7) Contractor Environmental Guide_2019.pdf
PDF 2 MB Posted
- Attached to
- Paving IDIQ Federal contract opportunity
- Solicitation number
- FA487721B0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12) SF 30 Amendment 2.pdf | ||
| 5) IDIQ Bid Schedule - fillable 26 Apr.xlsx | XLSX spreadsheet | |
| 10) Q and A LOG.xlsx | XLSX spreadsheet | |
| 11) SF 30 Amendment 1.pdf | ||
| 4) Paving IDIQ Estimate of Quantities.pdf | ||
| 1) Template of Contractor EAL.xls | XLS spreadsheet | |
| 6) DMAFB Design Guide.pdf | ||
| 5) IDIQ Bid Schedule - fillable.xlsx | XLSX spreadsheet | |
| 3) DMAFB Paving IDIQ Specifications.pdf | ||
| Solicitation - FA487721B0004.pdf | ||
| 9) Use of Masks on Military Installations.PDF | ||
| 8) COVID-19 Face Covering Fact sheet.pdf | ||
| 2) WD-AZ20210008 (1 Jan 21).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C ontractor E nvironm ental G uid e
…Protection of the environment...
This Environmental Guide is provided to assist civilian contractors in meeting federal, state, and local environmental regulations while working on Davis-Monthan Air Force Base
15 May 2019
355th Civil Engineer Squadron Environmental Management Office 3775 South Fifth Street Davis-Monthan AFB, 85707 Phone 520 228-7201 Fax 520 228-5205
Contractor Environmental Guide May 2019
Table of Contents
Part 1 Obligation 1
Part 2 Responsibilities 1
Part 3 Summary of Common Environmental Requirements and Contractor Responsibilities 3
3.1. -At Contract Award 3
3.2. -Before Construction/Performance/Demolition/Repair 3
3.3. -During Construction/Performance/Demolition/Repair 9
3.4. -After Construction/Performance/Demolition/Repair (Prior to Project Close-out) 12
Part 4 Emergency Points-of-Contact 13
Appendices
A Guidance for Submission of Safety Data Sheets for Hazmat & Reporting of Hazmat Usage 15
A-1 DMAFB AF EESOH-MIS Contractor Worksheet 16
A-2 DMAFB Contractor Hazardous Material Review (Example) 18
A-3 Contractor Hazardous Material Usage Data 19
B Construction and Demolition (C&D) Debris 20
B-1 C&D Debris Diversion Plan Submittal (Example) 21
C Hazardous, PCB, and Universal Waste Proper Management and Disposal 22
D Investigation Derived Waste (IDW) Proper Management and Disposal 23
E Environmental Management System (EMS) Awareness Level Training Login Instructions 24
E-1 Environmental Management System Awareness Handout 25
F Environmental Management System Most Significant Aspects Awareness Form 27
G Blue Stake/Dig Permit - Civil Engineer Work Clearance Request Form (AF Form 103) 28
H Reserved – (Not Used at This Time) 31
I Air Activity Permit Instructions (Pima County Department of Environmental Quality) 32
J Spill Response - (Hazmat Incident Spill Response Procedures) 33
Part 1 – Obligations
1.1. As a contractor, you are obligated to comply with federal, state, and local environmental regulations, and Davis-Monthan(DM) Air Force Base (AFB) Environmental Management System (EMS) requirements. Some of the environmental issues to be considered while completing your job at Davis- Monthan AFB include:
• Hazardous Material usage & management
• Recovered Materials usage
• Protection of native plants and birds
• Dust control (caused by activities such as land stripping, trenching, sandblasting, etc.)
• Painting or cleaning operations air emissions control
• Stormwater Discharges
• C&D waste recycling / disposal
• Waste management
• Influence on the installation’s most significant environmental aspects (see Appendix F).
1.2. As the prime contractor, you are also obligated to ensure all subcontractors also adhere to environmental regulations.
Part 2 – Responsibilities
2.1. Contractors, subcontractors, and concessionaires are responsible for environmental protection while in the process of executing contracts on Davis-Monthan Air Force Base involving, but not limited to:
• New Construction
• Renovations and major repairs on existing structures or systems
• Demolition/removal of old structures or systems
• Performance of contract maintenance or services
2.2. Environmental regulations will be complied with by all contractors, subcontractors, and concessionaires.
2.3. Pre-work conference: The prime contractor will brief employees and/or subcontractors on environmental regulations and policies as applicable to the project.
2.4. Project sites are subject to inspection by the DM Environmental Office to ensure compliance with environmental regulations and practices.
2.5. Contractors must report spills to the Base Fire Department dial 911 (or 228-3333 from cell phone) when:
• The spill is greater than two feet; or
• The spill is greater than one gallon; or
• The spill is an unknown substance; or
• The spill is on soil or cracked pavement; or
• The spill may create a threat of fire/explosion; or
• The spill may be a risk to personnel.
2.5.1. The Base Fire Department will report these spills to the DM Environmental Office.
2.6. Contractors must report small spills (spill less than two feet in area) to the DM Environmental Office for directions regarding disposal of spill residues (228-5849, 228-4774, or 228-7201). See Appendix J for further instructions on spills.
2.7. Contractors must report all accidents involving Air Force people, property, or equipment damage, and any contractor personnel injured in the performance of the Air Force contract to their contract administer.
2.8. Contractors shall take immediate corrective action to comply with environmental regulations if informed of a violation by the Contracting Office.
2.9. If necessary, appropriate actions will be initiated through Contract Management to correct substandard environmental practices or conditions.
Part 3 – Summary of Common Environmental Requirements and Contractor Responsibilities:
The following is a list of common Contractor responsibilities organized by the step/action which occurs in a typical construction project. This table is not all inclusive of all environmental requirements that could be encountered during a construction project (for instance the removal of underground storage tanks). If further guidance is needed on a specific construction project, please contact the Davis-Monthan Environmental Office at 228-7201.
3.2. At Contract Award
Requirement When required? What is required? Required Submission
Recovered Materials Certification
When the contractor is installing items that must contain recycled material. (carpet, floor tile, park benches, restroom dividers, etc.)
By signing the contract, the contractor certifies that “Recovered Materials” to be used in the project will be at least the amount required by the contract specifications (FAR 52.223-4).
De facto submission by the signing of the contract.
3.3. Before Construction/Performance/Demolition/Repair
Complete Environmental Management System Awareness Level Training
Always unless deemed not applicable by the installation EMS Cross-Functional Team
Complete EMS Awareness Training in Appendix E. This must be completed prior to any work being accomplished on the installation.
Submit a copy of the training certificate and Appendix F to the contract administrator. Contracting Officer will forward copy to 355 CES Environmental
Complete Appendix F
Always unless deemed not applicable by the installation EMS Cross-Functional Team
Complete the EMS Most Significant Environmental Aspects Awareness Form at Appendix F. Turn form in to contract administrator during the pre-performance meeting.
Submit a copy of the completed form to the contract administrator.
Contracting Officer will forward copy to 355 CES Environmental
Protection of Native Plants
Always when land will be disturbed (even if the area is less than one acre)
It is unlawful for any person to destroy, dig up, mutilate, collect, cut, harvest, or take any living native protected plant species without first obtaining required permits, tags, seals, or receipts from the Arizona Department of Agriculture (ADA: Arizona State Statute, Chapter 7 – Arizona Native Plants). Native protected plant species include, but are not limited to: saguaro cactus, barrel cactus, pima pineapple cactus, prickly-pear cactus and many species of agave, cholla, hedgehog, ocotillo, senita and yucca, as well as ironwood, palo verde and mesquite trees.
At least 30 days prior to the start of construction, contact the ADA – Tucson Office (520-628-6317) to apply for a permit/submit Notice of Intent (NOI). ADA fees apply.
The contractor shall contact the DM Environmental Office (228-4035) after obtaining approved permit, tags, seals, receipts and prior to the removal of native plants.
Submit copy of ADA permit to the Contracting Office.
Prior to removal of the native plant for transplanting – the native plant tag and seal must be firmly affixed to each plant.
After transplanting, the tag and seal should be removed from the plant and kept as proof that the plant was legally obtained.
Contracting will forward copy to 355 CES Environmental
Protection of Native Birds and Wildlife
Always when land will be disturbed (even if the area is less than one acre)
It is unlawful to kill, possess, or trade migratory birds, their parts, nests, or eggs (Migratory Bird Act Treaty). Several bird species that are of concern at DMAFB include: Burrowing Owls, Swainson’s Hawks, Cooper’s Hawks, and Great Horned Owls.
The contractor shall contact the DM Environmental Office (228-4035) if any birds are noted to be burrowing/nesting/living within or immediately adjacent to the planned construction area.
If the area is marked with a “Caution - Burrowing Owls” sign, the contractor shall abide by the warnings on the sign and shall contact the Environmental Office (228-4035) to report that construction is planned in the area.
Contact DM Environmental Office (228-4035) to insure a natural resource survey for endangered species has been conducted on the proposed construction site.
If no natural resources survey has been conducted a new survey must be completed before construction can begin.
Requirement When required? What is required? Required Submission
Preservation of Cultural Resources
Required when a building or structure is over 50 years of age, approaching 50 years of age, or was built or used during the Cold War.
Also required when archaeological sites or historic trails are encountered.
The Arizona State Historic Preservation Office (SHPO) is required to review federal projects that may affect historic or archaeological properties (National Historic Preservation Act;
Arizona Historic Preservation Act).
Contact the DM Environmental Office (228-4035) to determine if the building/structure/archaeological site is already classified as an historic site. The DM Environmental Office will contact the Arizona SHPO for assistance.
If no cultural survey has been conducted a new one must be completed before construction can begin.
Hazardous Material Review
Always At least 3 weeks prior to the start of construction, submit anticipated hazardous material usage (e.g., paint, adhesives, sealants, paint remover, refrigerants, pesticides, acids, compressed gases, etc.), a Safety Data Sheets (SDS) for each hazardous material, and a contractor AF-EESOH-MIS worksheet for each hazardous material to be used during the project.
Refer to Appendix A for guidance on the submission anticipated usage, SDSs and contractor AF-EESOH-MIS worksheets.
Submit material usage, SDS(s), and contractor AF- EESOH-MIS worksheet(s) to the Contracting Office.
Contracting office will forward copies of all documents to 355 CES Environmental prior to contract start
Proper Management of Hazardous Materials
Always Follow the “Civilian Contractor Safety/Fire Guide” and common industry good housekeeping practices.
N/A
Asbestos Determination
Prior to renovation or demolition activities
If a project has already been designed (i.e., it is not a design/build and it is not a Indefinite Delivery Indefinite Quantity (IDIQ) project), then DM will inform the contractor of the asbestos determination.
If a project is a IDIQ project or a design/build project, then the contractor is responsible for the asbestos determination as follows:
The contractor must test for asbestos prior to renovation or demolition activities using an EPA accredited Asbestos Building Inspector.
For questions contact PDEQ at 520-243-7400 or visit http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=5 4365 , and http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=6 0142 for further guidance.
Submit a copy of the Asbestos Survey Report to the Contracting Office.
Contracting office will forward a copy of all surveys to 355 CES http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=54365 http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=60142 http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=60142
Requirement When required? What is required? Required Submission
Asbestos Removal/ Disposal
Prior to renovation or demolition activities
If asbestos is present, the Contractor must:
Submit copy of the asbestos demo/abatement plan.
Submit a PDEQ Asbestos NESHAP Notification/ Permit Activity Application for Renovation / Demolition Activities at least 10 days prior to the start of work (permit application fees apply).
• Ensure asbestos workers are properly trained
• Ensure asbestos inspector is certified
The CE Air Quality and Toxics Program Manager will review contractor submittals and work plans, including training certifications, for project activities that disturb asbestos containing material to ensure protection of the environment and base personnel that may be affected in the project area.
The plan may be referred back to the contractor for more detail through the contracting officer.
For questions contact PDEQ at 520-243-7400 or visit http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId= 54365 ,and http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId= 60135 , for further guidance.
Submit demo/abatement plans and activity permits to Contracting Office.
Contracting Office will forward copies of all documents to 355 CES Environmental
Lead-Based Paint (LBP) Determination
Testing for LBP is necessary prior to renovation, repair, demolition, sanding, sandblasting, or maintenance activities that will involve or disturb painted surfaces.
If a project has already been designed (i.e., it is not a design/build and it is not a SABER project), then DM will inform the contractor of the lead-based paint determination.
If a project is a IDIQ project or a design/build project, then the contractor is responsible for the lead-based paint determination as follows:
• LBP data may be available for review for some buildings.
Contact the CE Air Quality and Toxics Program Manager at 520-228-4885 or leah.proffitt@us.af.mil to determine if LBP data already exists for the specific building or work area.
• If data does not exist or is inadequate testing for LBP is required
• If it is determined that LBP is present above the action
Submit a copy of the LBP Survey Report to the Contracting Office.
If LBP is present, submit a copy of the LBP Removal/ Demolition Activity to the Contracting Officer.
Contracting office will forward copies of all documents to 355 CES http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=60135 http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=60135 mailto:leah.proffitt@us.af.mil
Requirement When required? What is required? Required Submission
Lead-Based Paint (LBP) Determination
(Continued)
(Continued) level AND will be disturbed, the contractor will ensure activities are performed in conformance with regulations governing lead paint in the construction industry (OSHA 29 CFR 1926.62) to ensure occupant, worker, and environmental protection. Necessary abatement and protection procedures shall be incorporated into work plans and contract documents.
Lead-Based Paint (LBP) Determination (Continued)
(Continued) The CE Air Quality and Toxics Program Manager will review contractor submittals and work plans, including training certifications, for project activities that disturb LBP to ensure protection of the environment and base personnel that may be affected in the project area. The plan may be referred back to the contractor for more detail through the contracting officer.
THE USE OF PAINT WITH A LEAD CONTENT OF 0.06% OR
GREATER IS PROHIBITED.
(Continued)
Base Civil Engineering Work Clearance Request (i.e. Dig Permit)
Prior to any excavation work, trenching, digging, or boring
Complete Blocks 1, 3, 5, 6, and 7 of the Base Civil Engineering Work Clearance Request – AF Form 103 See Appendix G.
As specified in Block 1, Form 103 must be accompanied by a drawing/sketch showing the street, cross street, building(s) if applicable, stating if the area(s) is to be excavated, trenched, dug, or bored, as well as the dimensions of the disturbed soil.
It is the responsibility of the contractor to contact Arizona Blue Stake for the marking of telephone, gas, and electric lines at 1- 800-782-5348. For additional information refer to www.azbluestake.com.
Submit two sets (electronic submittal if possible) of the request (each set to contain AF Form 103 and the location drawing) to Civil Engineering Operations Flight (228-3171) for processing/approval. E-mail to 355CES.Customer.Service @us.af.mil
Work shall not begin without an approved AF Form 103.
Construction and Demolition (C&D) Debris Diversion Plan
Always At least 7 days after NTP, submit the C&D Debris Diversion Plan – this plan describes how the contractor will recycle (or dispose) of scrap metal, concrete, wood, green waste, garbage, etc.
Note: DoD Instructions, CFR, Executive Orders, and the Air Force require recycling.
Refer to Appendix B for guidance.
Submit the C&D Debris Diversion Plan to the Contracting Office.
Contracting Office will forward copies of all C&D plans to 355 CES http://www.azbluestake.com/
Requirement When required? What is required? Required Submission
Air Quality Activity Permit for dust control
Land stripping and/or earthmoving (greater than 1 acre); trenching (greater than 300 feet); road construction (greater than 50 feet);
abrasive blasting, crushing/screening, etc.
Submit an Air Quality Activity Application to PDEQ. Obtain Air Quality Activity Permit from PDEQ.
See Appendix I
Refer to http://www.deq.pima.gov/air/FugitiveDustProgram.htm for guidance on permit requirement and fee schedule.
Submit a copy of the permit obtained from PDEQ to Contracting Office.
Contracting Office will forward copies of permits to 355 CES Environmental
Minimize organic solvent emissions from outdoor spray paint operations
Always (unless architectural coating or spot painting exemption)
Conduct operation in an enclosed area equipped with controls to contain no less than 96% of the overspray.
Submit a copy of the exemption obtained from PDEQ to the Contracting Office.
Notice of Intent to Drill (NOI)
When drilling, deepening, modifying, capping, or abandoning a monitoring well, drinking water well, piezometer, or environmental well.
Submit a NOI to Arizona Department of Water Resources
(ADWR).
Obtain from ADWR the drilling card authorizing the drilling.
The drilling card must be kept in the possession of the driller at the well site during drilling. Drilling may not begin until the drilling card has been received. If the driller changes, the new driller cannot begin drilling until he receives a new drilling card from ADWR.
For additional information refer to the ADWR website at http://www.water.az.gov/dwr/ or the webpage - Online Filing Center for Notices of Intent to Drill Wells at www.water.az.gov/webnoi/WebNoiDll.dll/EXEC/0/15jt00q13kd nav1gw5se80v2x9q4.
Submit a copy of the NOI and the drill card to the Contracting Office.
A copy of the NOI shall be submitted to the Water Manager (x4774).
Storm Water Pollution Prevention Plan (SWPP Plan) and AZPDES General Permit for Discharges from Construction Activities
When 1 acre or more of soil disturbance
The AZPDES General Permit for Discharges from Construction Activities requires the preparation of a SWPP Plan and the submittal of a Notice of Intent (NOI) with ADEQ at least two days prior to the start of construction activities.
