7-Farwell Park Wayne County Improvements - Bid Form.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Farwell Park Improvement State and local contract opportunity
- Solicitation number
- 542967
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a bid form for the Farwell Park Wayne County Improvements project issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department. The project involves the installation of site amenities including 6-foot benches on concrete pads (6 units), 2-unit picnic table sets on concrete pads (3 units), demolition and replacement of an existing picnic shelter concrete pad (1,150 square feet), 4-inch concrete pad installation (1,150 square feet), 6-foot picnic table replacements (4 units), and BBQ amenities on a concrete pad (1 unit). The contract is for a two-year performance period and requires bidders to submit pricing through an Excel format bid form with calculated total cost fields.
The bid form requires contractors to provide pricing for all hard costs, soft costs including mobilization, site restoration, layout and field survey, bonds and insurance, general conditions, and miscellaneous close-out work. An allowance of $10,000 is included for additional services as a fixed fee, resulting in a total base bid amount of $10,000. Bidders must also complete unit rate pricing for potential future work including engineered wood fiber surfacing, poured-in-place surfacing, topsoil, and topsoil seed/mulch applications, with all pricing including labor, equipment, and materials. The bid form requires submission of fully burdened hourly labor rates for construction management personnel including project manager, superintendent, engineer, estimator, accounting, clerical, journeyman, and laborer positions. Space is provided for bid alternates, though none are specified in this form.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 6-RFP 542967 Farwell PARK IMPROVEMENT.pdf | ||
| 10-Attachment F-2 - Payment Bond.pdf | ||
| 9-Attachment A - Respondent Questionnaire RFP.pdf | ||
| 5-Attachment F-1 - Performance Bond.pdf | ||
| 3-Attachment D-1 Required Forms Affidavits.pdf | ||
| 4-Attachment D-2 - Conditions of Award.pdf | ||
| 1-Attachment E - Professional Service Contract Sample.docx | DOCX document | |
| 8-Attachment B - Respondent Proposal Introduction and Solution Approach.pdf | ||
| 2-Equalization Credit Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| FARWELL PARK WAYNE COUNTY IMPROVEMENTS - Bid Form | ||||||
| DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL | ||||||
| BIDDING CONTRACTOR: | ||||||
| ITEN | COST | QTY | UNIT | TOTAL BID COST | All Fees/Bonds/Insurance/GC's listed under Soft Costs | |
| 1 | PARK AMENITIES | $ - 0 | ||||
| a | 6' Bench on Concrete Pad | $ - 0 | 6 | EA | $ - 0 | |
| b | (2) 6' Picnic Tables on Concrete Pad | $ - 0 | 3 | EA | $ - 0 | |
| 2 | Existing Picnic Shelter | $ - 0 | ||||
| a | Demo Concrete Pad | $ - 0 | 1150 | SF | $ - 0 | |
| b | 4" Concrete Pad | $ - 0 | 1150 | SF | $ - 0 | |
| c | 6' Picnic Table Replacements | $ - 0 | 4 | EA | $ - 0 | |
| d | BBQ Amenities on Concrete Pad | $ - 0 | 1 | EA | $ - 0 | |
| SOFT COSTS | ||||||
| 3 | Site Restoration | $ - 0 | $ - 0 | |||
| 4 | Mobilization | $ - 0 | $ - 0 | |||
| 5 | Layout & Field Survey | $ - 0 | $ - 0 | |||
| 6 | Bonds & Insurance | $ - 0 | $ - 0 | |||
| 7 | General Conditions | $ - 0 | $ - 0 | Fixed duration cost. To include staffing | ||
| 8 | Miscellaneous & Close-Out Work | $ - 0 | $ - 0 | |||
| ALLOWANCES | All fees/Bonds/Insurance to be calcualted for Allowances below under soft costs | |||||
| 9 | Additional Services | $ 10,000.00 | $ 10,000.00 | Fixed Fee | ||
| TOTAL BASE BID | $ 10,000.00 |
| BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE) | |
| L1 | 1. Alternate 1 - |
| L2 | 2. Alternate 2 - |
| L3 | |
| L4 |
BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED
| UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID | |||
| Description | Value | Unit | |
| ENGINEERED WOOD FIBER (EWF), SURFACING | $ - 0 | 100 SF @ 12" DEPTH PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| POURED-IN-PLACE (PIP), SURFACING | $ - 0 | PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS - | |
| TOPSOIL | $ - 0 | 50 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| TOPSOIL SEED/MULCH | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS |
| Construction Manager's Project Personnel | *Hourly Rate* | *Hourly Rate* | *Provide Fully Burdened Labor Rates* | |
| Project Manager | $0.00 | $0.00 | ||
| Project Superintendent | $0.00 | $0.00 | ||
| Project Engineer | $0.00 | $0.00 | ||
| Project Estimator | $0.00 | $0.00 | ||
| Accounting | $0.00 | $0.00 | ||
| Clerical | $0.00 | $0.00 | ||
| Journeyman for General Contractor | $0.00 | $0.00 | ||
| Laborer | $0.00 | $0.00 | ||
| Others: | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .