7-RFP 26-001 Specification Property Yes, No, Difference.docx

DOCX document 29 KB Posted

Attached to
Property and Casualty Insurance
Solicitation number
RFP #26-001
Issued by
Upton County, Texas

About this file

This is a specifications attachment for a property and casualty insurance proposal issued by the Laredo Independent School District in Texas. The document outlines comprehensive insurance coverage requirements for the period of March 3, 2026 to March 3, 2027. The specifications detail extensive property insurance coverage including blanket building and personal property protection with a total limit of $771,093,158, computer hardware and software coverage of $2,500,000, and additional per-occurrence limits for various categories such as flood coverage ($25,000,000 annual aggregate), earth movement ($10,000,000 annual aggregate), business interruption ($5,000,000), and pollution coverage ($2,500,000). The property coverage includes replacement cost valuation, blanket coverage for real and personal property, wind-driven rain inclusion, and flood coverage for scheduled locations.

The specifications also establish specific deductibles ranging from $5,000 to $100,000 depending on the peril type, with separate provisions for flood coverage in Special Flood Hazard Areas and named windstorm coverage. Additionally, the document includes boiler and machinery insurance specifications with a comprehensive limit of $100,000,000 including production machinery, expediting expenses of $1,000,000, and extra expense coverage of $1,000,000. Boiler and machinery deductibles are set at $25,000 for combined direct coverages with 24-hour deductibles for extra expense and off-premises service interruption. The specifications require coverage for accidental breakdown of heating systems, pressure vessels, electrical equipment, air conditioning and refrigeration equipment, and include newly acquired location coverage with a 180-day period for errors in description.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS PROPERTY

ATTACHMENT: March 3, 2026 to March 3, 2027 LIMIT:

Yes
No
Differences – If Any
$771,093,158
Blanket Building, Personal Property
(Included above)
Blanket Computer Hardware, Software and Media
$2,500,000
Extra Expense
(Included above)
Musical Instruments
(Included above)
Electronic Data Processing Equipment and Data Processing Data and Media

DEDUCTIBLES:

$100,000
All Other Perils Per Occurrence, except as follows:
$5,000
Property in Transit, Contractors Equipment, Musical Instruments, Per Occurrence

(1) $100,000

(2) Excess Maximum NFIP limits

Flood – per Occurrence Except as Follows:

Flood SFHA (Zones Prefixes A or V) – per Occurrence

$100,000
Earth Movement – Per Occurrence

(1) 1% of TIV

(2)$100,000
Named Windstorm and Hail – Per Occurrence Subject to a Minimum of $100,000 Per Occurrence, Maximum $2,500,000 Per Occurrence

All Other Windstorm, Per Occurrence

$25,000
Boiler and Machinery, Utility Services – Direct Damage

VALUATION:

Yes
No
Differences – If Any

Replacement Cost

ADDITIONAL PER OCCURRENCE LIMITS OF COVERAGE:

Limit:

$25,000,000
Flood – Annual Aggregate
$10,000,000
Earth Movement – Annual Aggregate
$2,500,000
Extra Expense
Included
Named Storm
$5,000,000
Debris Removal
$500,000
Account Receivables
$5,000,000
Business Interruption
Included
$5,000,000
$5,000,000
Ordinance or Law:

Coverage A Coverage B Coverage C

$5,000,000
Errors Omissions Per Occurrence
$500,000
Limited Pollution Coverage / Pollutant Cleanup and Removal
$2,500,000
Loss Adjustment Expense and/or Professional Fees Per Occurrence
$100,000
Mold/Fungus Resultant Damage Only Per Occurrence
$5,000,000
Newly Construction/Acquired Property
$500,000
Outdoor Property (including but not limited to Plants, Trees, Shrubs, Fences & Signs)
$2,500,000
Property in the Course of Construction Including Soft Costs Per Occurrence
$5,000,000
Per Occurrence for Service Off Premises Power Interruption. This coverage INCLUDES loss or damage resulting from Insured physical loss or damage to Transmission and Distribution Lines. Insured physical loss or damage must occur within one (1) statute mile from the Insured’s premises in order for coverage to apply.
$5,000,000
Valuable Papers
$500,000
Property in Transit

TERMS and CONDITIONS:

Yes
No
Differences – If Any

Replacement Cost

Blanket Real, Contents, and Extra Expense

Blanket Electronic Hardware, Software and Media and Extra Expense

Unintentional Errors and Omissions

Building Ordinance Regulation or Law – Increased Cost of Construction

Amended Notice of Cancellation to 90 Days, Nonpayment Remains 10 Days

Revised Notice of Claim Requirement (Knowledge of Occurrence)

Flood Coverage for scheduled locations

Wind Driven Rain included

Spoilage Endorsement

Utility Services – Direct Damage (Formerly called Off Premises Power Failure)

Pollutant Clean Up and Removal Additional Aggregate Limit of Insurance

Windstorm Included

Terrorism Included

Flood Zone determination in effect at the inception date of the policy will apply throughout the entire policy term. If a location does not have a flood zone at the inception date, the flood zone will be determined at time of loss.

Exposure Basis: Please Refer to the Property Schedule

SPECIFICATIONS BOILER and MACHINERY

ATTACHMENT: March 3, 2026 to March 3, 2027 LIMITS:

Yes
No
Differences – If Any
$100,000,000
Comprehensive Including Production Machinery
$1,000,000
Expediting Expenses
$100,000
Hazardous Substance
$100,000
Ammonia Contamination
$100,000
Water Damage
$1,000,000
Extra Expense

DEDUCTIBLES:

Yes
No
Differences – If Any
$25,000
Combined All Direct Coverages
24 Hours
Extra Expense
24 Hours
Off Premises Service Interruption

TERMS and CONDITIONS:

Yes
No
Differences – If Any

Comprehensive Equipment Coverage Including Production Machines

Coverage Includes Accidental Breakdown of Heating or Process Boilers, Pressure Vessels, Electrical Equipment, Air Conditioning and Refrigeration Equipment

Perishable Goods/Spoilage

Hazardous Substances

Newly Acquired Locations: 180 Days

Errors in Description

Off Premises Property Damage

Extra Expense – Included

Service Interruption – Included (BI/EE)

Demolition

Ordinance or Law

File details come from the government source that posted it. Updated .