4 - Schedule B Hunley Park.pdf
PDF 54 KB Posted
- Attached to
- Repair Storm Drainage Hunley Park
- Solicitation number
- FA441820R0011
About this file
This document contains a bid schedule and related federal contract opportunity solicitation. The bid schedule outlines pricing for a base bid and various line items for a project to repair storm drainage at Hunley Park at Joint Base Charleston in South Carolina. Pricing is provided on a lump sum basis for the base bid and estimated quantities for excavation of unsuitable soils, disposal of contaminated soils, and removal and disposal of rock. The related federal contract opportunity solicitation seeks a firm-fixed price contract for personnel, equipment, tools, and materials to complete the storm drainage repair project with an anticipated performance period of 198 calendar days. A pre-bid site visit is scheduled for May 20, 2020 and bids are due by the date specified in the solicitation. The contracting agency is the Air Force Air Mobility Command.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule "B"
Item No. Description Quantity Unit Unit Price Total
0001 BASE BID: All work as required by drawings and specifications for Project DKFX - 1048 Repair Storm Drainage Hunley Park
1 LS
Base BID (Line Item 0001)
UNIT PRICES
0002 EST QTY: Excavation of Unsuitable Soils. Unit of measurement based on cubic yard of earth excavated based on survey of all volume removed. Includes cost of removal, disposal, and replacement with compacted select fill material
0003 EST QTY: Disposal of Contaminated Soils. Unit of measurement based on tons of soils removed off base for proper disposal based on survey of weight removed. Unit pricing includes storage, transportation, testing and all work associated with disposal of contaminated soils. Disposed offbase in accordance local laws.
30 Ton
0004 EST QTY: Removal and Disposal of Rock. Unit of measurement based on cubic yards of rock removed based on survey of all volume removed. Unit pricing includes all work associated with removal and disposal, backfill with compacted select fill material.
5 CY
December 13, 2019
Bid Schedule
Project DKFX 1051443 Repair Storm Drainage Hunley Park
Joint Base Charleston, South Carolina
TOTAL BID (Sum of Line Items 0001, 0002, 003 and 004)
20 CY
BID SCHEDULE
File details come from the government source that posted it. Updated .