7-Attachment G-Total Project Cost.pdf
PDF 110 KB Posted
- Attached to
- Port Orange SPD Equipment Replacement
- Solicitation number
- PROJ-25-136
- Issued by
- Volusia County, Florida
About this file
This document is a Bid Form for Total Project Cost from Halifax Health Medical Center (HHMC) for a construction services project designated as PROJ-25-136 Port Orange SPD Equipment Replacement. The bid solicitation requires contractors to submit a comprehensive bid package including a detailed project schedule/timeline, Schedule of Values by division, and a work description demonstrating full understanding of the project scope. Bidders must hold their proposal open for 120 days from the bid due date and commit to completing the work according to a schedule approved by HHMC.
The bid form specifies that the contractor will be responsible for any facility repairs resulting from trucks traveling outside designated routes. While the total project cost is to be filled in by the bidder, the document emphasizes the need for detailed documentation, including a breakdown of project costs by division and any requested allowances. The project appears to involve equipment replacement at the Port Orange SPD (Sterile Processing Department), with an expectation that the successful bidder will provide a comprehensive and detailed approach to the project's execution.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G
HALIFAX HEALTH MEDICAL CENTER
BID FORM of TOTAL PROJECT COST
Invitation to Bid for Construction Services
PROJ-25-136 Port Orange SPD Equipment Replacement
I/We propose to furnish the work described below at the following delivered price:
Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.
As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.
In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.
Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.
The Contractor agrees to:
A. Hold this bid open to acceptance for 120 days from the bid due date.
B. Accomplish project work in accordance with details provided in the bid solicitation.
C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.
BID SUBMITTED BY: