This combined synopsis and solicitation from the Department of the Navy seeks quotations for the fabrication of various steel disposal containers. Specifically, the solicitation requests the construction of two small shear block disposal containers, ten large shear block disposal containers, and one lead screw disposal container, all fabricated from ASTM A36 steel. The deadline for submissions is February 9, 2024. Quotations will be evaluated based on technical acceptability, past performance, and pricing. Awards are reserved for small businesses with less than 750 employees. The selected contractor must meet specifications for nondestructive testing and load proof testing as outlined in the attachments. Site inspections are planned at mid-production and completion.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. -
CONTINUATION SHEET
3290V106
CONTRACT NO. -
ATTACHMENT 2
PAGE 1 OF 3N3904024C0006
NAME OF OFFER OR/CONTRACTOR
I ITEM#
SUPPLIES/SERVICES QTY U/1
LARGE SHEAR BLOCK DISPOSAL CONTAINER 10 EA
C. DESCRIPTION/SPECIFICATIONS
C.1 LARGE SHEAR BLOCK DISPOSAL CONTAINER RF-2202.
C.1.1 STEEL: ASTM-A36- 19
C.1.1 10 COMPLETE UNITS
C.1.2 MANUFACTURE IN ACCORDANCE WITH PNS 2370A0000388 REV
A. DRAWING IS ATTACHED.
C.2 PNSY PLANS TO INSPECT THE CONTAINERS AT AN APPROXIMATE
HALF WAY POINT OF CONSTRUCTION, DURING THE MAGNETIC
PARTICLE TESTING AND AT COMPLETION OF CONSTRUCTION.
C.2.1 CONTRACTOR SHALL NOTIFY PNSY WITH PROJECTED WORK
SCHEDULE. HALFWAY POINT OF CONSTRUCTION SHALL BE
DETERMINED BY THE CONTRACTOR AND PNSY AFTER AW ARD OF
CONTRACT.
C.3 PERFORM A VISUAL TEST PER A WS S 1.1/D.1. lM:2020; STRUCTURAL
WELDING CODE-STEEL; 24TH EDITION, APPROVED 19 DECEMBER
2019.
C.4 PERFORM MAGNETIC PARTICLE TESTING PER NAVSEA TECHNICAL
PUBLICATION T9074-AS-GIB-010/271 REV 1; REQUIREMENTS FOR
NONDESTUCTIVE TESTING METHODS AND MIL-STD-2035A;
NONDESTRUCTIVE TESTING ACCEPTANCE CRITERIA.
C.5
C.6
C.7
C.8
PERFORM LOAD/PROOF TEST ON SAFETY HOIST RING AND LIFTING
LUGS PER THE INSTRUCTIONS AND REQUIREMENTS OF THE
STATEMENT OF TESTS AND DRAWING. BOTH ARE ATTACHED.
GOVERNMENT INSPECTION IS REQUIRED DURING MANUFACTURE
AND PRIORTO SHIPMENT FROM THIS FACILITY. UPON RECEIPT OF
THIS ORDER, PROMPLTL Y NOTIFY THE REPRESENTATIVE OF THE
GOVERNMENT OFFICE WHO NORMALLY SERVES YOUR FACILITY SO
THAT APPROPRIATE PLANNING FOR GOVERNMENT INSPECTION CAN
BE ACCOMPLISHED. IN THE EVENT A REPRESENTATIVE OF THE
GOVERNMENT OFFICE CANNOT BE LOCATED, THE PURCHASING
AGENT SHOULD BE NOTIFIED PROMPLTL Y.
DATA REQUIREMENTS PER EXHIBIT B (DD-1423) & ATTACHMENT #2,
FOR SAFETY HOIST RING
C.7.1 CERTIFICATE OF COMPLIANCE; EXHIBIT B SEQUENCE A00l.
C.7.2 BEFORE VISUAL TEST CERTIFICATION, EXHIBIT B SEQUENCE
A002.
C.7.3 AFTER VISUAL TEST CERTIFICATION, EXHIBIT B SEQUENCE
A003.
C.7.4 BEFORE MAGNETIC PARTICLE TEST CERIFICATION, EXHIBIT B
SEQUENCE A004.
C.7.5 AFTER MAGNETIC PARTICLE TEST CERIFICATION, EXHIBIT B
SEQUENCE A005.
C.7.6 LOAD/PROOF TEST CERIFICATION, EXHIBIT B SEQUENCE A006.
DATA REQUIREMENTS PER EXHIBIT B (DD-1423) & ATTACHEMT #2,
FOR LIFTING LUGS.
C.8.1 CERTIFICATE OF COMPLIANCE; EXHIBIT A SEQUENCE A007.
C.8.2 BEFORE VISUAL TEST CERTIFICATION, EXHIBIT B SEQUENCE
A008.
C.8.3 AFTER VISUAL TEST CERTIFICATION, EXHIBIT B SEQUENCE
A009.
C.8.4 BEFORE MAGNETIC PARTICLE TEST CERTIFICATION, EXHIBIT
B SEQUENCE A0l 0.
C.8.5 AFTER MAGNETIC PARTICLE TEST CERTIFICATION, EXHIBIT B
SEQUENCE A0l 1.
C.8.6 LOAD/PROOF TEST CERIFICATION, EXHIBIT B SEQUENCE A012.
C.8.7 MATERIAL SAFETY DATA SHEETS, EXHIBIT B SEQUENCE A013.
D. PACKING/P ACKAGINGIMARK.INGS:
D.1 FOLLOWING SATISFACTORY COMPLETION OF LOAD/PROOF
TEST, PERMANENTLY MARK ITEMS AS REQUIRED PER DRAWING
AND STATEMENT OF REQUIRED TESTS.