7-Project Manual Myerstown Borough Main Interceptor Lining FINAL.pdf
PDF 4 MB Posted
- Attached to
- Walnut Alley Drainage Improvements Project
- Solicitation number
- Not on record
- Issued by
- Lehigh County, Pennsylvania
About this file
Main Interceptor Lining Project - Myerstown Borough
This is a project manual for the Main Interceptor Lining Project in Myerstown Borough, Lebanon County, Pennsylvania, prepared by RETTEW Associates, Inc. The project involves the lining of approximately 2,269 linear feet of sanitary sewer pipe using cured-in-place pipe (CIPP) technology with UV light curing. The base bid encompasses work from manhole (MH) 249 to MH 259, including pre- and post-lining closed-circuit television (CCTV) inspection of 991 linear feet of 21-inch diameter pipe and 1,278 linear feet of 18-inch diameter pipe, with associated mobilization and demobilization, and traffic control. Alternate Bid No. 1 includes additional sections with varying pipe diameters (8-inch and 18-inch) at other locations throughout the borough. Electronic bids were due Wednesday, July 8, 2026, at 2:00 PM through the PennBID portal, with bid security required at 10 percent of the total bid amount issued by a Pennsylvania-licensed surety. Questions submitted online through PennBID were due by 12:00 PM on Monday, July 6, 2026. The successful contractor must complete all work by November 2, 2026, with liquidated damages assessed at $250 per calendar day for delays beyond this deadline. The contractor is required to provide both performance and payment bonds equal to 100 percent of the contract price and maintain emergency response capabilities during non-working hours.
The project is financed in part by a grant from the Commonwealth of Pennsylvania's Commonwealth Financing Authority and is subject to prevailing wage requirements under the Pennsylvania Prevailing Wage Act, OSHA compliance, the Pennsylvania Public Works Employment Verification Act requiring E-Verify participation, and non-discrimination and non-collusion attestations. The contractor must comply with all Commonwealth Financing Authority contract requirements and provide weekly wage certifications and final wage certifications to the owner. General liability insurance with minimum coverages of $1,000,000 general aggregate and $500,000 per occurrence is required, along with automobile liability and contractual liability insurance, with the owner and Commonwealth Financing Authority named as additional insureds. The contractor assumes full responsibility for project safety, utility coordination, traffic control in accordance with PennDOT Publication 213 and MUTCD standards, and all defects occurring within one year of application. No overnight work is permitted, and work hours are restricted between 6:00 PM and 7:00 AM Monday through Saturday, with no Sunday work allowed unless previously authorized in writing.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers / Environmental Consultants / Surveyors / Landscape Architects / Safety Consultants
We answer to you.
CONTRACT DOCUMENTS
FOR
MAIN INTERCEPTOR LINING
IN
MYERSTOWN BOROUGH
LEBANON COUNTY
PENNSYLVANIA
June 2026
Project No. 0858006782
Prepared by:
RETTEW Associates, Inc.
5031 Richard Lane, Suite 111
Mechanicsburg, PA 17055
(800) 738-8395
TABLE OF CONTENTS
ITEM PAGE
INVITATION TO BIDDERS 1
SECTION 01100 – SUMMARY OF WORK 1-2
MS-944 PROPOSAL AND CONTRACT 1-2
ATTACHMENT NO. 1 1
ATTACHMENT NO.1A – SPECIAL PROVISIONS TO CONTRACT 1
BID BOND 1-2
WORKMEN’S COMPENSATION AFFIDAVIT 1
ANTI-COLLUSION AFFIDAVIT 1
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM 1
NON-DISCRIMINATION SEXUAL HARASSMENT CONSENT 1-2
NON-DISCRIMINATION AFFIDAVIT 1-2
PERFORMANCE BOND 1
PAYMENT BOND 1
NOTICE OF AWARD 1
NOTICE TO PROCEED 1
APPLICATION FOR PAYMENT 1-3
INSURANCE REQUIREMENTS 1
SPECIAL PROVISIONS 1
TECHNICAL SPECIFICATIONS
SECTION 01015 - GENERAL INSTRUCTIONS
SECTION 026510 – TELEVISION INSPECTION OF PIPE
SECTION 330125 – FIBERGLASS COMPOSITE CIPP CURE WITH UV LIGHT
CFA FUNDING DOCUMENTS
SMALL WATER AND SEWER GRANT AGREEMENT
SUPPORTING DOCUMENTS
SANITARY SEWER LOCATION MAP
PREVAILING WAGE RATES
INVITATION TO BID
OWNER: Myerstown Borough 101 South Railroad Street Myerstown, PA 17067
ENGINEER: RETTEW Associates, Inc.
5031 Richard Lane, Suite 111
800-738-8395
Myerstown Borough will receive bids for the Main Interceptor Lining Project. Bids may be submitted and updated online until Wednesday, July 8, 2026, 2:00 PM. At that time bids will be made available online.
All documents and solicitation details are available any time at https://pennbid.bonfirehub.com.
The work will include, but not necessarily be limited to, lining approximately 2,269 LF of sanitary sewer pipe within the borough.
A certified check or bid bond for the amount of 10 percent of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania.
Only those questions submitted online via PennBID shall be considered. Questions received after 12:00 PM, Monday, July 6, 2026, regarding the project will not be acknowledged.
This Contract is subject to the following: the Pennsylvania Prevailing Wage Act conditions; the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, also known as the Underground Utility Line Protection Law, Act 287 of 1974, as amended; the Pennsylvania Human Relations Act 222 Condition; requirement of a noncollusion affidavit; the non-discrimination in Employment/Contract Compliance Regulations Conditions; and the Public Works Employment Verification Act.
Myerstown Borough Council reserves the right to accept or reject any or all Bids.
Michael McKenna Borough Manager
Myerstown Borough/Main Interceptor Lining 06/2026
SUMMARY OF WORK 01100 - 1
RETTEW Project No.: 0858006782
SECTION 01100 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of this Contract apply to this section.
1.2 PROJECT DESCRIPTION
A. Project Identification: Project consists of, but not necessarily be limited to, lining of approximately 2,269 linear feet of sanitary sewer.
1. Project location:
Various locations as shown on the attached location map.
Base Bid:
MH 249 to MH 259
Alternate Bid No. 1:
MH-183 to MH-182
MH-236 to MH-193 MH-236 to MH-134 MH-233 to MH-232 MH-112 to MH-111 MH 247 to MH 309
2. OWNER: Myerstown Borough, 101 South Railroad Street, Myerstown, PA, 17067.
B. ENGINEER Identification: The Contract Documents were prepared for Project by:
RETTEW Associates, Inc., 5031 Richard Ln, Ste 111, Mechanicsburg, PA 17055
C. This project will consist of a contract for lining approximately 2,269 LF of sanitary sewer pipe, and associated work.
The contract shall include furnishing all labor, equipment, material, and appurtenances to complete all work in accordance with the Contract Documents. The work will include, but not necessarily be limited to, the following, as identically numbered in the UNIT PRICE
SCHEDULE:
1. Mobilization and Demobilization (1 LS)
2. Traffic Control (1 LS) Base Bid:
3. Pre-lining CCTV - 21" Dia. (991 LF)
4. Pre-lining CCTV - 18" Dia. (1,278 LF)
SUMMARY OF WORK 01100 - 2
RETTEW Project No.: 0858006782
5. Post-lining CCTV - 21" Dia. (991 LF)
6. Post-lining CCTV - 18" Dia. (1,278 LF)
7. Cured in place lining - 21" Dia., complete in place (991 LF)
8. Cured in place lining - 18" Dia., complete in place (1,278 LF) Alternate Bid No. 1:
101. Pre-lining CCTV - 8" Dia. (529 LF)
102. Pre-lining CCTV - 18" Dia. (66 LF)
103. Post-lining CCTV - 8" Dia. (529 LF)
104. Post-lining CCTV - 18" Dia. (66 LF)
105. Cured in place lining - 8" Dia., complete in place (529 LF)
106. Cured in place lining - 18" Dia., complete in place (66 LF)
1.3 CONTRACTS
A. Project will be constructed under a general construction contract.
1.4 MISCELLANEOUS PROVISIONS
A. Unless otherwise noted, all construction shall conform to Pennsylvania Department of Transportation (PennDOT) Publication 408, latest revision.
B. Traffic Control shall be in accordance with PennDOT Publication 213 and the MUTCD.
C. Contractor responsible for notification to all property owners.
D. A Pre-Construction meeting will be held prior to the start of any work between the Contractor, Owner, and Engineer.
E. The Contractor shall notify the Owner and the Engineer five (5) days prior to start of work.
F. Bids shall remain open for a period of 60 days from the date of Bid opening. Bids may not be withdrawn during this period. All Bidders must bid on all items listed on the Bid Form and on each bidding alternative. The successful Bidder shall be required to furnish performance and payment bonds in the amount of 100 percent of the Contract Price.
G. In addition to completing the online bid form, electronic files containing the required Bid Documents must be uploaded to the PennBID website. It is the Contractor’s responsibility to verify that the bid form data has been entered properly and the entire document with all the required pages has been uploaded properly. Bids without the required Bid Documents may be rejected as incomplete. These documents can be found in the Contract Documents and in the folder “Documents to be Submitted Electronically with Bid.” These must include:
1. Anti-Collusion Affidavit
2. Electronic Copy of Bid Security/Bid Bond
3. Proposal & Contract
4. Attachment 1A Special Provisions
5. Worker’s Compensation Affidavit
6. Public Works Employment Verification Form
SUMMARY OF WORK 01100 - 3
RETTEW Project No.: 0858006782
H. Regulatory and Funding Agency Requirements:
1. This project is financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority.
2. The Commonwealth Financing Authority contract requirements (Article V – Compliance with Applicable Statutes and Regulations) are attached and incorporated herein.
a. Successful bidder will be required to provide written certification of compliance with the State Contractor Responsibility Program.
I. Contractor responsible for providing notice to residents/businesses through use of a door hanger at least three (3) days prior to the start of work. Notice shall be provided to the block impacted by the proposed construction, both sides of the street.
PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)
PART 4 - MEASUREMENT AND PAYMENT (Not used)
END OF SECTION 01100
MS-944 (7-09)
PROPOSAL & CONTRACT
(WHEN EXECUTED)
Instructions on Page 4
(THIS PROPOSAL INCLUDES
INSTRUCTIONS TO BIDDERS)
A. DEPOSIT OF PROPOSALS.
All electronic Bid proposals shall be submitted through PennBid for Letting of July 8, 2026.
DATE
Electronic Proposals will be received on or before 2:00 PM on the above Letting Date.
TIME
Bids will be made available at approximately 2:00 PM, on the above Letting Date.
TIME
Myerstown Borough
MUNICIPALITY (NAME & TYPE)
Michael McKenna
MANAGER
101 South Railroad Street
Myerstown, PA 17067
ADDRESS
PROPOSALS MUST BE SUBMITTED
ELECTRONICALLY VIA PENNBID
1. The contractor proposes to furnish and deliver all materials (including Form CS-4171, CERTIFICATE OF COMPLIANCE) and/or TR-465 DAILY BITUMINOUS MIXTURE CERTIFICATION) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and specifications on file at Myerstown Borough as well as the supplements and special requirements contained herein and/or attached hereto and current PennDOT Specifications (Publication 408), except (a) bidders need not be prequalified by PennDOT (Sec. 102.01), and (b) Volumetric testing of bituminous paving materials is not required (Sec.409).
2. If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will complete all work within See Attachment 1A calendar days. If all work is not completed on time, liquidated damages will be assessed at the rate as specified in the Special Provisions to Contract MS-944.
