7_DID DI-SESS-81965.pdf
Data Item Description PDF 86 KB Posted
- Attached to
- FIRE ALARM SERVICES
- Solicitation number
- N6426724Q0083
About this file
This document is a Data Item Description (DID) that outlines the requirements for a Provisioning Technical Documentation Submission Schedule (PTDSS) related to the acquisition of cutters and boats for the U.S. Coast Guard. The PTDSS establishes a schedule of important actions and completion dates in the provisioning process, including a checklist of events to monitor. It requires the contractor to provide a list of PTD submissions with associated Ship Work Breakdown Structure (SWBS) components and proposed submission dates aligned with the contract's delivery schedule. The PTDSS must also include monthly percentage illustrations of planned and completed submittals, as well as a chronicle of major provisioning process events and their completion dates.
The related federal contract opportunity is for fire alarm services, issued by the Department of the Navy Naval Sea Systems Command. This is a combined synopsis/solicitation for commercial items, with an all-or-none requirement. Offerors must be registered in SAM, and quotes are due by the specified response date. The award will be made to the responsible offeror whose quote is most advantageous to the government based on the evaluation criteria.
View the file
Other versions and copies of DI-SESS-81965
| File | Revision | Posted | Attached to |
|---|---|---|---|
| 7_DID DI-SESS-81965.pdf Same revision and size as this file | Revision not stated | Fire Alarm Services |
Who attaches DI-SESS-81965
| Agency | Files |
|---|---|
| Department of the Navy Naval Sea Systems Command | 2 |
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: PROVISIONING TECHNICAL DOCUMENTATION SUBMISSION SCHEDULE
(PTDSS)
Number: DI-SESS-81965 Approval Date: 20140528
AMSC Number: N9474 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: CG/Asset Project Office (CG-9APO)
Applicable Forms: N/A
Use/relationship:
The Provisioning Technical Documentation Submission Schedule (PTDSS) establishes the schedule of important actions and completion dates in the provisioning process and includes a checklist of events schedules in the provisioning process that are used to monitor such events.
PTDSS are used to schedule various actions in the provisioning process that are interdependent, since a delay in one area can have a serious cumulative effect on the schedule for making concurrent delivery of repair parts and equipment.
Application/Interrelationship
This Data Item Description (DID) contains the format, intended use information, and content preparation instructions for the data product generated by the specific and discrete task described in the solicitation or contract.
This DID is applicable to all Coast Guard contracts for the acquisition of cutters and boats and should be tailored appropriately to each program.
Requirements:
1. Format. The PTDSS shall be in Contractor’s format.
2. Content. The PTDSS shall contain a list in chronological order starting with the major events in the provisioning process, established completion dates for each action, listed number of
Provisioning Technical Documentation (PTD) submissions, and the proposed schedule for PTD submission.
2.1.1 The PTDSS shall identify each PTD submission to its Ship Work Breakdown Structure
(SWBS) and component nomenclature. The dates shall be identified and shall take into account the elements of time set forth in the contract for delivery of end item equipment, data product
Contract Data Requirements List (CDRL) deliverables, and the Provisioning Performance
Schedule (PPS) requirements.
2.1.2 The PTDSS shall contain outlined monthly percentage illustrations planned and ultimately, completed submittals.
Source: http://assist.dla.mil -- Downloaded: 2024-02-21T00:54Z Check the source to verify that this is the current version before use.
DI-SESS-81965
2.1.3 The PTDSS items that were mutually agreed to shall be identified.
2.1.3 Source documents such as specifications, drawings, master erection schedules and allowance list for similar ships shall be identified in determining the number of PTD submittals.
2.1.4. The PTDSS shall include a chronicle list of the major events in the provisioning process and completion dates for each event.
3. End of DI-SESS-81965.
Source: http://assist.dla.mil -- Downloaded: 2024-02-21T00:54Z Check the source to verify that this is the current version before use.
File details come from the government source that posted it. Updated .