDE RECOMMENDATIONS.

QUALIFIED PROFESSIONALS MUST PROPERLY INVESTIGATE, HANDLE, REPORT, AND/OR MITIGATE, IF WARRANTED, SUCH ENCOUNTERED CONDITIONS, IN ACCORDANCE WITH INDUSTRY STANDARDS AND LOCAL, STATE, AND FEDERAL

REGULATIONS.

33. IF THE CONSTRUCTION ACCESS PATHS ARE SEVERELY DISTURBED, THOSE AREAS WILL BE SCARIFIED BEFORE THEY

ARE SEEDED AND MULCHED FOR FINAL STABILIZATION.

34. TEMPORARY STOCKPILE AREAS WILL BE RESTRICTED TO THE AREAS SHOWN ON THE PLAN. SOIL OR ROCK STOCKPILED IN THESE AREAS WILL BE PLACED HERE ONLY WHEN IT CAN BE USED FOR THAT WEEK'S WORK.

RECYCLING AND DISPOSAL METHODS

PROCEDURES, WHICH ENSURE THAT THE PROPER MEASURES FOR THE RECYCLING OR DISPOSAL OF MATERIALS ASSOCIATED WITH OR FROM THE PROJECT SITE, WILL BE UNDERTAKEN IN ACCORDANCE WITH DEPARTMENT REGULATIONS. INDIVIDUALS RESPONSIBLE FOR EARTH DISTURBANCE ACTIVITIES MUST ENSURE THAT PROPER MECHANISMS ARE IN PLACE TO CONTROL WASTE MATERIALS. CONSTRUCTION WASTES INCLUDE, BUT ARE NOT LIMITED TO, EXCESS SOIL MATERIALS, BUILDING MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC. THAT COULD ADVERSELY IMPACT WATER QUALITY. THE CONTRACTOR SHALL PLAN AND IMPLEMENT MEASURES FOR HOUSEKEEPING, MATERIALS MANAGEMENT, AND LITTER CONTROL DURING CONSTRUCTION. WHEREVER POSSIBLE, RECYCLING OF EXCESS MATERIALS IS PREFERRED, RATHER THAN DISPOSAL. DISPOSAL OF CONSTRUCTION WASTES SHALL BE IN ACCORDANCE

WITH ALL LOCAL, STATE AND FEDERAL GUIDELINES AND REGULATIONS.

CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE

1. IF THE SITE WILL HAVE EXCESS FILL THAT WILL NEED TO BE EXPORTED TO AN OFF SITE LOCATION, THE

RESPONSIBILITY OF CLEAN FILL DETERMINATION AND ENVIRONMENTAL DUE DILIGENCE RESTS ON THE APPLICANT. IF ALL CUT AND FILL MATERIALS WILL BE USED ON THE SITE, A CLEAN FILL DETERMINATION IS NOT REQUIRED BY THE OPERATOR UNLESS THERE IS A BELIEF THAT A SPILL OR RELEASE OF A REGULATED SUBSTANCE OCCURRED ON THE

SITE.

2. ALL FILL MATERIAL MUST BE USED IN ACCORDANCE WITH PA DEP'S POLICY "MANAGEMENT OF FILL" DOCUMENT

NUMBER 258-2182-773.

3. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT (NOT INCLUDING MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE), AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS

OTHERWISE AUTHORIZED.

4. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTIONS AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE.

5. FILL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH PA DEP'S MUNICIPAL OR RESIDENTIAL WASTE REGULATIONS BASED ON 25 PA CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS

APPLICABLE.

MAINTENANCE EROSION AND SEDIMENT CONTROL

1. ALL EROSION AND SEDIMENT CONTROL FACILITIES MUST BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT.

ALL FACILITIES THAT ARE DAMAGED, CLOGGED, OR CAN NO LONGER PERFORM AS DESIGNED, SHALL BE REPLACED.

REFER TO DETAILS ON THE PLANS FOR SPECIFIC MAINTENANCE METHODS FOR EACH SEDIMENT-TRAPPING DEVICE.

2. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN ONE OF THE FOLLOWING MANNERS:

2.A. IN VEGETATED AREAS WITHIN LIMIT OF DISTURBANCE AND OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS, OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED.

2.B. OR, PLACED IN TOPSOIL STOCKPILES.

3. ANY PERMANENT SEEDED AREAS THAT BECOME ERODED OR DISTURBED SHALL HAVE THE TOPSOIL REPLACED, THE GRASS RESOWN, AND THE MULCH REAPPLIED, OR, AT THE DISCRETION OF THE OWNER, SOD MAY BE INSTALLED.

4. THE PERMIT HOLDER SHALL BE RESPONSIBLE FOR MAINTENANCE OF EROSION AND SEDIMENT CONTROLS UNTIL THE SITE IS STABILIZED. PERMANENT STABILIZATION IS DEFINED, AS "A UNIFORM 70% VEGETATIVE COVER OF EROSION RESISTANT PERENNIAL SPECIES HAS BEEN ACHIEVED," OR THE DISTURBED AREA IS COVERED WITH AN ACCEPTABLE BMP, WHICH PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION. UNTIL SUCH TIME AS THIS STANDARD IS ACHIEVED, INTERIM STABILIZATION MEASURES AND TEMPORARY EROSION AND SEDIMENT CONTROL

BMPS THAT ARE USED TO TREAT PROJECT RUNOFF MAY NOT BE REMOVED.

THERMAL IMPACTS

NO ADDITIONAL THERMAL IMPACTS SHOULD RESULT FROM THIS PROJECT. THERMAL IMPACTS WILL BE

AVOIDED/MINIMIZED DURING CONSTRUCTION BY:

1. MAINTAINING VEGETATIVE COVER AND LIMITING THE DISTURBED AREA TO THE GREATEST EXTENT PRACTICABLE:

VEGETATION COOLS RUNOFF THROUGH THE PROCESS OF EVAPOTRANSPIRATION AND CANOPY COVER LIMITS GROUND SURFACE EXPOSURE TO DIRECT SUNLIGHT EFFECTIVELY CONTROLLING THERMAL POLLUTION.

2. SEEDING AND MULCHING IMMEDIATELY FOLLOWING CONSTRUCTION LIMITS BARE GROUND EXPOSURE REDUCING

THE RUNOFF TEMPERATURES.

CONSTRUCTION EQUIPMENT AND STREAM CHANNEL NOTES

1. EQUIPMENT WORK WILL BE COMPLETED FROM THE TOP OF THE STREAM BANK WHERE FEASIBLE. WORK

AROUND EXISTING TREES (ESPECIALLY MATURE, HEALTHY, NATIVE TREES) AS MUCH AS PRACTICAL. THE STREAM

BED WILL NOT BE USED AS A TRAVEL CORRIDOR.

2. WHEN WORK IS TO BE COMPLETED ON THE OPPOSITE BANK FROM ACCESS, ONE OF THE FOLLOWING MAY BE

DONE:

2.A. COMPLETE THE WORK FROM THE ACCESS SIDE OF THE STREAM AND REACH ACROSS THE STREAM TO THE

OPPOSITE BANK;

2.B. USE A PROPOSED STRUCTURE ON THE ACCESS SIDE OF THE BANK AS A PLATFORM TO COMPLETE THE

WORK.

2.C. UTILIZE TIMBER MATS ON THE STREAM BED FOR ACCESS.

ANY AREA DISTURBED ACCESSING THE STREAM WILL BE RETURNED TO ORIGINAL CONDITIONS.

3. EQUIPMENT WILL BE INSPECTED DAILY TO ENSURE THERE IS NO LEAKING OF LUBRICANTS, FUEL, HYDRAULIC FLUIDS, OR ANTIFREEZE. ANY MACHINE THAT DEVELOPS A LEAK WILL BE REMOVED FROM SERVICE UNTIL

REPAIRS ARE COMPLETED.

RECEIVING WATER CLASSIFICATION WATER QUALITY DESIGNATION

1. CONOWINGO CREEK

1.A. DESIGNATED USE: HIGH QUALITY-COLD WATER FISHES, MIGRATORY FISHES (HQ-CWF, MF)

1.B. EXISTING USE: NO SEPARATE CLASSIFICATION

1.C. NATURALLY REPRODUCING TROUT. NO IN-STREAM WORK FROM OCTOBER 1 TO DECEMBER 31.

PROJECT SITE LAND USES

PAST: AG FIELD AND FORESTED RIPARIAN BUFFER

PRESENT: AG FIELD AND FORESTED RIPARIAN BUFFER

PROPOSED: AG FIELD AND FORESTED RIPARIAN BUFFER

GEOLOGIC FORMATIONS

ACCORDING TO THE PA DCNR, THE PROJECT AREA IS UNDERLAIN BY THE OCTORARO FORMATION (Xo), PREVIOUSLY

CONSIDERED PART OF THE WISSAHICKON FORMATION.

THE OCTORARO FORMATION IS A PHYLLITE THAT CONTAINS SOME SCHIST, HORNBLENDE GNEISS, AND GRANITIZED MEMBERS. IT HAS QUARTZ-ALBITE-MUSCOVITE-CHLORITE ASSEMBLAGES. ITS THICKNESS IS UNKNOWN (BERG AND

OTHERS, 1980; KAUFFMAN, 1999).

