7-Phase I Scope of Work and Bid Cost Table.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Rehabilitation of 1150 S 28th St (The Ashanti House) Phase 1
Solicitation number
RFP260138
Issued by
Jefferson County, Kentucky

About this file

This is a Phase I Scope of Work and Cost Estimate Table for the rehabilitation of The Ashanti House, located at 1150 S 28th Street in Louisville, Kentucky, under the direction of the Office of Housing and Community Development. The project encompasses comprehensive rehabilitation work organized into five primary categories: Building Envelope, Interior Improvements, Site Improvements, Mechanical/Electrical/Plumbing (MEP) systems, and Other costs. Building Envelope work includes roof system replacement with gutters and downspouts, roof structure repairs, tuck pointing for stabilization, window replacement across four sections, installation of ingress/egress doors, thermal protection, and storefront windows on the East Elevation at street level. Interior Improvements span two levels and include selective demolition while preserving exterior brick walls, removal of a rear addition (approximately 20' x 12'), installation of CMU wall envelope closure, ceiling improvements, flooring preparation, stair repairs on both East and West sides, and elevator replacement. Site Improvements address carport demolition and privacy/retaining wall stabilization and modification.

The cost estimate table identifies all line items for the project; however, all unit prices, quantities, and total costs are listed as $0.00, indicating this is a template requiring bidders to provide pricing information. The MEP scope includes installation of a new 400-amp electrical service with two 200-amp panels and sub-metering, electrical outlets and lighting for White Box and exit signs, HVAC systems with one 4-ton unit per floor and trunk-line ductwork, and new sewer service connection with plumbing for two bathrooms and two water heaters. The table also includes line items for contingencies and architectural plans, general contracting, and construction administration. Bidders are expected to complete the cost estimate table with their proposed pricing for each line item to establish the basis for Phase I contract award and execution.

View the file

Other files

File Type Posted
6-Vendor Information.pdf PDF
8-RFP260138 Specifications.pdf PDF
3-GFE Docs.xlsx XLSX spreadsheet
1-Drawings.pdf PDF
2-Acknowledgement Preference (Constr) 1.pdf PDF
9-Submission Instructions - RFP260138.pdf PDF
4-Procurement - LMCO ban the box.pdf PDF
5-W9 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

1150 S 28th St
"The Ashanti House"
Cost Estimate Table for Bid 2025
Phase I Rehabilitation
ItemsQuantitiesUnitsPrice/UnitTotal
Building Envelope
Roof System, Including Gutters and Downspouts$0.00
Roof Structure Repairs$0.00
Tuck Pointing - Stabilization throughout and including at Window Openings$0.00
Remove Existing Windows and Install New (A)$0.00
Remove Existing Windows and Install New (B)$0.00
Remove Existing Windows and Install New (C)$0.00
Remove Existing Windows and Install New (D)$0.00
Ingress/Egress Doors$0.00
Thermal Protection$0.00
Storefront Windows (East Elevation), Street-Level$0.00
Total Building Envelope$0.00
Interior Improvements
Level 1- Demolition; wood stud; drywall; electrical wiring; attachments, etc. Keep
exterior brick wall and repair if needed$0.00
Remove red rear addition, approximately 20' X 12'$0.00
Enclose building envelope, CMU wall.$0.00
Level 1- Ceiling Improvements (remove panels,
wiring, & attachments$0.00
Level 1- Walls Improvements (included in
demolition above$0.00
Level 1- Flooring; remove top layer; clean$0.00
Level 2- Demolition; wood stud; drywall; electrical wiring; attachments, etc. Keep
exterior brick wall and repair if needed$0.00
Level 2- Walls Improvements (included in demolition above)$0.00
Level 2- Ceiling Improvements (remove tiles; electrical wiring and attachments)$0.00
Level 2- Flooring; remove top layer; clean$0.00
Stairs (East); repairs$0.00
Stairs (West); repairs$0.00
Elevator- Replace$0.00
Total Interior Improvements$0.00
Site Improvements
Carport Demolition$0.00
Privacy/Retaining Wall Stabilization and Modification$0.00
Total Site Improvements$0.00
Mechanical/Electrical/Plumbing (MEP)
New electrical service, 400 AMP; 2 panels, 200 AMP each and sub-metering system$0.00
Electrical outlets and lighting for "White Box" and Exits signs$0.00
HVAC system, 1 unit per each floor, each 4 ton, and trunk-line ductwork$0.00
New property service connection (sewer); plumbing for 2 bathrooms; 2 water heaters$0.00
Total Mechanical/Electrical/Plumbing (MEP)$0.00
Other
Contingencies$0.00
Architectural plans, General Contracting, Construction Administration$0.00
GRAND TOTAL$0.00

File details come from the government source that posted it. Updated .