This is a Special Provisions document for Contract MS-944 issued by Myerstown Borough in Pennsylvania, detailing mandatory requirements for bituminous paving and roadway improvement work. The project encompasses approximately 5,775 square yards of milling and 490 tons of bituminous wearing course, with all work to be completed by October 1, 2026. Contractors must notify the Municipality five working days prior to project start and are responsible for providing traffic control and safety devices in compliance with current MUTCD standards. The contract requires submission of Form CS-4171 Certificate of Compliance and TR-465 Daily Bituminous Mixture Certification for all materials, along with Bills of Lading for each bituminous material shipment. Key specifications include power brooming of the roadway prior to work commencement, tack coat application per Section 460 or 409 of Specifications 408, prime coat installation per Section 461, bituminous seal on abutting pavement and curbs, and full-width pavement placement in a single pass with tapering of the final three feet to curb.

The contractor is responsible for all defects occurring within one year of application and must complete testing in accordance with Specification Form 408 Section 409, excluding superpave volumetric testing. Oil samples must be collected from each distributor truck—one quart each morning and afternoon—witnessed and retained by the Municipality, and at least three random stone samples must be taken on-site under municipal observation. Liquidated damages are assessed at $250 per calendar day for work not completed by the deadline. The Municipality reserves the right to limit work completion, procure materials best suited to their requirements, make awards based on aggregate totals of like items, and inspect all completed work. Contractors must notify all residents of pending work and provide final completion certification and notice of completion upon project conclusion. Future contract awards will be based on the quality of work as determined by the Municipality.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(5-06)

SPECIAL PROVISIONS TO CONTRACT MS-944 (Attachment 1-A)

CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR

The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an “X”

Traffic Control and Safety Devices to be provided by the Contractor (Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)

Delivery tickets for all materials.

CS-4171 Certificate of Compliance and/or TR-465 Daily Bituminous Mixture Certification required for all materials.

Notify the Municipality five working days prior to start of project.

Work to be completed on or before November 2, 2026. After November 2, 2026 liquidated damages apply at the rate of $250 per calendar day.

Roadway to be power broomed by (contractor municipality ) prior to start of project.

Excess material to be removed by (contractor municipality ).

Municipality to inspect project.

Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.

Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.

Prime Coat require per Section 461 of Specifications 408.

Bituminous Seal on all abutting pavement and curbs required.

Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.

Scratch/Leveling Courses to be placed at the discretion of appointed inspector(s).

Full width pavement with one pass required.

Municipality reserves the right to limit work completed.

Taper pavement the last 3 feet to curb.

For FOB Source bids, hauling distance will determine selection of bid award.

Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.

Incidental Preparation and clean up required. (Project Construction Materials) The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.

Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.

Contractor is responsible for defects that occur within one year of applications.

Contractor is required to review proposed project with Municipality’s Representative prior to bidding.

Oil samples required from each distributor truck by contractor (1) quart: A.M. & P. M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)

At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.

Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.

Notice to Proceed will be the date of Contract acceptance.

Final Completion Certificate & Notice of Completion required.

Future award of Contract will be based on quality of work as determined by the municipality.

Contractor notify all residents of pending work to be performed.

My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.

CONTRACTOR’S REPRESENTATIVE DATE MUNICIPALITY’S REPRESENTATIVE DATE

Myerstown Borough

COMPANY MUNICIPALITY

File details come from the government source that posted it. Updated .