· EASE OF EXCAVATION: MODERATELY EASY; DIFFICULT IN UNWEATHERED ROCK; MODERATE DRILLING RATE.

· CUT-SLOPE STABILITY: FAIR, IN PART DUE TO PARTIAL DISINTEGRATION WHEN EXPOSED TO MOISTURE FOR A

RELATIVELY SHORT TIME; DRAINAGE MAINTENANCE MAY BE REQUIRED.

SOILS LIMITATIONS AND RESOLUTIONS

THE USDA NRCS WEB SOIL SURVEY INDICATES THAT THE SOILS WITHIN THE LIMIT OF DISTURBANCE ARE COMPRISED OF

THE FOLLOWING:

· Cm COMUS SILT LOAM

· GbD GLENELG SILT LOAM, 15 TO 25 PERCENT SLOPES

THE FOLLOWING ADDRESSES POTENTIAL SOILS USE LIMITATIONS AND PROPOSED RESOLUTIONS:

1. CUTBANKS CAVE

1.A. LIMITED SOILS: COMUS AND GLENELG

1.B. RESOLUTIONS: THE SITE IMPROVEMENTS WILL REQUIRE BULK EXCAVATION. ADEQUATE SHORING IS TO BE

USED FOR ANY DEEP EXCAVATION.

2. CORROSIVE TO CONCRETE

2.A. LIMITED SOILS: COMUS AND GLENELG

2.B. RESOLUTIONS: NO CONCRETE IS PROPOSED AS PART OF THIS PROJECT.

3. EASILY ERODIBLE

3.A. LIMITED SOILS: COMUS AND GLENELG

3.B. RESOLUTIONS: CONTROL RUNOFF THROUGH IMPLEMENTATION OF E&SC BMPs BEFORE IT DEVELOPS INTO

AN EROSIVE FORCE AND USE LAND ACCORDING TO ITS CAPABILITY.

4. FLOODING

4.A. LIMITED SOILS: COMUS

4.B. RESOLUTIONS: AVOID CONSTRUCTION DURING FLOODING EVENTS, AND PERFORM CONSTRUCTION DURING

LOW FLOW CONDITIONS AS ABLE. IF NECESSARY, USE ADDITIONAL COFFERDAMS.

5. HYDRIC/HYDRIC INCLUSIONS

5.A. LIMITED SOILS: COMUS AND GLENELG

5.B. RESOLUTIONS: A WETLAND STUDY WAS PERFORMED, AND WETLANDS ARE TO BE AVOIDED FOR THIS

PROJECT.

6. LOW STRENGTH/LANDSLIDE PRONE

6.A. LIMITED SOILS: COMUS AND GLENELG

6.B. RESOLUTIONS: SOIL AMENDMENTS AND PROPER COMPACTION TECHNIQUES MAY BE NECESSARY DURING

CONSTRUCTION. DO NOT COMPACT SOILS WHEN SATURATED.

7. SLOW PERCOLATION

7.A. LIMITED SOILS: COMUS AND GLENELG

7.B. RESOLUTIONS: IF PONDING IS ENCOUNTERED DURING CONSTRUCTION, THE SEDIMENT-LADEN WATER SHALL

BE PUMPED TO AN APPROVED SEDIMENT-REMOVAL FACILITY SUCH AS A PUMPED WATER FILTER BAG AND

DISCHARGED AT A STABILIZED POINT OF DISCHARGE.

8. PIPING

8.A. LIMITED SOILS: COMUS AND GLENELG

8.B. RESOLUTIONS: POTENTIAL SOIL PIPING ALONG OUTSIDE WALLS OF INSTALLED PIPE IS NOT A CONCERN SINCE

PIPES/CULVERTS ARE NOT PROPOSED AS PART OF THIS PROJECT. SOIL PIPING ELSEWHERE IS NOT A CONCERN SINCE PROPOSED GRADING ALONG THE STREAMBANKS SHALL PROVIDE POSITIVE OVERLAND FLOW AND

DRAINAGE TOWARDS THE STREAM.

9. POOR SOURCE OF TOPSOIL

9.A. LIMITED SOILS: GLENELG

9.B. RESOLUTIONS: THIS SHOULD NOT BE A CONCERN SINCE THE PROJECT IS LOCATED WITHIN ALLUVIAL SOILS. IF

NEEDED, PROPER PREPARATION (RAKING, AMENDMENTS, ETC.) OF THE TOPSOIL WILL AID IN VEGETATION

ESTABLISHMENT. SEE ADDITIONAL GENERAL NOTES.

10. FROST ACTION

10.A. LIMITED SOILS: COMUS AND GLENELG

10.B. RESOLUTIONS: FROZEN FILL MATERIAL MUST NOT BE USED IN CONSTRUCTION. PLACE ASIDE AND ALLOW TO

THAW AND DRY OUT PRIOR TO USE. DO NOT PLACE FILL ON FROZEN GROUND. ONLY EXCAVATE DURING

FREEZING TEMPERATURES WHEN FILL CAN BE IMMEDIATELY PLACED AND COMPACTED.

11. WETNESS

11.A. LIMITED SOILS: GLENELG

11.B. RESOLUTIONS: USE WET TOLERANT VEGETATION WITHIN THESE AREAS AS APPLICABLE.

SCHEDULE OF MAINTENANCE OF EROSION & SEDIMENT CONTROLS

THE SOIL EROSION AND SEDIMENT CONTROLS UTILIZED IN THE DEVELOPMENT OF THIS PLAN SHALL BE MAINTAINED AND REPAIRED IN ORDER TO KEEP THEM IN EFFECTIVE CONDITION UNTIL PERMANENT STABILIZATION OCCURS. THE CONTRACTOR SHALL INSPECT AND PERFORM NEEDED MAINTENANCE AT A MINIMUM ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5" OF RAIN PER 24 HOUR PERIOD. IN ORDER TO ASSURE PROPER FUNCTION, MAINTENANCE OF THE CONTROLS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING

MAINTENANCE PROCEDURES FOR UTILIZED CONTROLS:

INSPECTIONS MUST BE BY A QUALIFIED PERSON TRAINED AND EXPERIENCED IN EROSION AND SEDIMENT CONTROL. A WRITTEN REPORT OF EACH INSPECTION SHALL BE KEPT AND DOCUMENTED IN AN INSPECTION LOG DEP FORM

3150-PM-BWEW0083 DATED 2/2012, TO BE MAINTAINED ON SITE AT ALL TIMES.

ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN-OUT, REPAIR, REPLACEMENT, RE-SEEDING, RE-MULCHING, AND RE-NETTING, MUST BE PERFORMED IMMEDIATELY.

MISCELLANEOUS ADJUSTMENTS AND CORRECTIONS SHALL BE MADE TO ANY EROSION CONTROL STRUCTURE AS DEEMED NECESSARY BY THE ENVIRONMENTAL INSPECTOR. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS

EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE NEEDED.

ROCK CONSTRUCTION ENTRANCE

1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT

ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED

IMMEDIATELY.

2. WHEELS ON ALL VEHICLES SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. IF WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO APPROVED SEDIMENT TRAPPING DEVICE. PRECAUTIONS MUST BE TAKEN TO PREVENT MUDDY WATER

FROM RUNNING INTO WATERWAYS OR STORM SEWERS.

FILTER SOCK

1. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING FILTER SOCKS.

2. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING ½ THE HEIGHT BETWEEN THE TOP OF THE FILTER SOCK

AND THE GROUND SURFACE.

3. REPAIR ANY RILLS OR GULLIES PROMPTLY.

4. RESEED OR REPLANT VEGETATION IF NECESSARY UNTIL THE SLOPE IS STABILIZED.

TOPSOILING

1. ADDITIONAL APPLICATIONS OR REPLACEMENT OF TOPSOIL IN GRADED AREAS SHOULD NOT BE NECESSARY.

HOWEVER IF LACK OF TOPSOIL IS NOTICED, THE CONTRACTOR SHALL INSTALL A 6" LIFT OF TOPSOIL TO PROMOTE VEGETATIVE GROWTH. THERE SHOULD BE AN EXCESS OF AVAILABLE TOPSOIL ON THIS PROJECT SITE.

2. TAKE CARE TO AVOID EXCESSIVE MIXING OF TOPSOIL INTO THE SUBSOIL.

3. PERMANENTLY STABILIZE THE SITE FOLLOWING APPROPRIATE PRACTICE STANDARDS AS QUICKLY AS PRACTICABLE.

4. PERIODICALLY INSPECT THE SITE UNTIL PERMANENT STABILIZATION IS ACHIEVED.

5. MAKE NECESSARY REPAIRS TO ERODED AREAS OR AREAS OF LIGHT VEGETATIVE COVER.

TEMPORARY SEEDING

1. AREAS THAT FAIL TO ESTABLISH A VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION SHOULD BE RE-SEEDED

AS SOON AS SUCH AREAS ARE IDENTIFIED.

PERMANENT SEEDING

1. EVEN WITH CAREFUL, WELL-PLANNED SEEDING OPERATIONS, FAILURES OCCUR. WHEN IT IS CLEAR THAT PLANTS

HAVE NOT GERMINATED ON AN AREA OR HAVE DIED, THESE AREAS MUST BE PREPARED AND RESEEDED IMMEDIATELY TO PREVENT EROSION DAMAGE. IT IS EXTREMELY IMPORTANT TO DETERMINE WHY GERMINATION DID NOT TAKE PLACE AND MAKE ANY NECESSARY CORRECTIVE ACTIONS. HEALTHY VEGETATION IS THE MOST EFFECTIVE EROSION CONTROL AVAILABLE. SOME HIGHLY ACIDIC SOILS (ESPECIALLY AROUND VARIOUS COAL SEAMS IN THE COALFIELDS) WILL RESIST THE BEST EFFORTS TO REVEGETATE THEM. IN THESE CASES, TOPSOILING WILL BE

THE ONLY WAY TO ESTABLISH VEGETATION.

MULCHING

1. ALL MULCHES AND SOIL COVERINGS SHOULD BE INSPECTED PERIODICALLY (PARTICULARLY AFTER RAINSTORMS AND

HIGH WINDS) TO CHECK FOR EROSION AND DISPLACEMENT. WHERE EROSION IS OBSERVED IN MULCHED AREAS, ADDITIONAL MULCH SHOULD BE APPLIED AND EROSION REPAIRED IF NECESSARY.

2. NETS AND MATS SHOULD BE INSPECTED AFTER RAINSTORMS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, REINSTALL NETTING OR MATTING AS NECESSARY AFTER REGRADING TO REPAIR DAMAGE TO THE SLOPE OR DITCH. INSPECTIONS SHOULD TAKE PLACE UP UNTIL GRASSES ARE FIRMLY ESTABLISHED OR THE AREA IS

REDISTURBED.

CONSTRUCTION SEQUENCE

GENERAL

1. CONSTRUCTION WILL PROCEED IN A TIMELY MANNER IN ORDER TO LIMIT THE POTENTIAL FOR ACCELERATED EROSION AND SEDIMENTATION.

THE SEQUENCE OF EARTHMOVING ACTIVITIES SHALL BE APPROXIMATED AS FOLLOWS.

2. CHANGES OR ALTERATIONS TO THIS CONSTRUCTION SEQUENCE MAY OCCUR DUE TO FIELD CONDITIONS, CONSTRUCTION SCHEDULING, SEASONAL CONDITIONS TO PREVENT ACCELERATED EROSION AND SEDIMENTATION OF THE PROJECT SITE.

3. AT LEAST TEN DAYS PRIOR TO WORK COMMENCING, CONTACT PA FISH & BOAT COMMISSION TO PROVIDE NOTIFICATION OF THE PROJECT.

4. AT LEAST SEVEN DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT, A REPRESENTATIVE FROM THE PA DEP, AND A REPRESENTATIVE FROM THE

USACE TO AN ON-SITE PRECONSTRUCTION MEETING.

5. AT LEAST THREE DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.

6. CONSTRUCTION SHALL TAKE PLACE DURING PERIODS WHEN THE STREAM IS AT LOW FLOW.

SITE IMPROVEMENTS

1. ESTABLISH THE LIMIT OF DISTURBANCE BY VISUAL MEANS (TEMPORARY STAKES, FLAGGING, PAINT MARKINGS, ETC.).

2. INSTALL ROCK CONSTRUCTION ENTRANCE. ESTABLISH TEMPORARY ACCESSES AND STOCKPILE AREA, AND INSTALL FILTER SOCK ALONG DOWNSLOPE EDGE OF STOCKPILES. INSTALL CONSTRUCTION FENCE ADJACENT TO WETLAND WHERE INDICATED.

3. MAKE EVERY EFFORT TO WORK AROUND EXISTING TREES (ESPECIALLY MATURE, HEALTHY, NATIVE TREES) AS MUCH AS PRACTICAL

THROUGHOUT DURATION OF PROJECT.

4. BEGINNING UPSTREAM AND PROCEEDING DOWNSTREAM, INSTALL IN-STREAM STRUCTURES AND COMPLETE GRADING. PER PA FISH AND BOAT COMMISSION DIRECTION, THIS IS BEST ACCOMPLISHED WHEN CONSTRUCTED DIRECTLY IN THE STREAM FLOW.

5. UPON REACHING FINAL GRADE, IMMEDIATELY SEED AND STABILIZE AROUND EACH STRUCTURE, STREAMBANKS, AND ANY AREA NO LONGER

NEEDED FOR ACCESS THROUGHOUT ALL PHASES OF THE PROJECT.

6. RESTORE ANY TEMPORARY ACCESSES AS EACH IS NO LONGER NECESSARY. RESTORE TO PRE-CONSTRUCTION CONDITIONS, INCLUDING DECOMPACTING AREAS BY SCARIFYING, AND IMMEDIATELY SEED AND STABILIZE ADJACENT AREAS PER PLAN SPECIFICATIONS.

7. CONTINUE TO PROCEED DOWNSTREAM, INSTALL IN-STREAM STRUCTURES, AND COMPLETE GRADING. IMMEDIATELY SEED AND STABILIZE

AROUND EACH STRUCTURE AND STREAMBANKS.

8. RESTORE ANY TEMPORARY ACCESSES AS EACH IS NO LONGER NECESSARY. RESTORE TO PRE-CONSTRUCTION CONDITIONS, INCLUDING DECOMPACTING AREAS BY SCARIFYING, AND IMMEDIATELY SEED AND STABILIZE ADJACENT AREAS PER PLAN SPECIFICATIONS.

9. UPON ALL PROJECT AREA COMPLETIONS, REMOVE ROCK CONSTRUCTION ENTRANCE AND TEMPORARY STOCKPILE AREA. PROPERLY DISPOSE ANY REMAINING MATERIALS FROM STAGING AREAS. RESTORE TO PRE-CONSTRUCTION CONDITIONS, INCLUDING DECOMPACTING AREAS BY SCARIFYING, AND IMMEDIATELY SEED AND STABILIZE PER PLAN SPECIFICATIONS. UPON REACHING 70% VEGETATIVE COVER, REMOVE FILTER

SOCK OR SPREAD CONTENTS AS A SOIL ADDITIVE.

PERMANENT SEEDING SPECIFICATIONS

A. SEEDING FOR STREAMBANKS AND RIPARIAN AREAS

1. RIPARIAN BUFFER MIX (ERNMX-178)

20.0% ELYMUS VIRGINICUS, MADISON-NY ECOTYPE VIRGINIA WILDRYE, MADISON-NY ECOTYPE

18.0% PANICUM CLANDESTINUM, TIOGA DEERTONGUE, TIOGA

17.9% ANDROPOGON GERARDII, 'SOUTHLOW'-MI ECOTYPE BIG BLUESTEM, ‘SOUTHLOW’-MI ECOTYPE

17.9% SORGHASTRUM NUTANS, NY4 ECOTYPE INDIANGRASS, NY4 ECOTYPE

9.0% PANICUM VIRGATUM, 'SHELTER' SWITCHGRASS, ‘SHELTER’

3.5% VERBENA HASTATA, PA ECOTYPE BLUE VERVAIN, PA ECOTYPE

3.0% RUDBECKIA HIRTA BLACKEYED SUSAN

2.4% ASCLEPIAS INCARNATA, PA ECOTYPE SWAMP MILKWEED, PA ECOTYPE

2.4% ASTER PILOSUS, PA ECOTYPE HEATH ASTER, PA ECOTYPE

2.0% HELIOPSIS HELIANTHOIDES, PA ECOTYPE OXEYE SUNFLOWER, PA ECOTYPE

1.5% ZIZIA AUREA, PA ECOTYPE GOLDEN ALEXANDERS, PA ECOTYPE

0.8% EUPATORIUM PERFOLIATUM, PA ECOTYPE BONESET, PA ECOTYPE

0.8% SOLIDAGO RUGOSA, PA ECOTYPE WRINKLELEAF GOLDENROD, PA ECOTYPE

0.5% MONARDA FISTULOSA, FORT INDIANTOWN GAP-PA ECOTYPE WILD BERGAMOT, FORT INDIANTOWN GAP-PA ECOTYPE

0.3% EUPATORIUM FISTULOSUM, PA ECOTYPE JOE PYE WEED, PA ECOTYPE

2. SEED THIS MIX AT A RATE OF 20 LBS PER ACRE.

3. SEED THE FOLLOWING COVER CROP AT 30 LB PER ACRE:

3.A. DRY SITES - GRAIN OATS, JAN 1-AUG 1; OR, GRAIN RYE, AUG 1-JAN 1;

3.B. MOIST SITES - GRAIN RYE YEAR-ROUND.

B. SEEDING FOR DISTURBED AGRICULTURAL AREAS

1. MULTI-PURPOSE MIX (ERNMX-121)

25.0% FESTUCA ELATIOR X LOLIUM PERENNE, DUO FESTULOLIUM, ‘DUO’

20.0% DACTYLIS GLOMERATA, POTOMAC ORCHARDGRASS, POTOMAC

20.0% DACTYLIS GLOMERATA, 'TEKAPO' ORCHARDGRASS, ‘TEKAPO’

20.0% LOLIUM PERENNE, 'TETRA SWEET', TETRAPLOID PERENNIAL RYEGRASS, ‘TETRA SWEET’, TETRAPLOID

10.0% LOLIUM MULTIFLORUM ANNUAL RYEGRASS

5.0% TRIFOLIUM PRATENSE, MAMMOTH RED CLOVER, MAMMOTH

2. SEED THIS MIX AT A RATE OF 35-40 LBS PER ACRE.

C. VEGETATIVE STABILIZATION WILL BE PERIODICALLY INSPECTED FOR PROPER GROWTH. ANY AREAS NOT RESPONDING WILL BE PROMPTLY RESEEDED. AREAS, WHICH SHOW SIGNS OF EROSION, PRIOR TO STABILIZATION, SHALL BE GRADED, RESEEDED, AND RE-MULCHED AS SOON AS

POSSIBLE.

D. AVAILABILITY

1. SEED MIXES ARE AVAILABLE FROM ERNST CONSERVATION SEEDS, 9006 MERCER PIKE, MEADVILLE, PA 16335, PHONE: (800) 873-3321, WEBSITE: HTTP://WWW.ERNSTSEED.COM. AN EQUIVALENT SEED MIX CAN BE USED AS APPROVED BY THE DESIGNER.

SCHEDULE OF MAINTENANCE OF EROSION & SEDIMENT CONTROLS (CONTINUED)

ROLLED EROSION CONTROL PRODUCTS (RECPs) (SLOPE & CHANNEL MATTING)

1. BASIC MONITORING SHOULD CONSIST OF VISUAL INSPECTIONS TO DETERMINE MAT INTEGRITY AND ATTACHMENT PERFORMANCE. RILL

DEVELOPMENT BENEATH THE MAT OR EDGE LIFTING IS EVIDENCE OF INADEQUATE ATTACHMENT. UNTIL THE VEGETATION IS FULLY ESTABLISHED, THE GROUND SURFACE SHOULD BE INSPECTED FOR SIGNS OF RILL OR GULLY EROSION BELOW THE MATTING.

2. ANY SIGNS OF EROSION, TEARING OF THE MATTING, OR AREAS WHERE THE MATTING IS NO LONGER ANCHORED FIRMLY TO THE GROUND SHOULD BE REPAIRED. REPAIR ANY DAMAGED AREAS IMMEDIATELY BY RESTORING SOIL TO FINISHED GRADE, RE-APPLYING SOIL AMENDMENTS AND SEED, AND REPLACING THE RECPs. ADDITIONAL STAKING AND TRENCHING CAN BE EMPLOYED TO CORRECT DEFECTS.

RECENTLY PLACED MATS MAY BE REPLACED, BUT ONCE VEGETATION BECOMES ESTABLISHED, REPLACEMENT IS NOT A REASONABLE OPTION UNLESS LARGE FAILURES HAVE OCCURRED. IF THE RECPs ARE VEGETATED, THE VEGETATION SHOULD BE WATERED AS NEEDED. GETTING

GRASS ESTABLISHED AS QUICKLY AS POSSIBLE IS VERY IMPORTANT.

RIPRAP

1. INSPECT AFTER HIGH FLOWS FOR EVIDENCE OF SCOUR BENEATH THE RIPRAP OR FOR DISLODGED STONES.

2. IF A SIGNIFICANT NUMBER OF STONES HAVE BEEN DISLODGED IT WILL BE NECESSARY TO RECALCULATE STONE SIZE AND REPLACE THE

EXISTING STONE WITH PROPERLY SIZED STONE.

3. ANY REPAIRS MUST BE MADE IMMEDIATELY.

DEWATERING BAG

1. THE FILTERING DEVICES MUST BE INSPECTED FREQUENTLY DURING PUMPING OPERATIONS AND REPAIRED OR REPLACED ONCE THE SEDIMENT

BUILD-UP PREVENTS THE STRUCTURE FROM FUNCTIONING AS DESIGNED.

2. THE ACCUMULATED SEDIMENT THAT IS REMOVED FROM A DEWATERING DEVICE MUST BE SPREAD ON-SITE AND STABILIZED OR DISPOSED OF

AT AN APPROVED DISPOSAL SITE AS PER APPROVED PLAN.

TIMBER MATS

1. TIMBER MATS SHALL BE INSPECTED DAILY AND AFTER EACH RUNOFF EVENT.

2. TIMBER MATS SHALL BE REPLACED OR REPAIRED IF BROKEN. GEOTEXTILE SHALL BE REPLACED OR REPAIRED IF TORN.

3. ANY ACCUMULATED SEDIMENT FROM THE TIMBER MATS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IN AN UPLAND

AREA.

TEMPORARY SEEDING APPLICATION RATE

PERMANENT SEEDING APPLICATION RATE

NOTE: A COMPOST BLANKET WHICH MEETS THE STANDARDS OF CHAPTER 11 OF THE PADEP E & S MANUAL MAY BE

SUBSTITUTED FOR THE SOIL AMENDMENTS SHOWN IN THE TABLE ABOVE.

SOIL AMENDMENT PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

AGRICULTURAL LIME

10-20-20 FERTILIZER

AGRICULTURAL LIME

10-10-10 FERTILIZER

6 TONS

1,000 LBS.

1 TON

500 LBS.

240 LBS.

25 LBS.

40 LBS.

12.5 LBS.

2,480 LBS.

210 LBS.

410 LBS.

100 LBS.

OR AS PER SOIL TEST, MAY

NOT BE REQUIRED IN

AGRICULTURAL FIELDS

OR AS PER SOIL TEST, MAY

NOT BE REQUIRED IN

AGRICULTURAL FIELDS

TYPICALLY NOT REQUIRED

FOR TOP SOIL

TYPICALLY NOT REQUIRED

FOR TOP SOIL

SOIL AMENDMENT PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

SOIL AMENDMENT APPLICATION RATE EQUIVALENTS

NOTE:

RETTEW DOES NOT RECOMMEND SOIL AMENDMENTS FOR THIS STREAM

RESTORATION PROJECT DUE TO PROXIMITY TO STREAM AND ALLUVIAL SOILS.

HOWEVER IF STABILIZATION DOES NOT OCCUR IN A TIMELY MANNER, PLEASE

CONDUCT SOIL TESTING, AND FOLLOW THE BELOW RECOMMENDATIONS FOR

AMENDMENTS.

TEMPORARY SEEDING SPECIFICATIONS

APPLICATION RATE (MIN.)

MULCH TYPE PER ACRE PER 1,000 S.F. PER 1,000 S.Y. NOTES

STRAW

HAY

3 TONS

3 TONS

140 LBS.

140 LBS.

1,240 LBS.

1,240 LBS.

EITHER WHEAT OR OAT

STRAW, FREE OF WEEDS, NOT

CHOPPED OR FINELY BROKEN

TIMOTHY, MIXED CLOVER

AND TIMOTHY OR OTHER

NATIVE FORAGE GRASSES

MULCH APPLICATION RATES

WOOD CHIPS

HYDROMULCH

4 - 6 TONS

1 TON

185 - 275 LBS.

47 LBS.

1,650 - 2,500 LBS.

415 LBS.

MAY PREVENT

GERMINATION OF

GRASSES AND LEGUMES

SHOULD NOT BE USED ON

SLOPES STEEPER THAN 5%

PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON NONCROPLAND"

1. PLS IS THE PRODUCT OF THE PERCENTAGE OF PURE SEED TIMES PERCENTAGE GERMINATIONS DIVIDED BY 100. FOR EXAMPLE, TO SECURE THE ACTUAL PLANTING RATE FOR SWITCHGRASS, DIVIDE 12 POUNDS PLS SHOWN ON THE SEED TAG. THUS, IF THE PLS CONTENT OF A GIVEN SEED LOT IS 35%, DIVIDE 12 PLS BY 0.35 TO OBTAIN 34.3 POUNDS OF SEED REQUIRED TO PLANT ONE ACRE. ALL MIXTURES IN THIS TABLE ARE SHOWN IN TERMS OF PLS.

2. IF HIGH-QUALITY SEED IS USED, FOR MOST SITES SEED SPRING OATS AT A RATE OF 2 BUSHELS PER ACRE, WINTER WHEAT AT 1.5 BUSHELS PER ACRE, AND WINTER RYE AT 1 BUSHEL PER ACRE. IF GERMINATION IS BELOW 90%, INCREASE THESE SUGGESTED SEEDING RATES BY 0.5 BUSHEL PER ACRE.

SPRING OATS (SPRING), OR

WINTER WHEAT (FALL), OR

WINTER RYE (FALL)

64 96

MOST SITES ADVERSE SITES

SEEDING RATE - PURE LIVE SEED 1

SPECIES

DEP RECOMMENDED TEMPORARY SEED MIXTURE TO BE UTILIZED

MIXTURE

NUMBER

Sheets and Views
047642002-RIVR-PLAN-SITE-1-01
047642002-RIVR-PLAN-SITE-1-02
047642002-RIVR-PLAN-SITE-1-03
047642002-RIVR-PLAN-SITE-1-04
047642002-RIVR-PLAN-SITE-1-05
047642002-RIVR-PLAN-SITE-1-06
047642002-RIVR-PLAN-SITE-1-07