For additional information refer to the ADEQ Water Quality Division webpage at http://www.azdeq.gov/environ/water/index.html
Submit copy of the SWPP Plan and NOI to the Contracting Office.
A copy of the SWPP Plan and NOI shall be submitted to the Water Manager (x4774).
http://www.deq.pima.gov/air/FugitiveDustProgram.htm http://www.water.az.gov/dwr/ http://www.water.az.gov/webnoi/WebNoiDll.dll/EXEC/0/15jt00q13kdnav1gw5se80v2x9q4 http://www.water.az.gov/webnoi/WebNoiDll.dll/EXEC/0/15jt00q13kdnav1gw5se80v2x9q4 http://www.azdeq.gov/environ/water/index.html
Requirement When required? What is required? Required Submission
Permission to Use Equipment Containing Radioactive Material
And/or Permission to Use Radiation Producing Equipment
Always required if the equipment contains radioactive material (such as nuclear density gauges), and/or
Always required if the radiation producing equipment meets any of the following criteria:
a. Equipment generating radiofrequency in excess of 7 Watts and/or 1000 MHz;
b. Lasers that are class 3b or 4;
c. Ionizing radiation such as x-ray equipment for imaging;
d. Ultraviolet radiation for industrial use such as welding processes.
Submit a letter to the 355th Bioenvironmental Engineering Flight detailing the work to be done, the equipment to be used, the timeframe for the work, and POCs (including telephone numbers). A copy of the Radioactive Material License (with NRC Form 241 if it is a state license) and the contract must be attached to the letter.
The Bioenvironmental Engineering Flight will provide an approval letter regarding the use of radioactive material on DMAFB. The radioactive material or radiation producing equipment may not be brought on-base until the contractor receives an approval letter from Bioenvironmental Engineering. Surveys may be performed to ensure that general public exposure is within limits.
Submit request for the use of radioactive material and/or radiation producing equipment to Bioenvironmental Engineering.
3.4. During Construction/Performance/Demolition/Repair
Reporting of hazardous material usage
Monthly for contracts greater than 60 days
Refer to Appendix A for guidance. Submit usage information to the Contracting Office.
Asbestos Removal
If asbestos was determined to be present (renovation or demolition activities)
The Contractor must:
• Follow the requirements of the Asbestos Removal /
Demolition Activity Permit
• Ensure that asbestos waste is properly managed
• Obtain certification of asbestos removal/inspection
• Obtain third party air sample for clearance as required
Submit daily work logs, disposal tickets/manifests, certification of asbestos removal/inspection records, and air clearance sampling to Contracting Office.
Contracting Office will forward copies of all documents to 355 CES
Requirement When required? What is required? Required Submission
Proper management of waste and recyclables (hazardous waste, garbage, scrap metal, etc.)
Always Refer to Appendix C for guidance regarding Hazardous Waste, PCB waste, and Universal Waste.
For C&D waste follow the previously submitted C&D Debris Diversion Plan (refer to Appendix B).
N/A
Identification and proper management of regulated wastes (RCRA Hazardous Waste, Universal Waste, Industrial Wastes).
If potentially regulated wastes are to be generated.
Refer to Appendix C for guidance regarding Hazardous Waste, PCB waste, and Universal Waste
The contractor must:
• Identify potentially regulated wastes
• Provide copies of analytical reports, SDSs or other documents characterizing wastes as hazardous or non-hazardous to Hazardous Waste Program manager
(HWPM).
• Coordinate storage locations with the HWPM.
• Follow provisions of the D-M Hazardous Waste
Management Plan for management (closed, marked containers, no more than 55 gallons stored, etc.)
Use DM EPA ID for all RCRA and PCB waste shipments and ensure ONLY the HWPM signs the manifest.
Waste characterization documents.
For non-RCRA wastes (such as petroleum contaminated soil, lamps, batteries, etc.) submit a bill of lading showing disposal facility.
For RCRA-regulated wastes and PCBs a uniform hazardous waste manifest must be used, coordinated with the HWPM prior to off-site shipment, and be signed by the HWPM.
Reporting of recycling and disposal of construction and demolition debris
Monthly for contracts greater than 60 days
Refer to Appendix B for guidance. Submit monthly recycling and disposal numbers to the Contracting Office.
Contracting Office will forward copies of all documents to 355 CES Environmental
Dust control (Air Quality Activity Permit)
Land stripping and/or earthmoving (greater than 1 acre); trenching (greater than 300 feet); road construction (greater than 50 feet);
abrasive blasting, crushing/screening, etc.
Follow Air Quality Activity Permit (permit required prior to beginning construction activities see Appendix I).
NOTE: Pima County Department of Environmental Quality frequently performs inspections of contractor sites on DMAFB to ensure permit compliance
N/A
Requirement When required? What is required? Required Submission
Storm Water Pollution Prevention Plan
Any soil disturbance Use good engineering practices and follow a SWPP Plan and permit (submit prior to construction if applicable).
N/A
Proper management of Wastewater
Always The base maintains a discharge permit with Pima County.
Insure any discharge to the sewer meets minimum discharge limits. Clean water meeting the Stormwater exception rules should not be discharged to the sewer.
N/A
Industrial Ventilation and Confined Space
Always required for industrial ventilation systems
Contractor must ensure that the Contracting Office notifies Bioenvironmental Engineering prior to any industrial ventilation systems (systems which control a hazard) being evaluated for acceptance.
The Contractor must ensure that the Contracting Office notifies the installation Air Quality Program Manager for any installed air emission controls to ensure compliance with base air operating permits.
Bioenvironmental Engineering needs to observe or perform all tests for any new or renovated systems prior to initial start-up to determine if the system will control the hazard.
Bioenvironmental Engineering needs to be present for the tests of fan speed and rotation, and fan motor load, and needs to be present for or conduct tests for air flow in all hoods or branches.
