| File | Type | Posted |
|---|---|---|
| 12) SF 30 Amendment 2.pdf | ||
| 5) IDIQ Bid Schedule - fillable 26 Apr.xlsx | XLSX spreadsheet | |
| 10) Q and A LOG.xlsx | XLSX spreadsheet | |
| 11) SF 30 Amendment 1.pdf | ||
| 1) Template of Contractor EAL.xls | XLS spreadsheet | |
| 4) Paving IDIQ Estimate of Quantities.pdf | ||
| 7) Contractor Environmental Guide_2019.pdf | ||
| 6) DMAFB Design Guide.pdf | ||
| 3) DMAFB Paving IDIQ Specifications.pdf | ||
| Solicitation - FA487721B0004.pdf | ||
| 9) Use of Masks on Military Installations.PDF | ||
| 8) COVID-19 Face Covering Fact sheet.pdf | ||
| 2) WD-AZ20210008 (1 Jan 21).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period Totals
| ITEM NO | DESCRIPTION | EST AMOUNT | |
| 0001 | First Year of Ordering Period | $0.00 | |
| 0002 | First Task Order | $2,000.00 | Pre priced Pre Construction Meeting. This will serve as the minimum order amount for the contract and will automatically be added to each bidders bid. |
| Second Year of Ordering Period | $0.00 | ||
| Third Year of Ordering Period | $0.00 | ||
| Fourth Year of Ordering Period | $0.00 | ||
| Fifth Year of Ordering Period | $0.00 |
TOTAL $2,000.00
Instructions: Fill out your unit prices in the highlighted columns for each of the 5 years in the below tabs
Davis-Monthan Paving IDIQ Bid Schedule First Year of Ordering Period Page &P of &N
Page &P of &N
Year 1 Title: Paving IDIQ
| ITEM NO | DESCRIPTION | UNIT | EST QTY | UNIT PRICE | EST AMOUNT | |
| 0001 | First Year of Ordering Period | |||||
| Date of award through one calendar year, Contractor shall furnish all labor and materials and perform all operations necessary to repair base roads and parking lots at Davis-Monthan AFB, Arizona, in strict accordance with the Davis-Monthan Paving IDIQ Technical Specifications dated 31 August 2020 subject to the terms and conditions of the Contract Documents. | * only fill in the highlighted cells | |||||
| 0001AA | Mobilization and Demobilization (Light Equipment) | EA | 38 | $0.00 | ||
| 0001AB | Mobilization and Demobilization (Medium Equipment) | EA | 15 | $0.00 | ||
| 0001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 10 | $0.00 | ||
| 0001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 1 | $0.00 | ||
| 0001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 16,400 | $0.00 | ||
| 0001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 1,600 | $0.00 | ||
| 0001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 1,000 | $0.00 | ||
| 0001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 500 | $0.00 | ||
| 0001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 10 | $0.00 | ||
| 0001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 0001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 136 | $0.00 | ||
| 0001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 0001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 6 | $0.00 | ||
| 0001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 1,366 | $0.00 | ||
| 0001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 9 | $0.00 | ||
| 0001AP | Excavation | CY | 4,460 | $0.00 | ||
| 0001AQ | Hauling - on-base (4 mile round trip) | CY | 1,220 | $0.00 | ||
| 0001AR | Hauling - off-base | CY | 5,320 | $0.00 | ||
| 0001AS | Embankment | CY | 240 | $0.00 | ||
| 0001AT | Clean Fill | CY | 24 | $0.00 | ||
| 0001AU | Surveying - 1 Man Crew | HR | 20 | $0.00 | ||
| 0001AV | Surveying - 2 Man Crew | HR | 115 | $0.00 | ||
| 0001AW | Surface Preparation | SY | 19,200 | $0.00 | ||
| 0001AX | Concrete Curb & Gutter | LF | 20 | $0.00 | ||
| 0001AY | Concrete Vertical Curb | LF | 1,600 | $0.00 | ||
| 0001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 100 | $0.00 | ||
| 0001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 1,200 | $0.00 | ||
| 0001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 5 | $0.00 | ||
| 0001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 3 | $0.00 | ||
| 0001BD | Aggregate Base Course | CY | 3,484 | $0.00 | ||
| 0001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 60 | $0.00 | ||
| 0001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 200 | $0.00 | ||
| 0001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 40 | $0.00 | ||
| 0001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 300 | $0.00 | ||
| 0001BI | Bituminous Surface Course (2") | SY | 2,800 | $0.00 | ||
| 0001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 6,400 | $0.00 | ||
| 0001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 13,000 | $0.00 | ||
| 0001BL | Adjust Manhole Frame and Cover to Grade | EA | 2 | $0.00 | ||
| 0001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 4 | $0.00 | ||
| 0001BN | Crack Seal Asphalt Pavement | LF | 200 | $0.00 | ||
| 0001BO | Fog Seal Asphalt Pavement | SY | 17,450 | $0.00 | ||
| 0001BP | Painted Reflective Pavement Markings | SF | 12,470 | $0.00 | ||
| 0001BQ | Painted Non-Reflective Pavement Markings | SF | 580 | $0.00 | ||
| 0001BR | Thermoplastic Tape Striping (4" wide) | LF | 40 | $0.00 | ||
| 0001BS | Traffic Sign Installation | EA | 8 | $0.00 | ||
| 0001BT | Raised Reflective Pavement Markers | EA | 10 | $0.00 | ||
| 0001BU | Curb Mounted Reserved Parking Sign | EA | 4 | $0.00 | ||
| 0001BV | Concrete Drainage Structure | CY | 4 | $0.00 | ||
| 0001BW | 6-Inch Thick Concrete Slab (3000 psi) | CY | 10 | $0.00 | ||
| 0001BX | 8-Inch Thick Concrete Slab (4000 psi) | CY | 5 | $0.00 | ||
| 0001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2 | $0.00 | ||
| 0001BZ | 18-Inch Diameter CMP Culvert | LF | 6 | $0.00 | ||
| 0001CA | 12-Inch Diameter RCP Culvert | LF | 6 | $0.00 | ||
| 0001CB | Hand Digging | MH | 35 | $0.00 | ||
| 0001CC | Rock, Rip Rap | CY | 4 | $0.00 | ||
| 0001CD | Decomposed Granite Ground Cover | SY | 264 | $0.00 | ||
| 0001CE | Concrete Testing | EA | 4 | $0.00 | ||
| 0001CF | Aggregate Base Material Sieve Analysis | EA | 6 | $0.00 | ||
| 0001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 58 | $0.00 | ||
| 0001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 32 | $0.00 | ||
| 0001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 7 | $0.00 | ||
| 0001CJ | Traffic Control | Day | 414 | $0.00 | ||
| 0001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 50 | $0.00 | ||
| 0001CL | 1-Inch by 20-Inch Dowel Bars | EA | 120 | $0.00 | ||
| 0001CM | Concrete Spall Repair | SF | 200 | $0.00 | ||
| 0001CN | Reseal Concrete Pavement Joints | LF | 400 | $0.00 | ||
| 0001CO | Concrete Pavement Crack Repair | LF | 240 | $0.00 | ||
| 0001CP | Airfield Pavement Paint Removal | SF | 7,000 | $0.00 | ||
| 0001CQ | Airfield Pavement Reflective Paint Application | SF | 14,400 | $0.00 | ||
| 0001CR | Airfield Pavement Non-Reflective Paint Application | SF | 4,800 | $0.00 | ||
| 0001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 70 | $0.00 | ||
| 0001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 70 | $0.00 | ||
| 0001CU | Supervision | Day | 150 | $0.00 |
TOTAL $0.00
Davis-Monthan Paving IDIQ Bid Schedule First Year of Ordering Period Page &P of &N
Year 2 Title: Paving IDIQ
| ITEM NO | DESCRIPTION | UNIT | EST QTY | UNIT PRICE | EST AMOUNT | |
| 1001 | Second Year of Ordering Period | |||||
| Following the end of the first calendar year of the contract ordering period through one subsequent calendar year, Contractor shall furnish all labor and materials and perform all operations necessary to repair base roads and parking lots at Davis-Monthan AFB, Arizona, in strict accordance with the Davis-Monthan Paving IDIQ Technical Specifications dated 31 August 2020 subject to the terms and conditions of the Contract Documents. | * only fill in the highlighted cells | |||||
| 1001AA | Mobilization and Demobilization (Light Equipment) | EA | 38 | $0.00 | ||
| 1001AB | Mobilization and Demobilization (Medium Equipment) | EA | 15 | $0.00 | ||
| 1001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 10 | $0.00 | ||
| 1001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 1 | $0.00 | ||
| 1001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 16,400 | $0.00 | ||
| 1001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 1,600 | $0.00 | ||
| 1001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 1,000 | $0.00 | ||
| 1001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 500 | $0.00 | ||
| 1001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 10 | $0.00 | ||
| 1001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 1001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 136 | $0.00 | ||
| 1001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 1001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 6 | $0.00 | ||
| 1001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 1,366 | $0.00 | ||
| 1001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 9 | $0.00 | ||
| 1001AP | Excavation | CY | 4,460 | $0.00 | ||
| 1001AQ | Hauling - on-base (4 mile round trip) | CY | 1,220 | $0.00 | ||
| 1001AR | Hauling - off-base | CY | 5,320 | $0.00 | ||
| 1001AS | Embankment | CY | 240 | $0.00 | ||
| 1001AT | Clean Fill | CY | 24 | $0.00 | ||
| 1001AU | Surveying - 1 Man Crew | HR | 20 | $0.00 | ||
| 1001AV | Surveying - 2 Man Crew | HR | 115 | $0.00 | ||
| 1001AW | Surface Preparation | SY | 19,200 | $0.00 | ||
| 1001AX | Concrete Curb & Gutter | LF | 20 | $0.00 | ||
| 1001AY | Concrete Vertical Curb | LF | 1,600 | $0.00 | ||
| 1001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 100 | $0.00 | ||
| 1001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 1,200 | $0.00 | ||
| 1001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 5 | $0.00 | ||
| 1001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 3 | $0.00 | ||
| 1001BD | Aggregate Base Course | CY | 3,484 | $0.00 | ||
| 1001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 60 | $0.00 | ||
| 1001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 200 | $0.00 | ||
| 1001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 40 | $0.00 | ||
| 1001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 300 | $0.00 | ||
| 1001BI | Bituminous Surface Course (2") | SY | 2,800 | $0.00 | ||
| 1001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 6,400 | $0.00 | ||
| 1001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 13,000 | $0.00 | ||
| 1001BL | Adjust Manhole Frame and Cover to Grade | EA | 2 | $0.00 | ||
| 1001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 4 | $0.00 | ||
| 1001BN | Crack Seal Asphalt Pavement | LF | 200 | $0.00 | ||
| 1001BO | Fog Seal Asphalt Pavement | SY | 17,450 | $0.00 | ||
| 1001BP | Painted Reflective Pavement Markings | SF | 12,470 | $0.00 | ||
| 1001BQ | Painted Non-Reflective Pavement Markings | SF | 580 | $0.00 | ||
| 1001BR | Thermoplastic Tape Striping (4" wide) | LF | 40 | $0.00 | ||
| 1001BS | Traffic Sign Installation | EA | 8 | $0.00 | ||
| 1001BT | Raised Reflective Pavement Markers | EA | 10 | $0.00 | ||
| 1001BU | Curb Mounted Reserved Parking Sign | EA | 4 | $0.00 | ||
| 1001BV | Concrete Drainage Structure | CY | 4 | $0.00 | ||
| 1001BW | 6-Inch Thick Concrete Slab (3000 psi) | CY | 10 | $0.00 | ||
| 1001BX | 8-Inch Thick Concrete Slab (4000 psi) | CY | 5 | $0.00 | ||
| 1001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2 | $0.00 | ||
| 1001BZ | 18-Inch Diameter CMP Culvert | LF | 6 | $0.00 | ||
| 1001CA | 12-Inch Diameter RCP Culvert | LF | 6 | $0.00 | ||
| 1001CB | Hand Digging | MH | 35 | $0.00 | ||
| 1001CC | Rock, Rip Rap | CY | 4 | $0.00 | ||
| 1001CD | Decomposed Granite Ground Cover | SY | 264 | $0.00 | ||
| 1001CE | Concrete Testing | EA | 4 | $0.00 | ||
| 1001CF | Aggregate Base Material Sieve Analysis | EA | 6 | $0.00 | ||
| 1001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 58 | $0.00 | ||
| 1001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 32 | $0.00 | ||
| 1001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 7 | $0.00 | ||
| 1001CJ | Traffic Control | Day | 414 | $0.00 | ||
| 1001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 50 | $0.00 | ||
| 1001CL | 1-Inch by 20-Inch Dowel Bars | EA | 120 | $0.00 | ||
| 1001CM | Concrete Spall Repair | SF | 200 | $0.00 | ||
| 1001CN | Reseal Concrete Pavement Joints | LF | 400 | $0.00 | ||
| 1001CO | Concrete Pavement Crack Repair | LF | 240 | $0.00 | ||
| 1001CP | Airfield Pavement Paint Removal | SF | 7,000 | $0.00 | ||
| 1001CQ | Airfield Pavement Reflective Paint Application | SF | 14,400 | $0.00 | ||
| 1001CR | Airfield Pavement Non-Reflective Paint Application | SF | 4,800 | $0.00 | ||
| 1001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 70 | $0.00 | ||
| 1001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 70 | $0.00 | ||
| 1001CU | Supervision | Day | 150 | $0.00 |
TOTAL $0.00
Davis-Monthan Paving IDIQ Bid Schedule Second Year of Ordering Period Page &P of &N
Year 3 Title: Paving IDIQ
| ITEM NO | DESCRIPTION | UNIT | EST QTY | UNIT PRICE | EST AMOUNT | |
| 2001 | Third Year of Ordering Period | |||||
| Following the end of the second calendar year of the contract ordering period through one subsequent calendar year, Contractor shall furnish all labor and materials and perform all operations necessary to repair base roads and parking lots at Davis-Monthan AFB, Arizona, in strict accordance with the Davis-Monthan Paving IDIQ Technical Specifications dated 31 August 2020 subject to the terms and conditions of the Contract Documents. | * only fill in the highlighted cells | |||||
| 2001AA | Mobilization and Demobilization (Light Equipment) | EA | 38 | $0.00 | ||
| 2001AB | Mobilization and Demobilization (Medium Equipment) | EA | 15 | $0.00 | ||
| 2001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 10 | $0.00 | ||
| 2001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 1 | $0.00 | ||
| 2001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 16,400 | $0.00 | ||
| 2001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 1,600 | $0.00 | ||
| 2001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 1,000 | $0.00 | ||
| 2001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 500 | $0.00 | ||
| 2001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 10 | $0.00 | ||
| 2001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 2001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 136 | $0.00 | ||
| 2001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 2001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 6 | $0.00 | ||
| 2001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 1,366 | $0.00 | ||
| 2001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 9 | $0.00 | ||
| 2001AP | Excavation | CY | 4,460 | $0.00 | ||
| 2001AQ | Hauling - on-base (4 mile round trip) | CY | 1,220 | $0.00 | ||
| 2001AR | Hauling - off-base | CY | 5,320 | $0.00 | ||
| 2001AS | Embankment | CY | 240 | $0.00 | ||
| 2001AT | Clean Fill | CY | 24 | $0.00 | ||
| 2001AU | Surveying - 1 Man Crew | HR | 20 | $0.00 | ||
| 2001AV | Surveying - 2 Man Crew | HR | 115 | $0.00 | ||
| 2001AW | Surface Preparation | SY | 19,200 | $0.00 | ||
| 2001AX | Concrete Curb & Gutter | LF | 20 | $0.00 | ||
| 2001AY | Concrete Vertical Curb | LF | 1,600 | $0.00 | ||
| 2001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 100 | $0.00 | ||
| 2001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 1,200 | $0.00 | ||
| 2001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 5 | $0.00 | ||
| 2001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 3 | $0.00 | ||
| 2001BD | Aggregate Base Course | CY | 3,484 | $0.00 | ||
| 2001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 60 | $0.00 | ||
| 2001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 200 | $0.00 | ||
| 2001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 40 | $0.00 | ||
| 2001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 300 | $0.00 | ||
| 2001BI | Bituminous Surface Course (2") | SY | 2,800 | $0.00 | ||
| 2001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 6,400 | $0.00 | ||
| 2001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 13,000 | $0.00 | ||
| 2001BL | Adjust Manhole Frame and Cover to Grade | EA | 2 | $0.00 | ||
| 2001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 4 | $0.00 | ||
| 2001BN | Crack Seal Asphalt Pavement | LF | 200 | $0.00 | ||
| 2001BO | Fog Seal Asphalt Pavement | SY | 17,450 | $0.00 | ||
| 2001BP | Painted Reflective Pavement Markings | SF | 12,470 | $0.00 | ||
| 2001BQ | Painted Non-Reflective Pavement Markings | SF | 580 | $0.00 | ||
| 2001BR | Thermoplastic Tape Striping (4" wide) | LF | 40 | $0.00 | ||
| 2001BS | Traffic Sign Installation | EA | 8 | $0.00 | ||
| 2001BT | Raised Reflective Pavement Markers | EA | 10 | $0.00 | ||
| 2001BU | Curb Mounted Reserved Parking Sign | EA | 4 | $0.00 | ||
| 2001BV | Concrete Drainage Structure | CY | 4 | $0.00 | ||
| 2001BW | 6-Inch Thick Concrete Slab (3000 psi) | CY | 10 | $0.00 | ||
| 2001BX | 8-Inch Thick Concrete Slab (4000 psi) | CY | 5 | $0.00 | ||
| 2001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2 | $0.00 | ||
| 2001BZ | 18-Inch Diameter CMP Culvert | LF | 6 | $0.00 | ||
| 2001CA | 12-Inch Diameter RCP Culvert | LF | 6 | $0.00 | ||
| 2001CB | Hand Digging | MH | 35 | $0.00 | ||
| 2001CC | Rock, Rip Rap | CY | 4 | $0.00 | ||
| 2001CD | Decomposed Granite Ground Cover | SY | 264 | $0.00 | ||
| 2001CE | Concrete Testing | EA | 4 | $0.00 | ||
| 2001CF | Aggregate Base Material Sieve Analysis | EA | 6 | $0.00 | ||
| 2001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 58 | $0.00 | ||
| 2001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 32 | $0.00 | ||
| 2001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 7 | $0.00 | ||
| 2001CJ | Traffic Control | Day | 414 | $0.00 | ||
| 2001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 50 | $0.00 | ||
| 2001CL | 1-Inch by 20-Inch Dowel Bars | EA | 120 | $0.00 | ||
| 2001CM | Concrete Spall Repair | SF | 200 | $0.00 | ||
| 2001CN | Reseal Concrete Pavement Joints | LF | 400 | $0.00 | ||
| 2001CO | Concrete Pavement Crack Repair | LF | 240 | $0.00 | ||
| 2001CP | Airfield Pavement Paint Removal | SF | 7,000 | $0.00 | ||
| 2001CQ | Airfield Pavement Reflective Paint Application | SF | 14,400 | $0.00 | ||
| 2001CR | Airfield Pavement Non-Reflective Paint Application | SF | 4,800 | $0.00 | ||
| 2001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 70 | $0.00 | ||
| 2001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 70 | $0.00 | ||
| 2001CU | Supervision | Day | 150 | $0.00 |
TOTAL $0.00
Davis-Monthan Paving IDIQ Bid Schedule Third Year of Ordering Period Page &P of &N
Year 4 Title: Paving IDIQ
| ITEM NO | DESCRIPTION | UNIT | EST QTY | UNIT PRICE | EST AMOUNT | |
| 3001 | Fourth Year of Ordering Period | |||||
| Following the end of the third calendar year of the contract ordering period through one subsequent calendar year, Contractor shall furnish all labor and materials and perform all operations necessary to repair base roads and parking lots at Davis-Monthan AFB, Arizona, in strict accordance with the Davis-Monthan Paving IDIQ Technical Specifications dated 31 August 2020 subject to the terms and conditions of the Contract Documents. | * only fill in the highlighted cells | |||||
| 3001AA | Mobilization and Demobilization (Light Equipment) | EA | 38 | $0.00 | ||
| 3001AB | Mobilization and Demobilization (Medium Equipment) | EA | 15 | $0.00 | ||
| 3001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 10 | $0.00 | ||
| 3001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 1 | $0.00 | ||
| 3001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 16,400 | $0.00 | ||
| 3001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 1,600 | $0.00 | ||
| 3001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 1,000 | $0.00 | ||
| 3001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 500 | $0.00 | ||
| 3001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 10 | $0.00 | ||
| 3001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 3001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 136 | $0.00 | ||
| 3001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 3001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 6 | $0.00 | ||
| 3001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 1,366 | $0.00 | ||
| 3001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 9 | $0.00 | ||
| 3001AP | Excavation | CY | 4,460 | $0.00 | ||
| 3001AQ | Hauling - on-base (4 mile round trip) | CY | 1,220 | $0.00 | ||
| 3001AR | Hauling - off-base | CY | 5,320 | $0.00 | ||
| 3001AS | Embankment | CY | 240 | $0.00 | ||
| 3001AT | Clean Fill | CY | 24 | $0.00 | ||
| 3001AU | Surveying - 1 Man Crew | HR | 20 | $0.00 | ||
| 3001AV | Surveying - 2 Man Crew | HR | 115 | $0.00 | ||
| 3001AW | Surface Preparation | SY | 19,200 | $0.00 | ||
| 3001AX | Concrete Curb & Gutter | LF | 20 | $0.00 | ||
| 3001AY | Concrete Vertical Curb | LF | 1,600 | $0.00 | ||
| 3001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 100 | $0.00 | ||
| 3001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 1,200 | $0.00 | ||
| 3001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 5 | $0.00 | ||
| 3001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 3 | $0.00 | ||
| 3001BD | Aggregate Base Course | CY | 3,484 | $0.00 | ||
| 3001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 60 | $0.00 | ||
| 3001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 200 | $0.00 | ||
| 3001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 40 | $0.00 | ||
| 3001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 300 | $0.00 | ||
| 3001BI | Bituminous Surface Course (2") | SY | 2,800 | $0.00 | ||
| 3001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 6,400 | $0.00 | ||
| 3001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 13,000 | $0.00 | ||
| 3001BL | Adjust Manhole Frame and Cover to Grade | EA | 2 | $0.00 | ||
| 3001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 4 | $0.00 | ||
| 3001BN | Crack Seal Asphalt Pavement | LF | 200 | $0.00 | ||
| 3001BO | Fog Seal Asphalt Pavement | SY | 17,450 | $0.00 | ||
| 3001BP | Painted Reflective Pavement Markings | SF | 12,470 | $0.00 | ||
| 3001BQ | Painted Non-Reflective Pavement Markings | SF | 580 | $0.00 | ||
| 3001BR | Thermoplastic Tape Striping (4" wide) | LF | 40 | $0.00 | ||
| 3001BS | Traffic Sign Installation | EA | 8 | $0.00 | ||
| 3001BT | Raised Reflective Pavement Markers | EA | 10 | $0.00 | ||
| 3001BU | Curb Mounted Reserved Parking Sign | EA | 4 | $0.00 | ||
| 3001BV | Concrete Drainage Structure | CY | 4 | $0.00 | ||
| 3001BW | 6-Inch Thick Concrete Slab (3000 psi) | CY | 10 | $0.00 | ||
| 3001BX | 8-Inch Thick Concrete Slab (4000 psi) | CY | 5 | $0.00 | ||
| 3001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2 | $0.00 | ||
| 3001BZ | 18-Inch Diameter CMP Culvert | LF | 6 | $0.00 | ||
| 3001CA | 12-Inch Diameter RCP Culvert | LF | 6 | $0.00 | ||
| 3001CB | Hand Digging | MH | 35 | $0.00 | ||
| 3001CC | Rock, Rip Rap | CY | 4 | $0.00 | ||
| 3001CD | Decomposed Granite Ground Cover | SY | 264 | $0.00 | ||
| 3001CE | Concrete Testing | EA | 4 | $0.00 | ||
| 3001CF | Aggregate Base Material Sieve Analysis | EA | 6 | $0.00 | ||
| 3001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 58 | $0.00 | ||
| 3001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 32 | $0.00 | ||
| 3001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 7 | $0.00 | ||
| 3001CJ | Traffic Control | Day | 414 | $0.00 | ||
| 3001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 50 | $0.00 | ||
| 3001CL | 1-Inch by 20-Inch Dowel Bars | EA | 120 | $0.00 | ||
| 3001CM | Concrete Spall Repair | SF | 200 | $0.00 | ||
| 3001CN | Reseal Concrete Pavement Joints | LF | 400 | $0.00 | ||
| 3001CO | Concrete Pavement Crack Repair | LF | 240 | $0.00 | ||
| 3001CP | Airfield Pavement Paint Removal | SF | 7,000 | $0.00 | ||
| 3001CQ | Airfield Pavement Reflective Paint Application | SF | 14,400 | $0.00 | ||
| 3001CR | Airfield Pavement Non-Reflective Paint Application | SF | 4,800 | $0.00 | ||
| 3001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 70 | $0.00 | ||
| 3001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 70 | $0.00 | ||
| 3001CU | Supervision | Day | 150 | $0.00 |
TOTAL $0.00
Davis-Monthan Paving IDIQ Bid Schedule Fourth Year of Ordering Period Page &P of &N
Year 5 Title: Paving IDIQ
| ITEM NO | DESCRIPTION | UNIT | EST QTY | UNIT PRICE | EST AMOUNT | |
| 4001 | Fifth Year of Ordering Period | |||||
| Following the end of the fourth calendar year of the contract ordering period through one subsequent calendar year, Contractor shall furnish all labor and materials and perform all operations necessary to repair base roads and parking lots at Davis-Monthan AFB, Arizona, in strict accordance with the Davis-Monthan Paving IDIQ Technical Specifications dated 31 August 2020 subject to the terms and conditions of the Contract Documents. | * only fill in the highlighted cells | |||||
| 4001AA | Mobilization and Demobilization (Light Equipment) | EA | 38 | $0.00 | ||
| 4001AB | Mobilization and Demobilization (Medium Equipment) | EA | 15 | $0.00 | ||
| 4001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 10 | $0.00 | ||
| 4001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 1 | $0.00 | ||
| 4001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 16,400 | $0.00 | ||
| 4001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 1,600 | $0.00 | ||
| 4001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 1,000 | $0.00 | ||
| 4001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 500 | $0.00 | ||
| 4001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 10 | $0.00 | ||
| 4001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 4001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 136 | $0.00 | ||
| 4001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 200 | $0.00 | ||
| 4001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 6 | $0.00 | ||
| 4001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 1,366 | $0.00 | ||
| 4001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 9 | $0.00 | ||
| 4001AP | Excavation | CY | 4,460 | $0.00 | ||
| 4001AQ | Hauling - on-base (4 mile round trip) | CY | 1,220 | $0.00 | ||
| 4001AR | Hauling - off-base | CY | 5,320 | $0.00 | ||
| 4001AS | Embankment | CY | 240 | $0.00 | ||
| 4001AT | Clean Fill | CY | 24 | $0.00 | ||
| 4001AU | Surveying - 1 Man Crew | HR | 20 | $0.00 | ||
| 4001AV | Surveying - 2 Man Crew | HR | 115 | $0.00 | ||
| 4001AW | Surface Preparation | SY | 19,200 | $0.00 | ||
| 4001AX | Concrete Curb & Gutter | LF | 20 | $0.00 | ||
| 4001AY | Concrete Vertical Curb | LF | 1,600 | $0.00 | ||
| 4001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 100 | $0.00 | ||
| 4001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 1,200 | $0.00 | ||
| 4001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 5 | $0.00 | ||
| 4001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 3 | $0.00 | ||
| 4001BD | Aggregate Base Course | CY | 3,484 | $0.00 | ||
| 4001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 60 | $0.00 | ||
| 4001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 200 | $0.00 | ||
| 4001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 40 | $0.00 | ||
| 4001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 300 | $0.00 | ||
| 4001BI | Bituminous Surface Course (2") | SY | 2,800 | $0.00 | ||
| 4001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 6,400 | $0.00 | ||
| 4001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 13,000 | $0.00 | ||
| 4001BL | Adjust Manhole Frame and Cover to Grade | EA | 2 | $0.00 | ||
| 4001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 4 | $0.00 | ||
| 4001BN | Crack Seal Asphalt Pavement | LF | 200 | $0.00 | ||
| 4001BO | Fog Seal Asphalt Pavement | SY | 17,450 | $0.00 | ||
| 4001BP | Painted Reflective Pavement Markings | SF | 12,470 | $0.00 | ||
| 4001BQ | Painted Non-Reflective Pavement Markings | SF | 580 | $0.00 | ||
| 4001BR | Thermoplastic Tape Striping (4" wide) | LF | 40 | $0.00 | ||
| 4001BS | Traffic Sign Installation | EA | 8 | $0.00 | ||
| 4001BT | Raised Reflective Pavement Markers | EA | 10 | $0.00 | ||
| 4001BU | Curb Mounted Reserved Parking Sign | EA | 4 | $0.00 | ||
| 4001BV | Concrete Drainage Structure | CY | 4 | $0.00 | ||
| 4001BW | 6-Inch Thick Concrete Slab (3000 psi) | CY | 10 | $0.00 | ||
| 4001BX | 8-Inch Thick Concrete Slab (4000 psi) | CY | 5 | $0.00 | ||
| 4001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2 | $0.00 | ||
| 4001BZ | 18-Inch Diameter CMP Culvert | LF | 6 | $0.00 | ||
| 4001CA | 12-Inch Diameter RCP Culvert | LF | 6 | $0.00 | ||
| 4001CB | Hand Digging | MH | 35 | $0.00 | ||
| 4001CC | Rock, Rip Rap | CY | 4 | $0.00 | ||
| 4001CD | Decomposed Granite Ground Cover | SY | 264 | $0.00 | ||
| 4001CE | Concrete Testing | EA | 4 | $0.00 | ||
| 4001CF | Aggregate Base Material Sieve Analysis | EA | 6 | $0.00 | ||
| 4001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 58 | $0.00 | ||
| 4001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 32 | $0.00 | ||
| 4001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 7 | $0.00 | ||
| 4001CJ | Traffic Control | Day | 414 | $0.00 | ||
| 4001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 50 | $0.00 | ||
| 4001CL | 1-Inch by 20-Inch Dowel Bars | EA | 120 | $0.00 | ||
| 4001CM | Concrete Spall Repair | SF | 200 | $0.00 | ||
| 4001CN | Reseal Concrete Pavement Joints | LF | 400 | $0.00 | ||
| 4001CO | Concrete Pavement Crack Repair | LF | 240 | $0.00 | ||
| 4001CP | Airfield Pavement Paint Removal | SF | 7,000 | $0.00 | ||
| 4001CQ | Airfield Pavement Reflective Paint Application | SF | 14,400 | $0.00 | ||
| 4001CR | Airfield Pavement Non-Reflective Paint Application | SF | 4,800 | $0.00 | ||
| 4001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 70 | $0.00 | ||
| 4001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 70 | $0.00 | ||
| 4001CU | Supervision | Day | 150 | $0.00 |
TOTAL $0.00