7 - Hunley Park - Form 66.pdf

PDF 19 KB Posted

Attached to
Repair Storm Drainage Hunley Park
Solicitation number
FA441820R0011
Issued by

About this file

This document contains a federal contract solicitation and related submittal requirements. The solicitation is for a firm-fixed price contract to complete the Repair Storm Drainage Hunley Park project at Joint Base Charleston - Air Base in North Charleston, South Carolina within 198 calendar days. A site visit is scheduled for May 20, 2020. The solicitation number is FA441820R0011 and was issued by the Department of the Air Force Air Mobility Command. The submittal requirements specify that the contractor must provide various plans and documentation related to construction scheduling, health and safety, quality control, concrete, earthwork, exterior improvements, and utilities by certain deadlines after notice to proceed. Closeout submittals including test results and as-builts are due at project completion.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66, OCT 99 Previous Edition Will Be Used

LI

NE

N

UM

BE

R Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

GENERAL

Project Specific Form 66 X NTP + 3 Construction Schedule X NTP + 7 TCN Schedule (electronic required, hard copy optional) X NTP + 7

Contractor's Health, Safety, and Environment Plan X NTP + 7 Contractor's QA/QC Plan X NTP + 7

Division 3 - Concrete Concrete Reinforcing X X NTP + 21 Cast-in-Place X X X X X X NTP + 21 Concrete Accessories X X NTP + 21

Division 31 - Earthwork Earthwork X X NTP + 21 Erosion Control X X NTP + 21

Division 32 - Exterior Improvements Paving Subbase X X X X NTP + 21 Asphalt Paving X X X X NTP + 21 Seeding X X X NTP + 21

Division 33 - Utilities HDPE Steel Reinforced Pipe X X X X X X X NTP + 21

CLOSEOUT

Factory and Field Test Certificates, Logs and Test Results X Before

Acceptance

Inspection Logbook X Before Acceptance

As Builts (electronic in AutoCAD and hard copies on Mylar) X Final + 7

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

DKFX 1051443 Repair Storm Drainage

- Hunley Park

Submittal 1

File details come from the government source that posted it. Updated .