3. Accompanying this proposal is a certified check or bid bond in the amount of 10% of the Bid Amount made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirements of the proposal.
B. PROPOSAL OF :
NAME / ADDRESS OF CONTRACTOR
CONTRACTOR’S CERTIFICATION
It is hereby certified as follows:
1. The only person interested in this proposal as principal(s) is (are):
2. None of the above persons are employees of the municipality.
3. This proposal is made without collusion with any other person, firm or corporation.
4. All plans and specifications referred to above and the site of the work have been examined by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit price listed on the Schedule of Prices (Attachment 1).
5. The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
6. The contractor will provide the municipality with a performance bond, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions thereof, and a payment bond conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work.
7. Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations, and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1-167.11, which is incorporated herein by reference.
CONTRACTOR
BY:: DATE:
TITLE:
(DATE)
WITNESSED OR ATTESTED BY:
DATE:
TITLE:
(SEAL)
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
ACCEPTED ON:
DATE
MYERSTOWN BOROUGH
MUNICIPALITY
BY:
BY: :
TITLE:
BY: :
TITLE:
ATTESTED BY: :
TITLE:
TITLE:
SEAL
ATTACHMENT 1
TO MS – 944 (PROPOSAL AND CONTRACT MS – 944)
County: Lebanon Municipality: Myerstown Borough Project
Number: 0858006782
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L
E T
E D
B Y
T H
E
M U
N
IC
IP
A
L
IT
Y
LOCATION OF WORK:
Base Bid:
MH 249 to MH 259
Alternate Bid No. 1:
MH-183 to MH-182 MH-236 to MH-193 MH-236 to MH-134 MH-233 to MH-232 MH-112 to MH-111 MH 247 to MH 309
DESCRIPTION OF WORK:
The work will include, but not necessarily be limited to, lining approximately 2,269 LF of sanitary sewer pipe.
ESCALATOR CLAUSE: (if adopted by Municipality.)
N/A
SCHEDULE OF PRICES
Item
1 No.
Approximate 2 Quantities
Unit
*Description
Unit Price
Total
All prices in accordance with PennBid Form
*DESCRIPTION: SUBTOTAL
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT AS
NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL FOR A NON OPTION/BASE BID
OPTION 1 OR ALTERNATIVE 1 BID TOTAL
(5-06) SPECIAL PROVISIONS TO CONTRACT MS-944 (Attachment 1-A)
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an “X”
Traffic Control and Safety Devices to be provided by the Contractor (Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)
Delivery tickets for all materials.
CS-4171 Certificate of Compliance and/or TR-465 Daily Bituminous Mixture Certification required for all materials.
Notify the Municipality five working days prior to start of project.
Work to be completed by November 2, 2026 After November 2, 2026 liquidated damages apply at the rate of $250 per calendar day.
Roadway to be power broomed by (contractor municipality ) prior to start of project.
Excess material to be removed by (contractor municipality ).
Municipality to inspect project.
Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.
Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.
Prime Coat require per Section 461 of Specifications 408.
Bituminous Seal on all abutting pavement and curbs required.
Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.
Scratch/Leveling Courses to be placed at the discretion of appointed inspector(s).
Full width pavement with one pass required.
Municipality reserves the right to limit work completed.
Taper pavement the last 3 feet to curb.
For FOB Source bids, hauling distance will determine selection of bid award.
Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.
Incidental Preparation and clean up required. (Project Construction Materials) The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.
Contractor is responsible for defects that occur within one year of applications.
Contractor is required to review proposed project with Municipality’s Representative prior to bidding.
Oil samples required from each distributor truck by contractor (1) quart: A.M. & P. M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)
At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.
Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.
Notice to Proceed will be the date of Contract acceptance.
Final Completion Certificate & Notice of Completion required.
Future award of Contract will be based on quality of work as determined by the municipality.
Contractor notify all residents of pending work to be performed.
My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
CONTRACTOR’S REPRESENTATIVE DATE MUNICIPALITY’S REPRESENTATIVE DATE
Myerstown Borough
COMPANY MUNICIPALITY
PENAL SUM FORM
EJCDC NO. 1910-28-C (1996 Edition) 00410-1
BID BOND
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
BID
BID DUE DATE:
PROJECT (Brief Description Including Location):
BOND
BOND NUMBER:
DATE (Not later than Bid due date):
PENAL SUM:
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder's Name and Corporate Seal Surety's Name and Corporate Seal
By: By:
Signature and Title Signature and Title
(Attach Power of Attorney)
Attest: Attest:
Signature and Title Signature and Title
Note: (1) Above addresses are to be used for giving required notice.
(2) Any singular reference to Bidder, Surety, OWNER or other party shall be considered plural where applicable.
PENAL SUM FORM
EJCDC NO. 1910-28-C (1996 Edition) 00410-2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1. OWNER accepts Bidder's Bid and Bidder
delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or
3.2. All Bids are rejected by OWNER, or
3.3. OWNER fails to issue a Notice of Award to
Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power or Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term "Bid" as used herein includes a Bid, offer or proposal as applicable.
Attachment 4
AFFIDAVIT RE:
ACCEPTING PROVISIONS OF THE WORKMEN’S COMPENSATION ACT
STATE OF PENNSYLVANIA )
( ss:
COUNTY OF )
being duly sworn according to law deposes and says that accepted the provisions of the Workmen’s Compensation Act of 1915 of the Commonwealth of Pennsylvania, with its supplements and amendments, and insured liability thereunder in accordance with the terms of said Act with .
(SURETY COMPANY)
(TYPE OR PRINT) CONTRACTOR
By:
SIGNATURE
Sworn to and subscribed before me this day of A.D. 20 .
SIGNATURE: NOTARY PUBLIC
MY COMMISSION EXPIRES: (DATE)
D-7126 (7-09)
ANTI-COLLUSION AFFIDAVIT
County: Lebanon
Municipality: Myerstown Borough
Project Number: 0858006782
State of: Fed. Project No.:
(if Applicable)
County of:
The undersigned deponent deposes and says that he is the of the
Company; that he is authorized to make this affidavit on behalf of said company in compliance with Section 102.06(e) of Department Specifications, Publication 408, as amended and that the said company has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
(CONTRACTOR)
BY:
Sworn to and subscribed before me the undersigned Notary Public this day of , 20 .
NOTARY PUBLIC
My commission expires:
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date _______________________
Business or Organization Name (Employer)_________________________________________________
Address _____________________________________________________________________________
City _____________________________________ State_____________ Zip Code ________________
Contractor {dzōŎƻƴǘNJŀŎǘƻNJ όŎƘŜŎƪ ƻƴŜύ
Contracting Public Body _______________________________________________________________
Contract/Project No ___________________________________________________________________
Project Description ____________________________________________________________________
Project Location ______________________________________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act
(‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States
Department of Homeland Security. To the best of my/our knowledge, all employees hired post
January 1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature
NONDISCRIMINATION/SEXUAL HARASSMENT
a. Representations. The Grantee represents that it is presently in compliance with and will remain in compliance with all applicable federal, state, and local laws, regulations, and policies relating to nondiscrimination and sexual harassment for the term of the agreement. The Grantee shall, upon request and within the time periods requested by the Commonwealth, furnish all necessary employment documents and records, including EEO-1 reports, and permit access to its books, records, and accounts by the Commonwealth for the purpose of ascertaining compliance with provisions of this Nondiscrimination/Sexual Harassment Clause.
b. Nondiscrimination/Sexual Harassment Obligations. The Grantee shall not:
i. in any manner discriminate in the hiring of any employee(s) for the performance of the activities required under this agreement or any subgrant agreement, contract, or subcontract, by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania Human Relations Act (“PHRA”) and applicable federal laws, against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
ii. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against or intimidate any of its employees.
iii. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, in the provision of services under this agreement or any subgrant agreement, contract, or subcontract.
iv. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of PHRA and applicable federal laws, against any subgrantee, contractor, subcontractor, or supplier who is qualified to perform the work to which this agreement relates.
v. in any manner discriminate against employees by reason of participation in or decision to refrain from participating in labor activities protected under the Public Employee
Relations Act, Pennsylvania Labor Relations Act, or National Labor Relations Act, as applicable, and to the extent determined by entities charged with the Acts’ enforcement and shall comply with any provision of law establishing organizations as employees’ exclusive representatives.
c. Establishment of Grantee Policy. The Grantee shall establish and maintain a written nondiscrimination and sexual harassment policy that complies with the applicable law and these
Nondiscrimination/Sexual Harassment provisions and shall inform its employees in writing of the policy. The policy must contain a provision that states that sexual harassment will not be tolerated and employees who practice it will be disciplined. For the entire period of this agreement, the Grantee shall: (1) post its written nondiscrimination and sexual harassment policy or these Nondiscrimination/Sexual Harassment provisions conspicuously in easily accessible and well-lighted places customarily frequented by employees at or near where the grant activities are performed; or (2) provide electronic notice of the policy or this clause to its employees not less than annually.
d. Notification of Violations. The Grantee’s obligations pursuant to these provisions are ongoing from the effective date and through the termination date of the agreement. Accordingly, the
Grantee shall notify the Commonwealth if, at any time during the term of this agreement, it becomes aware of any actions or occurrences that would result in violation of these provisions.
e. Cancellation or Termination of Agreement. The Commonwealth may cancel or terminate this agreement and all money due or to become due under this agreement may be forfeited for a violation of the terms and conditions of these Nondiscrimination/Sexual Harassment provisions.
In addition, the granting agency may proceed with debarment or suspension and may place the
Grantee in the Contractor Responsibility File.
f. Subgrant Agreements, Contracts, and Subcontracts. The Grantee shall include these Nondiscrimination/Sexual Harassment provisions in its subgrant agreements, contracts, and subcontracts with all subgrantees, contractors, and subcontractors providing goods or services under this agreement. The incorporation of these provisions in the Grantor’s subgrants, contracts, or subcontracts does not create privity of contract between the Commonwealth and any subgrantee, contractor, or subcontractor, and no third-party beneficiaries are created by those provisions. If the Grantee becomes aware of a subgrantee’s, contractor’s, or subcontractor’s violation of these provisions, the Grantee shall use its best efforts to ensure the subgrantee’s, contractor’s, or subcontractor’s compliance with these provisions.
Signature
Date
RETTEW Project No.:0858006782
NON-DISCRIMINATION AFFIDAVIT
State of :
: SS
County of :
I state that I am of , (Contractor) and that I am authorized (Title) (Name of My Firm) to make this Affidavit on behalf of my firm, and its owners, directors and officers.
Contractor agrees that:
1. In the hiring of employees for the performance of work under the contract or any subcontractor, no contractor, subcontractor or any person acting on behalf of the contractor or subcontractor shall by reason of gender, race, creed or color discriminate against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
2. No contractor or subcontractor or any person on their behalf shall in any manner discriminate against or intimidate any employee hired for the performance of work under the contract on account of gender, race, creed or color.
3. The contract may be canceled or terminated by the OWNER/ENGINEER, and all money due or to become due under the contract may be forfeited for a violation of the terms or conditions of this portion of the contract.
I understand and my firm understands that any misstatement of this affidavit is and shall be treated as fraudulent concealment of the truth relating to submission of bids for this contract.
(Name and Company Position)
SWORN TO AND SUBSCRIBED BEFORE ME THIS DAY OF , 20 .
Notary Public My Commission Expires: ________________________
Document2
EJCDC C-610 – Performance Bond Published December 2010 by the Engineers Joint Contract Documents Committee.
PERFORMANCE BOND
CONTRACTOR (name and address): SURETY (name and address of principal place of business):
OWNER (name and address):
CONSTRUCTION CONTRACT
Effective Date of the Agreement:
Amount:
Description (name and location):
BOND
Bond Number:
Date (not earlier than the Effective Date of the Agreement of the Construction Contract):
Amount:
Modifications to this Bond Form: None See Paragraph 16
Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Performance Bond to be duly executed by an authorized officer, agent, or representative.
CONTRACTOR AS PRINCIPAL SURETY
(seal) (seal)
Contractor’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (attach power of attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to
Contractor, Surety, Owner, or other party shall be considered plural where applicable.
1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference.
2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Paragraph 3.
3. If there is no Owner Default under the Construction Contract, the Surety’s obligation under this Bond shall arise after:
3.1 The Owner first provides notice to the Contractor and
the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to discuss the Contractor’s performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner’s notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 shall be held within ten (10) business days of the Surety’s receipt of the Owner’s notice. If the Owner, the Contractor, and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner’s right, if any, subsequently to declare a Contractor Default;
3.2 The Owner declares a Contractor Default, terminates
the Construction Contract and notifies the Surety; and
3.3 The Owner has agreed to pay the Balance of the
Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract.
4. Failure on the part of the Owner to comply with the notice requirement in Paragraph 3.1 shall not constitute a failure to comply with a condition precedent to the Surety’s obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice.
5. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety’s expense take one of the following actions:
5.1 Arrange for the Contractor, with the consent of the
Owner, to perform and complete the Construction Contract;
5.2 Undertake to perform and complete the Construction
Contract itself, through its agents or independent contractors;
5.3 Obtain bids or negotiated proposals from qualified
contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owners concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or
5.4 Waive its right to perform and complete, arrange for
completion, or obtain a new contractor, and with reasonable promptness under the circumstances:
5.4.1 After investigation, determine the amount for
which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or
5.4.2 Deny liability in whole or in part and notify the
Owner, citing the reasons for denial.
6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner.
7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication for:
7.1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract;
7.2 additional legal, design professional, and delay costs resulting from the Contractor’s Default, and resulting from the actions or failure to act of the Surety under Paragraph 5; and
7.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor.
8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the Surety’s liability is limited to the amount of this Bond.
9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors, and assigns.
10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.
11. Any proceeding, legal or equitable, under this Bond may be instituted in the Court of Common Pleas of Lebanon County, Pennsylvania and shall be instituted within two years after a declaration of Contractor Default or within two years after the
Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum periods of limitations available to sureties as a defense in the jurisdiction of the suit shall be applicable.
12. Notice to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears.
13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
14. Definitions
14.1 Balance of the Contract Price: The total amount payable
by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made including allowance for the Contractor for any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract.
14.2 Construction Contract: The agreement between the
Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents.
14.3 Contractor Default: Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract.
14.4 Owner Default: Failure of the Owner, which has not
been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract.
14.5 Contract Documents: All the documents that comprise
the agreement between the Owner and Contractor.
15. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
16. Modifications to this Bond are as follows:
EJCDC C-615, Payment Bond
PAYMENT BOND
CONTRACTOR (name and address): SURETY (name and address of principal place of business):
OWNER (name and address):
CONSTRUCTION CONTRACT
Effective Date of the Agreement:
Amount:
Description (name and location):
BOND
Bond Number:
Date (not earlier than the Effective Date of the Agreement of the Construction Contract):
Amount:
Modifications to this Bond Form: None See Paragraph 18
Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or representative.
CONTRACTOR AS PRINCIPAL SURETY
(seal) (seal)
Contractor’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (attach power of attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable.
1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner to pay for labor, materials, and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms.
2. If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies, and holds harmless the Owner from claims, demands, liens, or suits by any person or entity seeking payment for labor, materials, or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond.
3. If there is no Owner Default under the Construction Contract, the Surety’s obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 13) of claims, demands, liens, or suits against the Owner or the Owner’s property by any person or entity seeking payment for labor, materials, or equipment furnished for use in the performance of the Construction Contract, and tendered defense of such claims, demands, liens, or suits to the Contractor and the Surety.
4. When the Owner has satisfied the conditions in Paragraph 3, the Surety shall promptly and at the Surety’s expense defend, indemnify, and hold harmless the Owner against a duly tendered claim, demand, lien, or suit.
5. The Surety’s obligations to a Claimant under this Bond shall arise after the following:
5.1 Claimants who do not have a direct contract with the
Contractor,
5.1.1 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the Claim; and
5.1.2 have sent a Claim to the Surety (at the address described in Paragraph 13).
5.2 Claimants who are employed by or have a direct
contract with the Contractor have sent a Claim to the Surety (at the address described in Paragraph 13).
6. If a notice of non-payment required by Paragraph 5.1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant’s obligation to furnish a written notice of non-payment under Paragraph 5.1.1.
7. When a Claimant has satisfied the conditions of Paragraph
5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety’s expense take the following actions:
7.1 Send an answer to the Claimant, with a copy to the
Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and
7.2 Pay or arrange for payment of any undisputed
amounts.
7.3 The Surety’s failure to discharge its obligations
under Paragraph 7.1 or 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement. If, however, the Surety fails to discharge its obligations under Paragraph 7.1 or 7.2, the Surety shall indemnify the Claimant for the reasonable attorney’s fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant.
8. The Surety’s total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney’s fees provided under Paragraph 7.3, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.
9. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under this Bond, subject to the Owner’s priority to use the funds for the completion of the work.
10. The Surety shall not be liable to the Owner, Claimants, or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to or give notice on behalf of Claimants, or otherwise have any obligations to Claimants under this Bond.
11. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.
12. No suit or action shall be commenced by a Claimant under this Bond other than in the Court of Common Pleas of Lebanon County, Pennsylvania or after the expiration of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Paragraph 5.1.2 or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs.
If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.
13. Notice and Claims to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received.
14. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
15. Upon requests by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made.
16. Definitions
16.1 Claim: A written statement by the Claimant
including at a minimum:
1. The name of the Claimant;
2. The name of the person for whom the labor was done, or materials or equipment furnished;
3. A copy of the agreement or purchase order pursuant to which labor, materials, or equipment was furnished for use in the performance of the Construction Contract;
4. A brief description of the labor, materials, or equipment furnished;
5. The date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract;
6. The total amount earned by the Claimant for labor, materials, or equipment furnished as of the date of the Claim;
7. The total amount of previous payments received by the Claimant; and
8. The total amount due and unpaid to the Claimant for labor, materials, or equipment furnished as of the date of the Claim.
16.2 Claimant: An individual or entity having a direct
contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials, or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic’s lien or similar statute against the real property upon which the Project is located. The intent of this Bond shall be to include without limitation in the terms of “labor, materials, or equipment” that part of the water, gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor’s subcontractors, and all other items for which a mechanic’s lien may be asserted in the jurisdiction where the labor, materials, or equipment were furnished.
16.3 Construction Contract: The agreement between the
Owner and Contractor identified on the cover page, including all Contract Documents and all changes made to the agreement and the Contract Documents.
16.4 Owner Default: Failure of the Owner, which has not
been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract.
16.5 Contract Documents: All the documents that
comprise the agreement between the Owner and Contractor.
17. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
18. Modifications to this Bond are as follows:
NOTICE OF AWARD
Project No.: 0858006782
To: Date:
(CONTRACTOR)
Re: Myerstown Borough Main Interceptor Lining
Bidder:
You are notified that your Bid dated for the above Contract has been considered. You are the apparent Successful Bidder and the OWNER intends to award a contract for the Main Interceptor Lining Project.
The Contract Price of the project is ($ ).
You are required to provide the OWNER with performance and payment bonds (MS-944 Attachments 2 &
3) within 10 days after receipt of this Notice of Award by you.
If the required bonds and forms are not received, OWNER will be entitled to consider…