Summary of Granite School District General Conditions for Construction

This document is the General Conditions of the Contract for Construction (Revision March 3, 2026) established by Granite School District (GSD) in Utah to govern construction contracts. The General Conditions establish the contractual framework, roles, and responsibilities for construction projects undertaken by GSD, defining relationships between the Owner (GSD), Contractor, Designer, and Subcontractors. Key provisions address contract document hierarchy and interpretation, contractor obligations regarding site review and compliance with contract documents, contractor supervision and construction procedures, labor and materials provision, warranty requirements, permit and fee responsibilities, construction scheduling with critical path method requirements, submittal procedures and approvals by the Designer, and safety and insurance obligations. The document specifies that the Contractor must employ a competent superintendent on-site, prepare detailed construction schedules with monthly updates, maintain as-built drawings, and provide monthly progress reports. Contract time is of the essence, and the Contractor is responsible for all coordination, quality control, and correction of defective work. GSD retains the right to inspect work, reject defective materials and labor, and suspend work for non-compliance. The document establishes a claims and dispute resolution process including a Preliminary Resolution Effort (PRE) procedure before formal claims can be submitted.

The General Conditions address payment procedures through Certificates for Payment issued by the Designer, progress payments, substantial completion inspections, final completion requirements, and retention of funds by GSD. Contractor warranties cover materials and equipment quality and Work conformity with Contract Documents, excluding remedy for damage from abuse, improper maintenance, or normal wear. Change Orders, Construction Change Directives, and Designer's Supplemental Instructions (DSIs) provide mechanisms for contract modifications, with price adjustments resolved through the claims process when parties disagree. The document establishes procedures for termination by Contractor, termination by GSD for cause, and termination for convenience. Builder's Risk property insurance and liability insurance requirements are mandated, along with bid bonds and performance and payment bonds. The Contractor is responsible for hazardous materials handling, drug-free workplace compliance, utility location and protection, and maintaining safe conditions on-site. The document addresses owner-provided materials, defines substantial completion requirements, and specifies conditions for final payment, including waiver of claims upon accepting final payment. All provisions are governed by Utah law with venue in Salt Lake County, unless otherwise agreed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G E N E R A L C O N D I T I O N S i Granite School District General Conditions of the Contract for Construction- Revision – March 3, 2026

GRANITE SCHOOL DISTRICT

GENERAL CONDITIONS OF THE

CONTRACT FOR CONSTRUCTION

Article Title Page

1 GENERAL PROVISIONS 1

2 GSD 7

3 CONTRACTOR 8

4 ADMINISTRATION OF THE CONTRACT 17

5 SUBCONTRACTORS 23

6 CONSTRUCTION BY GSD OR OTHER CONTRACTORS 25

7 MODIFICATIONS 26

8 TIME 29

9 PAYMENTS AND COMPLETION 32

10 PROTECTION OF PERSONS AND PROPERTY 38

11 INSURANCE AND BONDS 41

12 UNCOVERING, CORRECTION OF WORK, AND WARRANTY 44

13 MISCELLANEOUS PROVISIONS 47

14 TERMINATION OR SUSPENSION OF THE CONTRACT 51

ii iii

TABLE OF CONTENTS

ARTICLE 1. GENERAL PROVISIONS

1.1 Basic Definitions

1.2 Construction of Contract Documents, Venue

1.2.1 Applicable Laws

1.2.2 Capitalization

1.2.3 Interpretation

1.2.4 Venue

1.2.5 Intent and Hierarchy

1.2.6 Conflict Responsibility

1.2.7 Separability

1.2.8 Dividing Work and Contractor Representation

1.2.9 Construction of Words

1.3 Ownership and Use of Designer’s Drawings, Specifications and Other Documents ... 6

1.3.1 In General

ARTICLE 2: GSD

2.1 Information and Services Required of GSD

2.1.1 Project Manager

2.1.2 Specialists and Inspectors

2.1.3 Surveys and Legal Description

2.1.4 Prompt Information and Services

2.1.5 Copies of Drawings and Project Manuals for Construction

2.1.6 Other Duties

2.1.7 No Representations or Warranties

ARTICLE 3: CONTRACTOR

3.1 Review of Contract Documents and Field Conditions by Contractor

3.1.1 Reviewing Contract Documents, Information, Reporting Errors, Inconsistencies or Omissions

3.1.2 Field Conditions

3.1.3 Perform in Accordance with Documents and Submittals

3.1.4 Performance to Produce the Complete System and Intended Results

3.1.5 Prior to Construction

3.1.6 GSD’s Indemnification

3.2 Supervision and Construction Procedures

3.2.1 Supervision and Control

3.2.2 Responsibility

3.2.3 Not Relieved of Obligations

3.2.4 Inspections and Approvals

3.3 Labor and Materials

3.3.1 Payment by Contractor

3.3.2 Proposed Substitutions

3.3.3 Discipline and Competence

3.3.4 Local Preference

3.4 Warranty

3.4.1 In General

3.4.2 Exclusion

3.4.3 Furnish Evidence on Request

iv

3.4.4 Written Warranties

3.5 Allowances

3.5.1 In General

3.5.2 Usage of Allowance

3.5.3 Per GSD’s Specifications

3.6 Permits, Fees, Notices, Labor and Materials

3.6.1 Permits and Fees

3.6.2 Compliance with Public Authorities, Notices

3.6.3 Correlation of Contract Documents and Enactments

3.6.4 Failure to Give Notice

3.7 Contractor’s Superintendent

3.7.1 Project Superintendent

3.7.2 Assigned Superintendent

3.8 Contractor’s Construction Schedules

3.8.1 In General

3.8.2 Schedule of Submittals

3.8.3 Planning and Priority

3.8.4 Compliance with Schedules

3.9 Documents and Samples at the Site, Certifying “As-Built”

3.10 Submittals

3.10.1 Not Contract Documents

3.10.2 Promptness

3.10.3 Not Perform Until Designer Approves

3.10.4 Representation by Contractor

3.10.5 Contractor’s Liability

3.10.6 Direct Specific Attention to Revisions

3.10.7 Informational Submittals

3.10.8 Reliance on Professional Certification

3.11 Use of Site

3.11.1 In General

3.11.2 Access

3.12 Access to Work

3.13 Royalties and Patents

3.14 Reports

3.14.1 Progress Report

3.14.2 Equipment and Materials Report

3.14.3 Additional Reports

3.14.4 Procedures Manual

3.15 Storage and Defective Work

3.15.1 Storage and Inspection by Contractor

3.15.2 Rejection of Defective Work

3.15.3 Corrective Work

3.15.4 Owner’s Right to Cure

3.15.5 Acceptance of Defective Work

3.15.6 Storage of Materials

3.16 Turnover of Completed Work to GSD

3.16.1 Cleanliness

3.16.2 Miscellaneous

3.16.3 Final Responsibility

v

3.17 As-Builts or Record Drawings

3.18 Operation & Maintenance (O&M) Manuals

ARTICLE 4: ADMINISTRATION OF THE CONTRACT

4.1 Designer’s Administration of the Contract

4.1.1 In General

4.1.2 Site Visits

4.1.2 (1) In General

4.1.2 (2) Written Report

4.1.3 Communications Facilitating Contract Administration

4.1.4 Designer Issues Certificates of Payments

4.1.5 Designer may Reject Work, Order Inspection, Tests

4.1.6 Designer Review Contractor’s Submittals

4.1.6 (1) Submittal Review

4.1.6 (2) Time for Submittal Review

4.1.6 (3) Submittal Accuracy

4.1.6 (4) Contractor’s Obligation

4.1.6 (5) Contractor’s Liability

4.1.6 (6) Submittal Content

4.1.6 (7) Designer’s Indemnification

4.1.7 Designer’s On-Site Representatives

4.1.8 Designer’s Role in Preliminary Resolution Process

4.1.9 Criteria for Designer’s Determination for Decisions Under 4.1.8

4.1.10 Products Approvals

4.2 Inspections Substantial and Final

4.2.1 Substantial Completion Inspection

4.2.2 Final Completion Inspection

4.3 Procedure for Preliminary Resolution Effort (PRE)

4.3.1 Request for Preliminary Resolution Effort (PRE)

4.3.2 Time for Filing

4.3.3 Content Requirement of PRE

4.3.4 Time for Decision

4.3.5 Contractor to Continue Performance

4.3.6 If Decision Not Issued

4.3.7 Decision Final Unless Claim Submitted

4.4 Claims and Disputes

4.4.1 Claim Content Requirement

4.4.2 Time Limits and Content of Claims

4.4.3 Continuing Contract Performance

4.4.4 Waiver of Claims: Final Payment

4.5 Resolution of Claims and Disputes

4.5.1 Agreement of Claimant on Method and Person(s) Evaluating Claims

4.6 Payment of Claim

4.6.1 Payment Provisions

4.6.2 Term of Payment

4.6.3 Date of Final Determination

4.6.4 No Delay of Payment

4.6.5 Payment Conditions

4.6.6 Subcontractor Payment

4.6.7 Release of Claim

vi

4.7 Allocation of Cost of Claim Resolution

4.7.1 Cost of Filing Fee

4.7.2 Cost of Resolution

4.7.3 Cost Allocation

4.7.4 Cost of Representation

4.8 Alternative Procedures

4.9 Impact on Future Selections

4.10 GSD’s Right to have Issues, Disputes of Claims Considered

ARTICLE 5: SUBCONTRACTORS

5.1 Award of Subcontracts and Other Contracts for Portions of the Work

5.1.1 Approval Required

5.1.2 Requirements

5.1.3 Adjustments if Objections

5.1.4 Subsequent Changes

5.2 Sub-Contractual Relations

5.2.1 Comply with Contract Documents

5.2.2 Rights

5.2.3 Sub-Subcontractors

5.2.4 Document Copies

5.2.5 UCC Provisions

5.3 Contingent Assignment of Subcontracts

5.3.1 Conditions for Assignment to GSD

ARTICLE 6: CONSTRUCTION BY GSD OR BY SEPARATE CONTRACTORS

6.1 GSD’s Right to Perform Construction and to Award Separate Contracts

6.1.1 In General

6.1.2 Coordination and Revisions

6.2 Mutual Responsibility

6.2.1 Contract Coordination

6.2.2 Reporting Problems to GSD and Designer

6.2.3 Costs

6.2.4 Contractor Remedial Work

6.2.5 Claims Between Contractor and Separate Contractor

ARTICLE 7: MODIFICATIONS

7.1 Modifications

7.1.1 In General

7.1.2 By Whom Issued

7.1.3 Performance Requirements

7.1.4 Adjusting Unit Prices

7.2 Change Orders

7.2.1 Defined

7.2.2 Adjusting Price

7.2.3 Resolution of Price and Standards

7.2.4 Credits

7.2.5 Agreement; Change Order Issued

7.2.6 Disagreements; Claims Process Still Applies; Construction Change Directive May Be Issued

7.3 Construction Change Directives

7.3.1 Defined

7.3.2 Used When Lack of Agreement on Change Order

vii

7.3.3 Proceed with Work and Notify Designer about Adjustment Method

7.3.4 Is Change Order If Contractor Agrees

7.4 DSI (Designer’s Supplemental Instructions)

ARTICLE 8: TIME

8.1 Progress and Completion

8.1.1 Time of Essence

8.1.2 Notice to Proceed and Insurance

8.1.3 Complete within Contract Time

8.2 Schedule Preparation

8.2.1 Schedule Preparation

8.2.2 Initial Contract Time

8.2.3 Interim Completion Dates and Milestones

8.2.4 GSD’s Right to Take Exception

8.2.5 Initial Schedule Submission

8.2.6 Schedule of Submittals

8.3 Schedule Changes and Modifications

8.3.1 Contract Time Change Requires Modification

8.3.2 Updates

8.3.3 Resequencing and Duration Changes of Schedule

8.3.4 Time Extension Requests

8.4 Liquidated Damages

8.4.1 In General

8.4.2 Proceeding with Work Not Deemed Waiver

8.5 Consequential Damages

ARTICLE 9: PAYMENTS AND COMPLETION

9.1 Schedule of Values

9.1.1 Schedule of Values

9.1.2 Form

9.2 Applications for Payment

9.2.1 In General

9.2.2 Payment for Material and Equipment

9.2.3 Warranty of Title

9.2.4 Holdback by GSD

9.3 Certificates for Payment

9.3.1 Issued by Designer

9.3.2 Designer’s Representations

9.4 Decisions to Withhold Certification

9.4.1 When Withheld

9.4.2 Certification Issued When Reasons for Withholding Removed

9.4.3 Continue Work Even if Contractor Disputes Designer’s Determination ... 34

9.4.4 GSD Not in Breach

9.4.5 Application or Release of Withholding

9.5 Progress Payments

9.5.1 In General

9.5.2 Contractor and Subcontractor Responsibility

9.5.3 Information Furnished by Designer to Subcontractor

9.5.4 GSD and Designer Not Liable

9.5.5 Certificate, Payment or Use Not Acceptance of Improper Work

9.6 Substantial Completion

viii

9.6.1 Substantial Completion Inspection

9.6.2 Payment Upon Substantial Completion

9.6.3 Delivering Warranties and Guarantees

9.6.4 Review of Contract Price

9.7 Partial Occupancy or Use

9.7.1 In general

9.7.2 Inspection

9.7.3 Not Constitute Acceptance

9.8 Final Completion and Final Payment

9.8.1 Certificate for Payment

9.8.2 Final Inspection and Payment

9.8.3 Conditions for Final Payment and Retainage

9.8.4 Waiver by Accepting Final Payment

ARTICLE 10: PROTECTION OF PERSONS AND PROPERTY

10.1 Safety Precautions and Programs

10.1.1 Contractor Responsibility

10.1.2 Hazardous Materials

10.1.3 Hazardous Materials – Asbestos

10.1.4 Drug-Free Workplace

10.1.5 Standards of Conduct

10.2 Safety of Persons and Property

10.2.1 Contractor Responsibility

10.2.2 Safety Program, Precautions

10.2.3 Compliance with Laws

10.2.4 Erect and Maintain Safeguards

10.2.5 Utmost Care

10.2.6 Prompt Remedy

10.2.7 Safety Designee

10.2.8 Load Safety

10.2.9 Off-Site Responsibility

10.3 Emergencies

ARTICLE 11: INSURANCE AND BONDS

11.1 Liability Insurance

11.1.1 In General

11.1.2 Configurations

11.1.3 Contractor Liability

11.1.4 Certificate of Insurance, Notice Requirements, Additional Insured, Insurer Letter

11.1.5 Deductible Liability

11.1.6 Alternative Coverage

11.1.7 No Release From Liability

11.2 “Builder’s Risk” Property Insurance

11.2.1 In General

11.2.2 Inspections, Recommendations

11.2.3 Deductible

11.2.4 Adjusted With and Payable to Risk Manager as Trustee

11.2.5 Waiver

11.2.6 Special Hazards

11.3 Bonds

ix

11.3.1 Bid Bond

11.3.2 Bid Bond Submission

11.3.3 Performance and Payment Bond

ARTICLE 12: UNCOVERING, CORRECTION of WORK and WARRANTY PERIOD

12.1 Uncovering of Work

12.1.1 Uncover Uninspected Work

12.1.2 When Designer Requested Prior

12.1.3 When Designer Did Not Request Prior

12.2 Correction of Work and Warranty Period

12.2.1 Contractor Correct the Work

12.2.2 Warranty and Correction After Substantial Completion

12.2.3 Removal of Work

12.2.4 No Limit on Other Obligations

12.3 Acceptance of Nonconforming Work

12.4 General Representations and Covenants

12.4.1 Assigned Warranties

12.4.2 Survival of Warranties

12.4.3 No Warranty by GSD

ARTICLE 13: MISCELLANEOUS PROVISIONS

13.1 Designer’s Responsibilities

13.2 Successors and Assigns

13.3 Written Notice

13.3.1 Personal Delivery and Registered or Certified Mail

13.4 Rights and Remedies

13.4.1 Not Limit

13.4.2 No Waiver

13.5 Equal Opportunity; No Discrimination; No Sexual Harassment

13.6 Independent Contractor

13.7 Right to Inspect

13.8 No Waiver of Governmental Immunity

13.9 Owner Purchased and Owner Provided Materials

13.9.1 Owner Provided Materials

13.9.2 Storage of Owner Provided Materials

13.9.3 Contractor Receipt of Owner Provided Materials

13.9.4 Contractor Responsible Upon Receipt

13.9.5 Owner Provided Same As Contractor Provided

13.9.6 Non-Owner Provided Materials

13.10 Conflicting Laws

13.11 E-Verify

13.12 Excluded Parties List System

ARTICLE 14: TERMINATION OR SUSPENSION OF THE CONTRACT

14.1 Termination by Contractor

14.1.1 In General

14.1.2 Notice

14.2 Termination by GSD for Cause

14.2.1 In General

14.2.2 GSD’s Right to Carry Out the Work

14.2.3 Items Required to be Transferred or Delivered

14.2.4 Payment

x

14.2.5 GSD Protection if Lienable

14.2.6 Credits and Deficits

14.2.7 If Contractor Found Not in Default or Excusable

14.2.8 Rights and Remedies Not Exclusive

14.3 Delay or Interruption of Work by GSD for Convenience

14.3.1 By GSD in Writing

14.3.2 Adjustments

14.4 Termination for Convenience of GSD

14.4.1 In General

14.4.2 Contractor Obligations

14.4.3 Termination Claim

14.4.4 Agreed Upon Payment

14.4.5 Payment Not Agreed Upon

14.4.6 Deductions

14.4.7 Partial Termination

14.4.8 Partial Payments

14.4.9 Preserve and Make Available Records

14.5 GSD’s Right to Stop the Work

14.6 Indemnification

General Conditions of the Contract for Construction

GRANITE SCHOOL DISTRICT

ARTICLE 1. GENERAL PROVISIONS

1.1 BASIC DEFINITIONS

ADDENDA. "Addenda" means the written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the bidding documents or the Contract Documents.

AS-BUILT DRAWINGS. "As-Built Drawings” means the record set of drawings that memorialize and denote the Work as constructed. As-Built Drawings are produced, by the DESIGNER, from the redline plans submitted by the Contractor at the conclusion of the project. The redline plans identify actual component installation and dimensional routing of system components that are different from shown in the Contract Documents.

ASSISTANT SUPERINTENDENT. “Assistant Superintendent” means the current holder of the position of Assistant Superintendent, Support Services, for the Granite School District. Assistant Superintendent may include a designee selected by the Assistant Superintendent for a particular contract function referred to in the General Conditions.

BID. "Bid" means the offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the Work to be performed.

BID DOCUMENTS. "Bid Documents" are defined as the Plans, Project Manual (GSD boilerplate and technical specifications), Addenda, and additional documentation generated by the bid process for the Work.

BONDS. "Bonds" mean the bid bond, performance and payment bonds, and other instruments of security.

CERTIFICATE OF OCCUPANCY. "Certificate of Occupancy” means the certificate that is issued for the permanent occupancy of the new facility, and is issued in compliance and oversight with the Utah State Board of Education (USBE).

CHANGE ORDER. "Change Order" means a written instrument prepared by the Designer and signed by Owner, Contractor and Designer, stating their agreement upon all of the following: (1) a change in the Work; (2) the amount of the adjustment in the Contract Price, if any; and, (3) the extent of the adjustment in the Contract Time, if any.

CLAIM. "Claim" means a demand or assertion by one of the parties seeking, as a matter of right, modification, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between Owner and Contractor arising out of, or relating to the Contract.

CONSTRUCTION CHANGE DIRECTIVE.

"Construction Change Directive" means a written order prepared by the Designer and signed by Owner, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Price or Contract Time, or both. Owner may, by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions, or other revisions; even if it may impact the Contract Price or Contract Time.

CONSTRUCTION PHASE. In a CM/GC Agreement, Construction Phase means the period commencing on the execution of a GMP Amendment, together with the (i) issuance by GSD of a Notice to Proceed with any on-site construction; and (ii) the issuance of a building permit by the applicable permitting authority.

CONTRACT. The Contract Documents form the Contract for Construction. The term "Contract" represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Designer and Contractor,

(2) between Owner and a Subcontractor or Sub - Subcontractor, or (3) between any persons or entities other than Owner and Contractor. The Designer shall, however, be entitled to performance and enforcement of obligations of Contractor under the Contract intended to facilitate performance of the Designer's duties.

CONTRACT DOCUMENTS. The term "Contract Documents" means the Agreement between Owner and Designer, Owner and Contractor (including, if applicable a CM/GC Agreement) (hereinafter referred to as the "Agreement"), the Conditions of the Contract (General, Supplementary, and other Conditions), the Drawings, Project Manual, Specifications, Addenda, and other documents listed in the Agreement, and Modifications issued after execution of the Agreement. The Contract Documents shall also include the Bid Documents, to the extent not in conflict with the other Contract Documents.

CONTRACT PRICE. The term "Contract Price" means the Contract Price as stated in Contractor's Agreement and, including authorized adjustments (modifications), is the total amount payable by Owner to Contractor for performance of the Work under the Contract Documents.

CONTRACT TIME. "Contract Time", unless otherwise provided in the Contract Documents, means the period of time, including authorized adjustments (modifications), allotted in the Contract Documents for Substantial Completion of the Work.

CONTRACTOR. “Contractor” is the person or entity identified as such in Contractor's Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means Contractor or Contractor's authorized representative. When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case, shall mean Contractor who executes each separate Contractor’s Agreement.

CONTRACTOR’S AGREEMENT. “Contractor’s Agreement” means the agreement executed between the Contractor and GSD for the Work.

DAY. The term "day" as used in the Contract Documents shall mean “calendar day” unless otherwise specifically defined.

DEFECTIVE. "Defective" is an adjective which when modifying the word "Work" refers to Work that is unsatisfactory or faulty; or does not conform to the Contract Documents (including substitutions not properly authorized); or does not meet the requirements of any inspection, reference standard, test, or approval referred to in the Contract Documents; or has been damaged.

DESIGN STANDARDS. "Design Standards” means the current standards compiled by GSD, either as a Design Manual or conveyed by the GSD Representative, for use by the DESIGNER in the basis of design. The manual provides a listing of preferred materials and equipment for use in school construction. It is to be used as a guide in the basis of design and during construction of the Work.

DESIGNER. Designer means a person or entity that is lawfully licensed to practice architecture and/or engineering (including but not limited to interior design and landscape design), or other unlicensed design professional as designated by GSD, and is referred to throughout the Contract Documents as if singular in number. The term Designer is identified by a Contractual Agreement that includes subconsultants as part of the service. For projects where no Designer is hired by GSD, the references in the General Conditions to Designer shall be deemed to refer to GSD as practicable.

DESIGNER’S SUPPLEMENTAL INSTRUCTIONS

(DSI). “Designer’s Supplementary Instructions” or “DSI” means order minor changes in the Work not involving adjustment in the Contract Price or extension of the Contract Time and not inconsistent with the intent of the Contract Documents.

DRAWINGS. The "Drawings" are the graphic and pictorial portions of the Contract Documents prepared by the Designer or Owner, wherever located and whenever issued, showing the design, location, and dimensions of the Work; and, which generally include the drawings, elevations, sections, details, schedules and diagrams.

FLCC. “FLCC” is the Fixed Limit of Construction Cost and shall not be exceeded unless Owner gives approval to do so prior to a Change Order or Work being performed. The FLCC includes the GMP, as defined below.

GMP. “GMP” or Guaranteed Maximum Price” is the final price that the CM/GC agrees to accept as payment in full for performance of the Project and the CM/GC Agreement, and is provided by the CM/GC in response to the construction drawings and specifications produced by the Designer. The GMP includes all fees and percentages required by this RFP, including the CM/GC’s Management Fee, all General Conditions including labor and materials, cost of subcontracts, the CM/GC’s Contingency, and all Work as required in the RFP, the CM/GC Agreement, and the Project Definitions Documents. The GMP shall not exceed the FLCC.

GSD. “GSD” means Granite School District, as established pursuant to Utah law. Unless the context requires or is noted otherwise, GSD is the “Owner”.

GSD REPRESENTATIVE. “GSD Representative” means the person directly assigned by Granite School District to work with the Contractor as Project Manager pursuant to SECTION 2.1.1.

Unless the context requires otherwise, the “GSD Representative” is the “Owner’s Representative.”

INSPECTION. The word “inspection” or its derivatives shall mean a review of the Project, including but not limited to a visual review of the Work completed to date to ascertain if the Work is in accordance with the Contract Documents, including all applicable building codes and construction standards.

MODIFICATION. A "Modification" is (1) a Change Order, (2) a Construction Change Directive, or (3) a Designer’s Supplemental Instruction (DSI). The Contract may be amended or modified only by a

Modification, or by other written amendment executed by both Owner and Contractor expressly stating its intent to amend or modify the Contract.

NOTICE TO PROCEED. A "Notice to Proceed" is a document prepared by Owner and sent to Contractor, and by its terms authorizes Contractor to commence Work, or a portion of the Work, on the Project. It is deemed issued upon being sent by Owner to the Contractor's specified address within the Bid.

OWNER. "Owner" or pronoun used in place thereof, means GSD (Granite School District.)

PARTIAL UTILIZATION. "Partial Utilization" means placing a portion of the Work in service for the purpose or use for which it is intended (or a related purpose) before reaching Substantial Completion for all the Work. Such partial utilization does not constitute “Substantial Completion.”

PRECONSTRUCTION PHASE. “Preconstruction Phase” means the period commencing upon full execution of a CM/GC Agreement by the Parties and ending upon the commencement of the Construction Phase. This phase includes, but is not limited to, design meetings, estimating, cost reconciliation meetings and cost control, schedule development, and drawing and constructability reviews, and all other requirements detailed in the applicable Article of the CM/GC Agreement.

PROJECT. The "Project" means the total construction, of which the Work performed under the Contract Documents may be the whole or a part, and which may include construction by Owner or by separate contractors.

PROJECT MANUAL (for Construction). The "Project Manual" is the written volume assembled for the Work and may include the bidding requirements, instructions for bidders, General Conditions and Supplementary General Conditions of the Contract, Specifications, and sample forms.

PROPOSAL REQUEST OR PR. A “Proposal Request” or “PR” is a submission to the

Contractor for the purposes of seeking a proposal in order to resolve an issue as part of the Change Order or Contract Modification process.

PROPOSED CHANGE ORDER OR PCO. A

“Proposed Change Order” or “PCO” is an informal request by the Contractor filed with the GSD Representative, in an effort to commence the Contract Modification Process. It shall not be considered a “Claim.” The PCO may be related to any potential, or actual delay, disruption, unforeseen condition or materials, or any other matter for which the Contractor intends to seek additional compensation or time.

REQUEST FOR INFORMATION OR RFI. A

“Request for Information” or “RFI” is any request filed by the Contractor with the Designer seeking information, direction or clarification related to the Contract Documents, plans or specifications.

SAMPLES. "Samples" mean physical examples which illustrate materials, equipment, or workmanship, and establish standards by which the Work will be judged.

SHOP DRAWINGS. "Shop Drawings" means drawings, diagrams, schedules, and other data specially prepared for the Work by Contractor or a Subcontractor, Sub - Subcontractor, manufacturer, supplier, or distributor of any tier to illustrate some portion of the Work.

SPECIFICATIONS. The "Specifications" are that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards, workmanship for the Work, and performance of related systems and services.

SUBCONTRACTOR. "Subcontractor" means the person or entity that has a direct contract with Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors retained by Owner.

SUBMITTAL. “Submittal” means shop drawings, diagrams, engineering and product data, and/or other information furnished by Contractor to illustrate conformance to the Specifications for the Work or a portion of the Work.

SUBSTANTIAL COMPLETION. "Substantial Completion" is the date certified by GSD in accordance with SECTION 9.6 SUBSTANTIAL COMPLETION and means the date the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that Owner can occupy and utilize the Work for its intended use and any lack of completion or performance does not unreasonably interfere with the ability of Owner to so occupy and utilize the Work. A final Certificate of Occupancy, where applicable, shall be required to be issued in order for the Work to be considered Substantially Complete unless the failure or unreasonable delay of such issuance is for reasons not attributable to Contractor. Notwithstanding the issuance of a Certificate of Occupancy, an unreasonably high number of “punch list” items (items not in conformance with Contract Document requirements), shall result in a determination that Substantial Completion has not occurred. The determination that the Work is Substantially Complete shall be in the sole discretion of GSD.

SUB-SUBCONTRACTOR. A "Sub-Subcontractor" means the person or entity that has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub - Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub -Subcontractor or an authorized representative of the Sub -Subcontractor. The term "Sub - Subcontractor" does not include the sub -subcontractors of a subcontractor for a separate contractor retained by Owner. Unless the context requires otherwise, the term Sub-Subcontractor includes all material suppliers and vendors who directly or indirectly support the Work.

SUPPLEMENTARY GENERAL CONDITIONS.

"Supplementary General Conditions" means the part of the Contract Documents which amends or supplements these General Conditions.

WORK. The term "Work" means the Preconstruction Services and the Construction Phase Work required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by Contractor to fulfill Contractor's obligations. The Work may constitute the whole or a part of the Project.

1.2 CONSTRUCTION OF CONTRACT

DOCUMENTS, VENUE

1.2.1 APPLICABLE LAWS. The applicable

laws and regulations of the State of Utah, as well as any applicable local laws and regulations not superseded by State law, shall govern the execution of the Work embodied in the Contract Documents as well as the interpretation of the Contract Documents.

1.2.2 CAPITALIZATION. Terms capitalized

in these General Conditions include those which are (1) specifically defined, (2) the title of numbered articles and identified references to Paragraphs, Subparagraphs and Clauses in the document, or (3) the titles of documents published by the American Institute of Architects.

1.2.3 INTERPRETATION. In the interest of

brevity the Contract Documents frequently omit modifying words such as "all" and "any" and articles such as "the" and "an", but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement.

1.2.4 VENUE. In case of any dispute which

may arise under the Contract Documents, the place of venue shall be in the County of Salt Lake, Utah, unless otherwise agreed to by all the parties.

1.2.5 INTENT AND HIERARCHY. The

Contract Documents should be read as a whole, and wherever possible, the provisions should be construed in order that all provisions are operable.

The intent of the Contract Documents is to include all items necessary and incidental for the proper execution and completion of the Work by Contractor. The Contract Documents are complementary, and what is required by one Document or provisions thereof shall be as binding as if required by all the Documents or provisions thereof. Performance by Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from the Contract Documents as being necessary to produce the intended results. In case of an irreconcilable conflict between provisions within a Contract Document or between Contract Documents, the following priorities shall govern as listed below:

(1) A particular Modification shall govern over all

Contract Document provisions or Modifications issued prior to said particular Modification.

(2) A particular Addendum shall govern over all other Contract Document provisions issued prior to said particular Addendum. Subsequent Addenda shall govern over prior Addenda.

(3) The Supplementary General Conditions shall govern over these General Conditions.

(4) These General Conditions shall govern over all other Contract Documents except for the Supplementary General Conditions, Addenda, and Modifications.

(5) The Drawings and Specifications shall not govern over any of the immediately preceding documents.

(6) In case of a conflict or ambiguity within the same level of hierarchy described above, Owner shall have the right to select the most stringent requirement.

1.2.6 CONFLICT RESPONSIBILITY.

Contractor shall comply with the provisions of

SUBPARAGRAPH 3.1 REVIEW OF CONTRACT

DOCUMENTS AND FIELD CONDITIONS BY

CONTRACTOR set forth below regarding review of the Contract Documents and field conditions by Contractor.

1.2.7 SEPARABILITY. The invalidity of any

part, paragraph, subparagraph, phrase, provision, or aspect of the Contract Documents shall not impair or affect in any manner the validity, enforceability or effect of the remainder of the

1.2.8 DIVIDING WORK AND CONTRACTOR

REPRESENTATION. Organization of the specifications into division, sections and articles, and arrangement of Drawings, shall not control Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. Contractor represents that the Subcontractors and Sub- Subcontractors engaged, or to be engaged for the Work, are and will be familiar with the requirements for performance by them of their obligations.

1.2.9 CONSTRUCTION OF WORDS. Unless

otherwise stated in the Contract Documents, words which have well known technical or construction industry meanings shall be construed as having such recognized meanings. Unless the context requires otherwise, all other technical words shall be construed in accordance with the meaning normally established by the particular, applicable profession or industry. All other words, unless the context requires otherwise, shall be construed with an ordinary, plain meaning.

1.3 OWNERSHIP AND USE OF DESIGNER’S

DRAWINGS, SPECIFICATIONS AND OTHER

DOCUMENTS.

1.3.1 IN GENERAL. All Drawings, Specifications and other documents prepared by the Designer are, and shall remain, the property of either Owner or the Designer, as provided in the Designer’s Agreement, and such owner shall retain all common law, statutory and other reserved rights with respect thereto. Said documents were prepared and are intended for use as an integrated set for the Project which is the subject of this Contract. They shall not be modified or used on any other project without the prior written consent of Owner and Designer. Any such non-permissive use or modification by Contractor, Contractor's Subcontractors at any tier, or anyone for whose acts Contractor is liable, shall be at Contractor's sole risk. Contractor shall hold harmless and indemnify Owner and Designer, and their separate contractors and consultants, from and against any and all claims, actions, suits, costs, damages, loss, expenses and/or attorney fees arising out of such non-permissive use or modification by Contractor.

Contractor, Subcontractors and Sub- Subcontractors are granted a limited license to use and reproduce applicable portions of the Drawings, Specifications, and other documents prepared by the Designer appropriate to and solely for use in the execution of their Work under the Contract Documents. All copies made under this license shall bear the statutory copyright notice, if any, shown on the Drawings, Specifications, and other documents prepared by the Designer. Submittals or distributions necessary to meet official regulatory requirements or for other purposes relating to completion of the Project are not to be construed as a publication in derogation of any copyright or other reserved rights.

ARTICLE 2. GSD

2.1 INFORMATION AND SERVICES REQUIRED

OF GSD

2.1.1 PROJECT MANAGER. GSD shall

designate a Project Representative authorized to act on GSD's behalf with respect to the Project. GSD or such authorized representative shall render decisions within a reasonable time pertaining to documents submitted by the Designer and/or Contractor in order to avoid a compensable delay in the orderly and sequential progress of the Project.

2.1.2 SPECIALISTS AND INSPECTORS.

GSD will assign an inspector or specialist to note deviations from, or necessary adjustments to, the Contract Documents or to report deficiencies or defects in the Work. The inspector or specialist's activities in no way relieve the Designer or Contractor of the responsibilities set forth in the

2.1.3 SURVEYS AND LEGAL DESCRIPTION.

GSD shall furnish surveys describing known physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. Contractor shall review this information, including the surveys and any provided soils tests, and compare such information with observable physical conditions and the Contract Documents.

2.1.4 PROMPT INFORMATION AND

SERVICES. Upon receipt of a written request from Contractor, information or services under GSD's control shall be furnished by GSD with reasonable promptness to avoid delay in orderly progress of the Work.

2.1.5 COPIES OF DRAWINGS AND PROJECT

MANUALS (FOR CONSTRUCTION). Unless otherwise provided in the Contract Documents, Contractor will be furnished, free of charge, such copies of Drawings and Project Manuals (for construction) as are reasonably necessary for execution of the Work.

2.1.6 OTHER DUTIES. The foregoing are in

addition to other duties and responsibilities of GSD enumerated herein and especially those in respect to ARTICLE 6 CONSTRUCTION BY GSD OR BY

SEPARATE CONTRACTORS, ARTICLE 9 PAYMENTS

AND COMPLETION, and ARTICLE 11 INSURANCE

AND BONDS.

2.1.7 NO REPRESENTATIONS OR

WARRANTIES. Upon Contractor's written request, GSD shall provide Contractor with any drawings of the site of the Work in GSD's possession, insofar as they relate to the Work to be rendered hereunder.

Contractor shall review such information, including any provided surveys and soils tests, and compare such information with observable physical conditions and the Contract Documents.

The Contract Price has been developed by Contractor after review of existing drawings, site inspections of the site of the Work, discussions with Subcontractors, equipment suppliers and others, and the development and/or review of such other information and data as Contractor has deemed prudent. Contractor agrees that information provided by GSD in connection with the Project is for informational purposes only and is not a representation or warranty that such information is accurate or correct, and that Contractor is relying on its own investigation and experience in entering into this Agreement.

ARTICLE 3. CONTRACTOR

3.1 REVIEW OF CONTRACT DOCUMENTS AND

FIELD CONDITIONS BY CONTRACTOR

3.1.1 REVIEWING CONTRACT

DOCUMENTS, INFORMATION, REPORTING

ERRORS, INCONSISTENCIES OR OMISSIONS.

Contractor represents and warrants by submission of a Proposal that Contractor has carefully examined the Contract Documents, any soil test reports, drainage studies, geotechnical or other reports and the site of the Work, and that from Contractor’s own investigations, has satisfied itself as to the nature and location of the Work, the character, quality, and quantity of surface and subsurface materials likely to be encountered, the character of equipment and other facilities needed for the performance of the Work, the general and local conditions, and all other materials which may in any way affect the Work or its performance.

Contractor shall carefully study and compare the Contract Documents with each other and other information furnished by GSD and Designer pursuant to SECTION 2.1 hereof and shall promptly report to GSD and Designer errors, inconsistencies or omissions discovered. Contractor shall not be liable to GSD or Designer for damage resulting from errors, inconsistencies or omission in the Contract Documents, unless Contractor recognized or should have recognized such error, inconsistency or omission and Contractor failed to report such to the Designer. If Contractor performs any construction activity without such notice to the Designer and resolution of the error, inconsistency or omission, Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction

3.1.2 FIELD CONDITIONS. Contractor shall

take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor, or information which a Contractor of ordinary skill and expertise for the type of Work involved would have known, before commencing activities. Errors, inconsistencies or omissions discovered shall be immediately reported to the Designer and GSD. If Contractor performs any construction activity without such notice to the Designer and GSD and resolution of the error, inconsistency or omission, Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.

Contractor shall not be entitled to any additional time or compensation for Contractor’s failure to visit the site, or for any additional Work caused by Contractor’s failure to carefully study, review, and compare site conditions and Contract Documents prior to execution of the Work.

3.1.3 PERFORM IN ACCORDANCE WITH

DOCUMENTS AND SUBMITTALS. Contractor shall perform the Work in accordance with the Contract Documents and submittals approved pursuant to SECTION 3.10 hereof.

3.1.4 PERFORMANCE TO PRODUCE THE

COMPLETE SYSTEM AND INTENDED RESULTS.

To the extent required by, or reasonably inferable from, the Contract Documents, Contractor’s performance shall require that upon completion of the work, the system at issue functions for its intended use (e.g., HVAC work is not complete unless and until the system, related software, and software programming has been tested and determined to be functioning properly within system specifications).

3.1.5 PRIOR TO CONSTRUCTION.

Prior to performing any Work, and only if applicable, Contractor shall locate all utility lines as shown and located on the plans and specifications, including telephone company lines and cables, sewer lines, water pipes, gas lines, electrical lines, including, but not limited to, all buried pipelines and buried telephone cables, and shall perform any Work in such a manner so as to avoid damaging any such lines, cables, pipes, and pipelines. In addition, Contractor shall independently determine the location of same.

Contractor shall be responsible for any damage done to such utility lines, cables, pipes and pipelines during its Work, and shall be responsible for any loss, damage, or extra expense resulting from such damage. Repairs shall be made immediately to restore all service. Any delay for such break shall be attributable to Contractor.

3.1.6 GSD’S INDEMNIFICATION. GSD

shall be entitled to deduct from the Contract Price amounts paid to the Designer for the Designer to evaluate and respond to Contractor's requests for information, where such information was available to Contractor from a careful study and comparison of the Contract Documents, field conditions, GSD provided information, Contractor-prepared coordination drawings, or prior Project correspondence or documentation. If, in the reasonable opinion of Designer, Contractor does not make reasonable effort to comply with any of the above requirements of the Contract Documents and this causes Designer or its consultants to expend an unreasonable amount of time in the discharge of the duties imposed by the Contract Documents, then Contractor shall bear the cost of compensation for the Designer's additional services made necessary by such failure.

3.2 SUPERVISION AND CONSTRUCTION

PROCEDURES

3.2.1 SUPERVISION AND CONTROL.

Contractor shall supervise and direct the Work, using Contractor's best skill and attention.

Contractor shall be solely responsible for and have control over the construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract.

3.2.2 RESPONSIBILITY. Contractor shall be

responsible to GSD for acts and omissions of Contractor's employees, Subcontractors, Sub - Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with or on behalf of Contractor.

3.2.3 NOT RELIEVED OF OBLIGATIONS.

Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Designer in the Designer's administration of the Contract, or by tests, inspections or approvals required or performed by GSD or persons other than Contractor.

3.2.4 INSPECTIONS AND APPROVALS.

(1) Contractor is responsible for requesting inspections for various stages and portions of the Work required under the Contract Documents in a timely manner.

(2) If the Contract Documents require an inspection or approval of the Work by any public authority, Contractor shall timely request such inspection or approval to be performed in accordance with ARTICLE

12. Except as provided in ARTICLE 12, work shall not proceed without any required inspection and the associated authorization to proceed. Contractor shall promptly notify GSD if the inspector fails to appear at the site.

3.3 LABOR AND MATERIALS

3.3.1 PAYMENT BY CONTRACTOR. Except

as otherwise expressly provided in the Contract Documents, Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, winterization, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

3.3.2 PROPOSED SUBSTITUTIONS

(1) This specification was prepared under the direction of the Owner with regard to adhering to their established Design Standards.

Although the items are the Owner's preferred choice, suppliers may bid other manufacturers as proposed substitutions for the GSD's review.

The use of brand names in this specification manual is not intended to limit bidding competition, but to establish a level of quality, performance and characteristics desired.

(2) Deadline for Proposed Substitution Requests will be 72 Hours prior to Bid Time.

(3) Note that substitutions for specified/approved products/manufacturers will not be reviewed if submitted as a part of submittal process.

(4) Manufacturers other than Basis of Design Manufacturers shall provide products or systems that meet or exceed Basis of Design products or systems. A list of approved, if any, substitutions will issued in an Addendum 48 Hours prior to Bid Time.

3.3.3 DISCIPLINE AND COMPETENCE.

Contractor shall enforce strict discipline and good order among Contractor's employees and other persons performing under the Contract Documents.

Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.

3.3.4 LOCAL PREFERENCE. Contractor

shall give preference to local material suppliers, subcontractors and labor, both skilled and unskilled, including workers with trucks and equipment, to the extent that such local material suppliers, subcontractors and labor are available, competent and competitive in price to non-local material suppliers, subcontractors and labor.

3.4 WARRANTY

3.4.1 IN GENERAL. In addition to the

provisions of SECTION 12.2 hereof, the following warranties shall apply: (1) Contractor warrants to GSD that materials and equipment furnished under the Contract will be of good merchantable quality and new, except to the extent otherwise required or expressly permitted by the Contract Documents;

(2) Contractor also warrants to GSD that the Work will be free from defects not inherent in the quality required or permitted and that the Work will conform with the requirements of the Contract Documents. Work not conforming to said requirements, including substitutions not properly approved, may be considered Defective Work at GSD’s option.

3.4.2 EXCLUSION. Unless due to the

negligent or intentional act or omission of Contractor or those under Contractor's control, or as otherwise stated in the Contract Documents, Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage.

3.4.3 FURNISH EVIDENCE ON REQUEST. If

requested by the Designer or GSD, Contractor shall furnish satisfactory evidence as to the kind, quality and quantity of materials and equipment.

3.4.4 WRITTEN WARRANTIES. Contractor

shall furnish GSD with a written warranty in accordance with this SECTION, and Contractor shall secure all written guarantees and/or warranties called for in the Contract Documents. Contractor shall require each subcontractor to guarantee and warrant such subcontractor's respective work for a period of one year from the date of Substantial Completion of the Work, or for such longer periods as might be provided in the Contract Documents.

3.5 ALLOWANCES

3.5.1 IN GENERAL. Contractor shall

include in the Contract Price all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as GSD may direct, but Contractor shall not be required to employ persons or entities to whom Contractor has reasonable objection.

3.5.2 USAGE OF ALLOWANCE. Unless

otherwise provided in the Contract Documents,

(1) allowances shall cover the cost to Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts;

(2) Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Price but not in the allowances;

and

(3) whenever costs are more than or less than allowances, the Contract Price shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (l) the difference between actual costs and the allowances under SECTION 3.16.2.1 and (2) changes in Contractor's costs under SECTION 3.16.2.2.

3.5.3 PER GSD’S SPECIFICATIONS.

Materials and equipment under an allowance shall be selected by GSD with reasonable promptness.

3.6 PERMITS, FEES, NOTICES, LABOR AND

MATERIALS

3.6.1 PERMITS AND FEES. Unless required

in the Supplementary General Conditions or an Addendum, it will not be necessary for Contractor to obtain or pay for local building permits, plan check fees, electrical permits, plumbing permits, connection fees, or impact fees, nor will it be necessary to pay fees for inspections pertaining thereto.

3.6.2 COMPLIANCE WITH PUBLIC

AUTHORITIES, NOTICES. Contractor shall comply with and give notices required by laws, ordinances, resolutions, rules, regulations and lawful orders of public authorities bearing on the performance of the Work.

3.6.3 CORRELATION OF CONTRACT

DOCUMENTS AND ENACTMENTS. It is not Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, resolutions, building codes, and rules and regulations.

Notwithstanding this, if Contractor observes, or if such is readily observable to a Contractor of ordinary skill and expertise for the type of Work involved, that a portion of the Contract Documents is at variance therewith, Contractor shall promptly notify the Designer and GSD in writing, and necessary changes shall be accomplished by appropriate Modification.

3.6.4 FAILURE TO GIVE NOTICE. If

Contractor or any Subcontractor thereof performs Work without complying with the requirements of this ARTICLE 3.6 hereinabove, Contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .