This is a bid form for construction services submitted to Halifax Health Medical Center, a healthcare facility in Port Orange, Florida, for the replacement of one rooftop unit (RTU) at the Halifax Health Port Orange Cancer Center under project number PROJ-26-075. The solicitation requests qualified contractors to submit proposals for this HVAC replacement project. Bidders are required to submit comprehensive bid responses that include a detailed project schedule and timeline demonstrating full understanding of the scope, a Schedule of Values broken down by division with any requested allowances listed separately, and a detailed work description showing comprehension of the Scope of Work requirements. The bid must remain open for acceptance for 120 days from the bid due date, and the successful contractor must complete all work in accordance with the specifications provided in the bid solicitation and within the timeline approved by Halifax Health Medical Center.

Contractors submitting bids must include the total delivered price for the project work and acknowledge responsibility for any repair costs resulting from damages caused by trucks operating outside designated routes during construction. The bid form requires the contractor to agree to accomplish the project work as specified and to complete it within a schedule submitted for Halifax Health Medical Center review and approval. Specific pricing information, set-asides, funding sources, and award dates are not detailed in this particular bid form document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

HALIFAX HEALTH MEDICAL CENTER

BID FORM of TOTAL PROJECT COST

Invitation to Bid for Construction Services

PROJ-26-075 — PO ROC RTU #3 REPLACEMENT

I/We propose to furnish the work described below at the following delivered price:

Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.

As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.

In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.

Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.

The Contractor agrees to:

A. Hold this bid open to acceptance for 120 days from the bid due date.

B. Accomplish project work in accordance with details provided in the bid solicitation.

C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.