Notify the Contracting Office to schedule close-out survey with Bioenvironmental Engineering.
Preservation of Cultural Resources
When cultural resources are discovered on work site or during construction.
Stop construction and contact the DM Environmental Office at 228-4035. The DM Environmental Office will contact the State SHPO for guidance on how to proceed. Additional archeological surveys and testing may be required. The State SHPO will review and approve all steps to mitigate the discovery.
State SHPO must be contacted.
3.5. After Construction/Performance/Demolition/Repair (Prior to Project Close-out)
Requirement When required? What is required? Required Submission
Recovered Materials Certification Upon Completion of Work
When the total contract cost is greater than $100,000
Certification statement by the contractor indicating the use of Recovered Materials as required by the contract specifications
(FAR 52.223-9).
Submit signed Certification Statement to the Contracting Office.
Storm Water Pollution Prevention Plan (SWPP Plan)
1 acre or more of soil disturbance
After completion of construction project, contractor must submit a Notice of Termination (also known as a NOT) to ADEQ. All BMPs must be removed before submitting NOT http://legacy.azdeq.gov/environ/water/permits/cgp.html
Submit NOT to ADEQ Submit copy to the Contracting Office.
Reporting of hazardous material usage
For contracts less than 60 days, report total hazardous material used during the project
Refer to Appendix A for guidance.
Submit usage information to the Contracting Office.
Contracting office will forward information to 355 CES Environmental http://legacy.azdeq.gov/environ/water/permits/cgp.html
Part 4 – Emergency Point of Contacts
For emergencies call Fire/Security and then contact the project Contracting Officer Representative (COR) before contacting any of the following. For non-emergencies contact the project COR before contacting any of the following.
DAVIS-MONTHAN AIR FORCE BASE
(All telephone numbers are 520 Area Code unless otherwise noted)
Fire/Security Forces 911/228-3333 Fire Emergency Services 228-4757 Security Forces - LE Desk (24 hours) 228-3517 Emergency Operations Center 228-7400 228-5125 355th Mission Support Group Commander 228-3555 355th Wing Command Post (24 hours) 228-7400 Base Civil Engineer 228-3401 Base Legal Office 228-3234 Base Operations (Tower Contact) 228-8833 Bioenvironmental Engineering Services (MDG Control Center) 228-2955 CE Emergency Management Flight 228-4212 228-6259 CE Service Call Desk (24 hours) 228-3171 Public Affairs 228-3407 349-0545 355th Logistics Support Squadron 228-3440 Weather 228-6014 AMARG Job Control 228-8777 AMARG Safety 228-8363 Wing Safety 228-5361
ENVIRONMENTAL POC’s Work Phone Cell Phone Chris Brewster Environmental Compliance, Chief 228-7201 423-619-4484 Pablo C. Machado POL/Tank/Spill Manager 228-5849 390-7545 John Hillman Lead Environmental Engineer 228-4829 331-1922 John R. Maisch Water Manager 228-4774 310-1347 John Hillman Haz Materials, Recycling, P2, Solid Waste 228-4829 331-1922 Kate Shore Hazardous Waste Manager 228-4840 250-4808 Leah Proffitt Air and Toxics Compliance Manager 228-4885 603-6826 Kevin Wakefield Natural/Cultural Resource Manager 228-4035 289-4603 Tim Jackson Inspections, EMS Manager/eDASH 228-5897 360-2473 Brett Francis AMARG Environmental Manager 228-8512 975-9059 Carlton Reaves AMARG RSO 228-8575 Herman Arias HAZMART 228-4006 971-6996 Jay Johnson HAZMART 228-5617 249-2898 Mike Cohen HAZMART 228-5617 358-3142
May 2019 14
OFF BASE EMERGENCY AGENCIES
HQ ACC/A7V (DSN/Commercial) 574-9310 / (757) 764-9310 ADEQ Emergency Response Unit (602) 771-2330 1-800-234-5677 DLA Energy Operations Duty Officer (703) 767-8420 National Response Center (NRC) (Emergency: Call 911) 1-800-424-8802 Pima Co. Emergency Operations Center (EOC) 520-798-0600 Tucson Fire Department 911/791-4502 Tucson Fire Department (HAZMAT) 911/791-4041
OFF Base Supplies and Contractors AZ Waste Oil Services 745-4523 Southwest Hazard Control (Contamination (Asbestos and LBP Cleanup) 622-3607 Sun West Container Co. (Container and Sorbent Delivery) 623-1516 Safety Kleen (Oil and Fuel Removal) 790-7714 Thermo Fluids (Oil and Fuel Removal) 623-1516 Waste Mgt Tucson (Roll-Off Delivery) 618-0584 Western Technology (Asbestos and Lead Based Paint Testing) 748-2262
May 2019 15
APPENDIX A
GUIDANCE FOR SUBMISSION OF SAFETY DATA SHEETS
FOR HAZARDOUS MATERIAL (HAZMAT) AND REPORTING OF HAZMAT USAGE
Hazardous Materials: A hazardous material is commonly known as a HAZMAT. OSHA defines a hazardous material as any substance to which exposure “results or may result in adverse effects on the health and safety of employees” or “any chemical which is a physical hazardous or health hazard.” There is no ‘one simple list’ of hazardous materials.
Listed below are the general categories of hazardous materials that require the submission of Safety Data Sheets (SDS) hazardous material usage reporting to the Contracting Office:
• Compressed gases (all types)
• Adhesives
• Sealants
• Paints (including aerosols)
• Lubricants / oils / fuels
• Welding materials
• Solvents
• Chemicals used in testing or as additives
• Any fluids (except water) added to machinery / government-owned or leased equipment
• Pesticides/insecticides/rodenticides
1. At least three weeks prior to the start of construction, contractors must provide:
a. SDS for each hazardous material to be used during the contract period.
b. A complete “DMAFB AF-EESOH-MIS Contractor Worksheet” included as the first page of the SDS submittal (refer to Attachment A-1).
2. After receipt/review of the “DMAFB AF-EESOH-MIS Contractor Worksheet”, and the associated SDS, DMAFB will return to the contractor the “Contractor Hazardous Material Review” sheet (refer to Attachment A- 2 for an example).
a. Depending upon the item(s) marked on the “Contractor Hazardous Material Review” sheet, the Contractor may (or may not) have additional submittal requirements.
b. If the Contractor does have additional hazardous material submittal requirements, the submittal(s) must be accomplished before the hazardous material is brought on base.
c. The contractor must receive the “Contractor Hazardous Material Review” sheet from DMAFB before the hazardous material is brought on base.
3. For those hazardous materials that will be tracked (as identified on the “Contractor Hazardous Materials Review” sheet), the following requirements apply:
a. For contracts less than 60 days, the Contractor will submit the “Contractor Hazardous Material and Usage Data” (refer to Attachment A-3) to the Contracting Office Representative prior to the start of the contracted work, and again at the completion of the contract.
b. For contracts greater than 60 days, the Contractor will submit the “Contractor Hazardous Material and Usage Data” (refer to Attachment A-3) to the Contracting Office Representative prior to the start of the contracted work, once each month of the contract, and at the completion of the contract.
If the contractor needs to bring hazardous material onto the installation that was not included in the original submittal, the contractor must submit the new information required in step 1 to the Contracting Office Representative to begin the review process identified in Step 2.
May 2019 16
APPENDIX A-1
DMAFB AF-EESOH-MIS CONTRACTOR WORKSHEET
Fill In All Information – This worksheet is to accompany your SDS submittals.
NOTE 1: Instructions are located on the back of this page.
NOTE 2: The Contracting Office will forward this worksheet and attached SDSs to the Project Inspector or QAE. The Project Inspector or QAE will then forward this worksheet and SDS to the Contractor HAZMAT Review Subcommittee
1. CONTRACTOR INFORMATION
Prime Contractor Name Subcontractor Name Contract Number Project Number Project Title Estimated Start Date (mm-dd-yyyy) Estimated Completion Date (mm-dd-yyyy)
2. MATERIAL INFORMATION / QUANTITY INFORMATION
Hazardous Material Name (be as specific as possible) Manufacturer Part # or Item # Container Type/Size
(e.g., 5-gallon pail) Est. amount to be used over duration of contract
3. PROJECT LOCATION AND PROCESS INFORMATION
Physical Location Of Project (Bldg., intersection street names, etc.)
Project Performed at (circle) Existing Facility New Structure Equipment Aircraft Outdoors Indoors Other ______
Describe the Process(es) to be Performed (e.g., spray painting, brush painting, blasting, coating, soldering, welding, construction, demolition, etc.)
Is the Hazardous Material going to be used in an area occupied by USAF military or civilians? Yes No What is the Storage Location Of Staged or Unused Materials?
4. ADDITIONAL INFORMATION (Circle the Answer That Applies)
Will a Hazardous, Universal, or PCB Waste be Generated? (See Appendix C) Yes No Waste Description & disposition (e.g., rags used to wipe off excess adhesive, empty aerosol cans, used sandpaper, etc.)
Is A Site Diagram Available? Yes No
Does the Contractor have the base procedures for reporting a spill? Yes No
5. SIGNATURES: This Submittal Cannot Be Processed Without Both a Contactor Signature and a Contracting Office Signature SUB CONTRACTOR Title: Phone: Date Printed Name Signature PRIME CONTRACTOR Title: Phone: Date Printed Name Signature CONTRACTING OFFICE Title: Phone: Date Printed Name Signature
May 2019 17
APPENDIX A-1 (continued)
DMAFB AF-EESOH-MIS CONTRACTOR WORKSHEET INSTRUCTION GUIDE
1. This information is required in order to help the DMAFB track all hazardous materials used on-base. A worksheet must be filled out for each product containing a hazardous material. All blocks must be filled in.
a. Prime Contractor Name: Fill in the name of the Prime Contractor performing the work.
b. Subcontractor Name: Fill in the name of the Subcontractor. If not applicable – use N/A.
c. Contract Number: Fill in contract number.
d. Project Number: Fill in the project number. If not applicable – use N/A.
e. Project Title: Fill in the title of the project. This is never N/A.
f. Estimated Start Date: Fill in the date the project is projected to start.
g. Estimated Completion Date: Fill in the date the project is projected to end.
2. Material Information: IMPORTANT: The information recorded in this section must match-up to the submitted SDSs. Refer to Appendix A for examples of common HAZMATs.
a. Hazardous Material Name: Fill in the name of the material to be used. Be as descriptive as possible (e.g., Hi-Gloss Latex Paint #555).
b. Manufacturer: Fill in the manufacturer’s name.
c. Part Number: Fill in the manufacturer’s part number or item number.
d. Container Type/Size: Fill in the container type (e.g., bag, bottle, can, drum, pail, etc.) and the container size (e.g., pound, pint, gallon, etc.).
e. Estimated Quantity to be used: Fill in the amount to be used throughout the duration of the project. For instance, if the project will last three months (project timeframe is recorded in Block 1) and you expect to use 100 gallons each month, then record 300 gallons.
3. Project Location and Process Information: Information about how the products will be used, what they will be used on, where the project is located, and where the materials will be stored when not in use.
a. Location of Project: Identify in the physical location of where the product will be used. Example:
Building number, intersection, street names, etc.
b. Project will be Performed at: Circle all boxes that apply which pertain to where and on what the process that use the hazardous material will occur.
c. Describe the process or process that will be performed during the duration of the work.
d. Is the area occupied by USAF military or civilians: Circle the appropriate response. For instance, if painting will be done in an occupied building – then the correct response is YES.
e. Location of Stored Materials: Identify the location of where the material will be stored when not in use.
4. Additional Information:
a. Will the project or processes used in the project create any hazardous waste, universal waste, or PCB waste? Refer to Appendix C for examples of hazardous waste, universal waste, and PCB waste. If any waste will be generated, it must be properly managed from the moment it is generated.
b. Site Diagram Available: Is a site diagram available to identify where the product(s) will be used and stored at the jobsite?
c. Spills: Does the Contractor have a listing of base procedures for reporting a spill?
5. Signatures: This submittal cannot be processed without both a Contactor Signature(s) and a Contracting
Office Signature This block must be completed and signed by both parties.
For specific projects, each month a Contractor Hazardous Material Usage Data Sheet must be completed by the contractor and submitted to the Contracting Office for any project over sixty days. Projects less than sixty days are required to turn in a usage data sheet after completion of project. The Contracting Office will forward this information to the Project Inspector or QAE, who will in turn forward the information to the Contractor HAZMAT Review Subcommittee.
May 2019 18
APPENDIX A-2
DMAFB CONTRACTOR HAZARDOUS MATERIAL REVIEW
(Example)
TO: 355 CONS/MSCA
FROM: 355 CES/CEIE (Contractor HAZMAT Review Subcommittee)
RE: CONTRACT NUMBER: PROJECT NUMBER:
DATE:
The Contractor HAZMAT Review Subcommittee has received/reviewed the attached AF-EESOH-MIS Contractor Worksheets and associated Safety Data Sheets. Documents and the attached packet may require additional action.
Please see below comments.
Comment 1 Tagged SDS(s) need replacing because it is illegible or outdated.
Comment 2 No action required these items do not require tracking in the EESOH-MIS database.
_________ Worksheets are incomplete, additional information required. See comments below.
_________ AF-EESOH-MIS Contractor Worksheets must be filled out for each attached SDS. Return worksheet and SDS to the Contracting Office for input into the EESOH-MIS database to create a hazardous material tracking account.
_________ The SDSs that were submitted have been reviewed and information entered into the hazardous materials tracking data base. The attached hazardous materials list will be the items that the Hazardous Material Office will track on a monthly basis using the Contractor Hazardous Material Usage Data worksheet. If any additional or different types of hazardous materials will be used on this or any future project, SDSs must be submitted for review.
_________ No action needed, documents are complete and will be entered into the hazardous materials tracking database.
Comment 3 Other Comments.
Comment 1A:
RAWL anchors are listed in the 3- ring binder index, but the SDS for RAWL anchors is missing. If the product is still used, include the SDS.
Comment 1B: The OXYSEAL SDS is dated 1993. This SDS is probably outdated.
Comment 1C: The Purple Rages SDS was prepared in 1990. The SDS is outdated.
Is this product still used, and if so, what is this product used for?
Comment 2:
Aside from those SDSs identified in Comment 1, no action is required for the other lists products/SDSs.
Comment 3: Reminder for any new chemicals brought on base their SDSs need to be submitted for review with the worksheet coversheets.
May 2019 19
APPENDIX A-3
CONTRACTOR HAZARDOUS MATERIAL USAGE DATA
Contractor: _____________________________________ AF-EESOH-MIS Shop Code: ___________
Contract/NKAK Number: _______________________
Location: _______________________________
The following information is required for tracking of hazardous materials on-base.
- For purchase orders/contracts LESS than six months, this form is required at start and completion of work.
- For contracts EXCEEDING six months, this form is required to be filed out monthly and completion of work.
The Contracting Office will forward it to HAZMART - Bldg. 5227, Attention: Contractor HAZMAT Review Subcommittee. This information is required in order to comply with Environmental Laws and Regulations.
Hazardous Material Name
Manufacturer Part #, NSN #, or
LPN #
Initial Quantity at the start of each project
Additional Quantity Each Month
Submitted by Contractor: ____________________________________________ Date: _________________ (Print) (Sign)
Received by Contracting Office: ______________________________________ Date: _________________ (Print) (Sign)
May 2019 20
APPENDIX B
CONSTRUCTION AND DEMOLITION (C&D) DEBRIS
DMAFB is required to report the quantity of waste landfilled and the quantity of waste recycled on a quarterly basis.
Because Construction and Demolition (C&D) debris can be a large portion of the waste generated in any quarter, DMAFB encourages the recycling of C&D debris.
Types of C&D debris include, but are not limited to:
• Aluminum cans (e.g., soda cans)
• Asphalt
• Bricks
• Cardboard
• Concrete
• Drywall
• Electrical wiring and components
• Green waste (palm fronds, scrub brush, land clearing debris, etc.)
• Landscaping stone
• Plaster
• Plumbing fixtures and piping
• Roof coverings (e.g., shingles or tiles)
• Metal scraps (from stud trim, ductwork, rebar, piping, roofing, banding, etc.)
• Wood (scrap wood)
At least 3 weeks prior to the start of construction, submit the C&D Debris Diversion Plan to the Contracting Office.
This plan describes how the contractor will recycle (or dispose) of C&D debris (refer to Attachment B-1 for an example C&D Debris Diversion Plan).
For contracts less than 60 days, the Contractor will submit the “Summary of C&D Debris Recycling and Landfilling” (refer to Attachment B-2) to the Contracting Office prior to the start of the contracted work, and again at the completion of the contract.
For contracts greater than 60 days, the Contractor will submit the “Summary of C&D Debris Recycling and Landfilling” (refer to Attachment B-2) to the Contracting Office prior to the start of the contracted work, each month of the contract, and at the completion of the contract.
It is acceptable to combine the table included in the C&D Debris Diversion Plan and the monthly reporting requirements into one, comprehensive table (as shown in Attachment B-2). For a blank copy of Attachment B-2 visit Integrated Solid Waste webpage on eDASH (the link to eDASH can be found in Attachment G), or ask the Pollution Prevention Manager.
May 2019 21
APPENDIX B-1
SUBMITTAL EXAMPLE
C&D DEBRIS DIVERSION PLAN
Project Number and Title: FBVN06-A601, Demolish Dormitory
Project Waste Management Coordinator(s): Ms. Jane Doe, Mr. John Smith
Waste Management Project Guidelines
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following proper storage and handling procedures to reduce damaged, expired, and broken materials, and reusing materials wherever possible. Waste materials generated shall be salvaged for donation or resale, or separated for recycling to the extent that is economically feasible.
2. The Waste Management Chart (below) identifies the waste materials expected to be generated on this project, the disposal method for each material, and any handling requirements.
3. Waste diversion activities will be discussed at each safety meeting. Each contractor and subcontractor will receive this WMP and be provided a tour of the job site and shown the containers to be used for recycling or disposal. Each subcontractor will be expected to make sure all work crews comply with the WMP. All containers will be clearly labeled and lists of accepted/unaccepted materials will be posted throughout the site.
Material Anticipated
Quantity for the project
Recycling or Disposal Method Handling Procedure (Good Housekeeping)
Wood cabinets
20 ea.
Donated to ‘Help for the Homeless’ Ensure cabinets are not damaged at job site while awaiting transport to donation store.
Green waste (brush)
2 tons
John and Jack’s Crushing Company (to be mulched for reused/resale)
Avoid contamination of green waste with other construction debris
Scrap metal (steel window frames, copper pipe, etc.)
0.5 tons
Western Iron and Metal
Deposit all metals in roll-off labeled “Scrap metal”
Concrete
10 tons
Road base Material Recycling (to be crushed for reuse/resale)
To be collected in piles then trucked to the recycling facility
Clean asphalt
0.5 tons
Dee’s Inert Landfill
To be trucked to the landfill on the day that it is removed
Aluminum soda cans
10 lbs
Pima County Transfer Station
Avoid contamination of cans with garbage
Remaining wastes (e.g., garbage and material that cannot be recycled)
8 tons
COT Los Reales Landfill
Keep job site free of windblown debris. Remove garbage daily.
APPENDIX C
HAZARDOUS, PCB, AND UNIVERSAL WASTE:
PROPER MANAGEMENT AND DISPOSAL
Hazardous Waste, PCB, and Universal Waste: The Contractor is required to manage and dispose of hazardous waste, PCB waste, and universal waste in accordance with local, state, and federal laws. It is the Contractor’s responsibility to determine whether any of these wastes will be generated by a particular project and to properly manage such wastes.
Listed below are examples of wastes which can be hazardous waste (this list is not all inclusive):
• Acids or caustics
• Adhesives, caulks, roofing cements
• Empty aerosol cans
• Items that contain lead (such as lead flashing, lead solder, lead-based paint chips)
• Items that contain mercury (such as mercury switches, mercury thermostats, fluorescent bulbs)
• Paints, varnishes, and sealers
• Pesticides, insecticides, and rodenticides
• Waste solvents, thinners, cleaners, and fuels
• Sandpaper, sand blasting residue
• Rags, gloves, coveralls, masking paper contaminated with hazardous materials.
The following table presents a list of questions that the Contractor may use to help identify whether their work will be generating a hazardous, PCB, or universal waste (these questions are not all inclusive).
What processes will be performed during the project?
Potential Regulated Waste
Will any paint be chipped, sanded, abraded, or chemically removed?
• Many paints and primers contain lead, cadmium, or chromium, and these paint residues and sandpaper may be RCRA toxic for heavy metals.
Will any flammable paints, varnishes, cements, adhesives, or other coatings be used?
• Many flammable coatings & adhesives contain methyl ethyl ketone (synonyms are MEK & 2-butanone) and brushes, rags, etc. contaminated with these may be RCRA toxic for MEK.
• Additionally, if these are to be disposed in liquid form they may be RCRA ignitable.
Will any chemicals be used to clean or strip surfaces?
• Many solvents (e.g., chlorinated solvents, benzene, toluene, MEK, xylene, etc.) are hazardous and the stripping residues along with rags and applicators may be RCRA listed spent solvent wastes.
• Corrosive strippers (acids, alkalis, etc.) may be RCRA corrosive if disposed in liquid form.
• Depending on what is being removed, the residues may also contain RCRA toxic heavy metals.
Will any aerosol cans be used?
• Empty aerosol cans are regulated as RCRA reactive.
• Non-empty aerosol cans that are disposed may also be RCRA ignitable.
Will any fluorescent lamps be removed?
• Fluorescent lamps contain mercury and are regulated as Universal Waste (No Bulbs may be disposed of in trash receptacles).
Will any electronic equipment be removed (equipment containing circuit boards, switches, thermostats, transformers, soldered parts, CRTs, etc.)?
• Some types of equipment may contain heavy metals and be RCRA toxic for mercury, lead, or silver.
• Transformers and lamp ballasts may contain Polychlorinated Biphenyls (PCBs).
• Some types of equipment may contain batteries that have RCRA toxic metals or are RCRA corrosive or are regulated as Universal Waste.
Will all unused hazardous materials be removed by the contractor at job completion?
• Full or partially full containers that are to be disposed may be RCRA wastes.
RCRA wastes must be removed by a licensed hazardous waste transporter and accompanied by a hazardous waste manifest.
May 2019 23
APPENDIX D
INVESTIGATION DERIVED WASTE (IDW)
PROPER MANAGEMENT AND DISPOSAL
Investigation-derived waste (IDW) is often generated during environmental investigation field work. IDW can include (but is not limited to) drill cuttings, excess soil sampling material, and concrete fragments or building materials encountered during investigation activities. IDW also includes personal protective equipment (PPE), and sampling equipment decontamination wash waters and rinse waters.
IDW – Proper Management IDW must be properly managed from the moment of generation. IDW may be accumulated/collected in roll-off bins or drums (as appropriate). Bins must be covered to prevent stormwater intrusion and to prevent IDW from becoming windblown. Alternatively, it is permissible to lay down plastic sheeting (with bermed sides) on which the IDW can be placed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .