7_DID DI-SESS-81965.pdf

PDF 86 KB Posted

Attached to
Fire Alarm Services Federal contract opportunity
Solicitation number
N6426724Q0196
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Data Item Description (DID) for a Provisioning Technical Documentation Submission Schedule (PTDSS). The PTDSS establishes the schedule of important actions and completion dates in the provisioning process, including a checklist of events used to monitor the provisioning process. The PTDSS identifies each Provisioning Technical Documentation (PTD) submission by Ship Work Breakdown Structure (SWBS) and component nomenclature, and includes planned and completed submittal percentages. The PTDSS is required for all Coast Guard contracts for the acquisition of cutters and boats, and should be tailored appropriately for each program.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm Services, newest first.
File Type Posted
14_Amendment 0002.pdf PDF
14_Amendment 0001.pdf PDF
7_CDRL A004 (Utility Outages)_Redacted.pdf PDF
9_WAGE DETERMINATION.pdf PDF
7_CDRL A003 (ITM)_Redacted.pdf PDF
7_DID DI-MISC-80279A.pdf PDF
7_DID DI-SAFT-82080.pdf PDF
7_Attachment 1 - Product Specs.pdf PDF
7_CDRL A002 (Safety Plan)_Redacted.pdf PDF
7_DID-DI-NDTI-80809B.pdf PDF
N6426724Q0196 - Combined Synopsis Solicitation.pdf PDF
7_CDRL A001 (Maintenance Schedules and Procedures)_Redacted.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: PROVISIONING TECHNICAL DOCUMENTATION SUBMISSION SCHEDULE

(PTDSS)

Number: DI-SESS-81965 Approval Date: 20140528

AMSC Number: N9474 Limitation: N/A

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: CG/Asset Project Office (CG-9APO)

Applicable Forms: N/A

Use/relationship:

The Provisioning Technical Documentation Submission Schedule (PTDSS) establishes the schedule of important actions and completion dates in the provisioning process and includes a checklist of events schedules in the provisioning process that are used to monitor such events.

PTDSS are used to schedule various actions in the provisioning process that are interdependent, since a delay in one area can have a serious cumulative effect on the schedule for making concurrent delivery of repair parts and equipment.

Application/Interrelationship

This Data Item Description (DID) contains the format, intended use information, and content preparation instructions for the data product generated by the specific and discrete task described in the solicitation or contract.

This DID is applicable to all Coast Guard contracts for the acquisition of cutters and boats and should be tailored appropriately to each program.

Requirements:

1. Format. The PTDSS shall be in Contractor’s format.

2. Content. The PTDSS shall contain a list in chronological order starting with the major events in the provisioning process, established completion dates for each action, listed number of

Provisioning Technical Documentation (PTD) submissions, and the proposed schedule for PTD submission.

2.1.1 The PTDSS shall identify each PTD submission to its Ship Work Breakdown Structure

(SWBS) and component nomenclature. The dates shall be identified and shall take into account the elements of time set forth in the contract for delivery of end item equipment, data product

Contract Data Requirements List (CDRL) deliverables, and the Provisioning Performance

Schedule (PPS) requirements.

2.1.2 The PTDSS shall contain outlined monthly percentage illustrations planned and ultimately, completed submittals.

Source: http://assist.dla.mil -- Downloaded: 2024-02-21T00:54Z Check the source to verify that this is the current version before use.

DI-SESS-81965

2.1.3 The PTDSS items that were mutually agreed to shall be identified.

2.1.3 Source documents such as specifications, drawings, master erection schedules and allowance list for similar ships shall be identified in determining the number of PTD submittals.

2.1.4. The PTDSS shall include a chronicle list of the major events in the provisioning process and completion dates for each event.

3. End of DI-SESS-81965.

Source: http://assist.dla.mil -- Downloaded: 2024-02-21T00:54Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .