7. Robie Creek G-Z georeferenced_CAM.pdf

PDF 2 MB Posted

Attached to
Robie Creek G – Z STEWARDSHIP IRSC – Region 4 , Boise National Forest, Mountain Home Ranger District, Idaho
Solicitation number
12363N24Q4121
Issued by

About this file

This document is a Request for Quotes (RFQ) for the Robie Creek G – Z Stewardship IRSC contract on the Boise National Forest, Mountain Home Ranger District in Idaho. The contract will be awarded under the Stewardship Authority Section 604 of Public Law 108-148, as amended, to achieve land management goals and meet local/rural community needs. The contract scope includes completing an implementation plan, road analysis, timber removal, sawtimber/miscellaneous product extraction, sub-merchantable thinning, non-commercial thinning, and mastication treatments. The contract period of performance is through December 31, 2029. Quotes are due by July 2, 2024. The NAICS code is 115310 for Forestry Support Services, with a size standard of $34M. A site visit is scheduled for May 30, 2024 at the Boise National Forest Supervisor's Office. Contract questions should be directed to Kasandra Meyer.

View the file

Other files

File Type Posted
A002SF30_Robie Creek G-Z.pdf PDF
A001SF30_Robie Creek G-Z.pdf PDF
7. A001Robie Creek G-Z georeferenced_CAM.pdf PDF
A001RobieCreek_LayerFiles.zip ZIP file
Attachment 13 - Cruise Sheets.pdf PDF
Contractors_ Q_A Robie Creek G-Z.pdf PDF
8. ID-SCA WD 1995-0228v64 12.26.23.pdf PDF
7c. CSAM_Lidar_RobieCreekG-Z_20240429_AnsiD.pdf PDF
Attachment 2 - Sinker Creek - Boise Ridge EA.pdf PDF
3. Robie G-Z IRSC Appendix B_Timber Specs.pdf PDF
9. WD DBA#20240092.pdf PDF
Attachment 11 - 2409.12 Chapter 10 R4 Supp. Principles of Measuring Trees.pdf PDF
Attachment 3 - SCBR Supplemental Information Report.pdf PDF
5. Robie Creek G-Z Traffic Control Plan.pdf PDF
Attachment 4 - Robie Creek G-Z Silvicultural Prescriptions.pdf PDF
Attachment 9 - FSH 2409.12 Chapter 40 Timber Cruising - Copy.pdf PDF
Attachment 8 - Sample Recon Cruise Instructions - Copy.pdf PDF
7a. CSAM_Contour_Lidar_RobieCreekG-Z_20240429_AnsiD.pdf PDF
6. Robie Creek G-Z IRSC Fire Plan.pdf PDF
1. Robie G-Z IRSC Solicitation.pdf PDF
Attachment 6 - Robie Creek G-Z Harvest Card Template.pdf PDF
Attachment 5 - Marking Directions.pdf PDF
4. Robie Creek G-Z Appendix C-Road Mtc.pdf PDF
2. Robie G-Z IRSC Appendix A_Specs.pdf PDF
Attachment 10 - 2409.12 Chapter 10 Principles of Measuring Trees.pdf PDF
Attachment 12 - Basic Cruising Guide.pdf PDF
Robie Creek G-Z Industry Meeting Notes.pdf PDF
Attachment 1 - Boise Tracer Paint Accountability Plan.pdf PDF
7b. CSAM_Contour_RobieCreekG-Z_20240429_AnsiD Contour.pdf PDF
Attachment 7 - FSH 2409.12 Chapter 50 Area Determination Excerpt 1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

E

N

E

04A

27 26

28 25

24 19

275K

275G µ

Stewardship Items

Mandatory Item #1 - Implementation Plan of Contract Area Mandatory Item #2 - Proposed Temporary Road Locations Optional Items #7 & #9 - Cut and Remove Included Timber & Submerchantable Thinning Optional Item #8 - Mastication Optional Item #10 - Non-commercial Thinning

Protected Improvements

Protected Improvement: ATV Trail (50" or less) Protected Improvement: Non-Motorized Trail

Transportaion Information

Contract Area Roads National Forest System Roads Hauling Prohibited - C5.12#

General Contract Information

Special Measures Area (SMA1) - Solicitation Section #24 Special Measures Area (SMA2) - Solicitation Section #24 Township Section Perennial Stream

Legend

0 0.1 0.2 0.3 0.40.05 Miles

Prepared by: Timber Program Specialist Mountain Home Ranger District Boise National Forest Boise, Idaho Produced: 4/29/2024 By: jaclynmitchell Projection: UTM 11 N, NAD83 File: T:\FS\NFS\Boise\Project\Implementation\SouthZone\Implementation_Projects\D1_RobieCreek_25_TimberSale\Timber\RobieCreek_25_TimberSale_Timber.aprx

Robie Creek G-Z IRSC Contract Area Map

Boise National Forest Mountain Home Ranger District

T. 4 N., R. 3 E., Sec 14-16, 21-27

DRAFT

£¤20

¬«44

§̈¦184

§̈¦84 ¬«21

¬«21

¬«21

UV374

UV297

UV374

UV374

UV82

UV297

UV82

UV364

UV261

UV260

UV275

UV297

Inset Legend Contract Area Boundary

Special Measures Area (SMA1)

Proposed Haul Route

Highway

Hauling Prohibited

BOISE

Inch : Feet 1:8,000

P

P

P

P

P

P P

P

P

P

P

P

P

P

P

P

P

P

SMA1

297 366

P

P

P

File details come from the government source that posted it. Updated .