(12) ATTACHMENT 3.pdf

PDF 61 KB Posted

Attached to
Fabrication of Screw Disposal Containers, Large & Small
Solicitation number
N3904024R0006
Issued by

About this file

This combined synopsis and solicitation document from the Department of the Navy Naval Sea Systems Command seeks quotations for the fabrication of various disposal containers. Specifically, it requires the fabrication of two small shear block disposal containers, ten large shear block disposal containers, and one lead screw disposal container, all constructed from steel meeting ASTM-A36-19 specifications. Quotations are due by February 9, 2024. The award will be made to the responsible and technically acceptable offeror submitting the lowest priced quotation. The solicitation is reserved as a 100% small business set-aside for offerors with no organizational conflicts of interest and who can meet the specifications outlined in the attached statements of work, attachments, exhibits, drawings, and certify compliance with testing requirements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3290V107 ATTACHMENT 3 REQ DOC NO. -

CONTINUATION SHEET

CONTRACT NO. - PAGE 1 OF 2N3904024C0006

NAME OF OFFER OR/CONTRACTOR

I ITEM#

SUPPLIES/SERVICES QTY U/1

LEAD SCREW DISPOSAL CONTAINER 1 EA

C. DESCRIPTION/SPECIFICATIONS

C.1 LEAD SCREW DISPOSAL CONTAINER RF-2100.

C.1.1 STEEL; ASTM-A36- 19

C.1.2 MANUFACTURED IN ACCORDANCE WITH PNS 2370Z0000137,

REV C. DRAWING IS ATTACHED.

C.2 PNSY PLANS TO INSPECT THE CONTAINERS AT AN APPROXIMATE

HALF WAY POINT OF CONSTRUCTION, DURING THE MAGNETIC

PARTICLE TESTING AND AT COMPLETION OF CONSTRUCTION.

C.2.1 CONTRACTOR SHALL NOTIFY PNSY WITH PROJECTED WORK

SCHEDULE. HALFWAY POINT OF CONSTRUCTION SHALL BE

DETERMINED BY THE CONTRACTOR AND PNSY AFTER AW ARD OF

CONTRACT.

C.3 ALL LOAD TESTING/NOT TO BE PERFORMED PRIOR TO PAINTING.

C.4 PERFORM LOAD/PROOF TEST PER THE INSTRUCTIONS AND

REQUIREMENTS OF THE STATEMENT OF TESTS AND DRAWING.

BOTH ARE ATTACHED.

C.5 PERFORM MAGNETIC PARTICLE TESTING PER NAVSEA TECHNICAL

PUBLICATION T9074-AS-GIB-010/271 REV 1; REQUIREMENTS FOR

NONDESTUCTIVE TESTING METHODS AND MIL-STD-2035A;

NONDESTRUCTIVE TESTING ACCEPTANCE CRITERIA.

C.6

C.7

GOVERNMENT INSPECTION IS REQUIRED DURING MANUFACTURE

AND PRIORTO SHIPMENT FROM THIS FACILITY. UPON RECEIPT OF

THIS ORDER, PROMPLTLY NOTIFY THE REPRESENTATIVE OF THE

GOVERNMENT OFFICE WHO NORMALLY SERVES YOUR FACILITY SO

THAT APPROPRIATE PLANNING FOR GOVERNMENT INSPECTION CAN

BE ACCOMPLISHED. IN THE EVENT A REPRESENTATIVE OF THE

GOVERNMENT OFFICE CANNOT BE LOCATED, THE PURCHASING

AGENT SHOULD BE NOTIFIED PROMPLTL Y.

DATA REQUIREMENTS PER EXHIBIT C (DD-1423) & ATTACHMENT #3.

C.7.1 CERTIFICATION OF COMPLIANCE; EXHIBIT C SEQUENCE A00l.

C.7.2 CERTIFICATE OF MAGNETIC PARTICLE TEST; EXHIBIT C

SEQUENCE A002.

C.7.3 CERTIFICATE OF LOAD/PROOF TEST; EXHIBIT C SEQUENCE

A003.

D. PERSERVATION/PACKAGING/PACKING

D.1 FOLLOWING SATISFACTORY COMPLETION OF LOAD/PROOF TEST,

PERMANENTLY MARK ITEMS AS REQUIRED PER DRAWING AND

STATEMENT OF REQUIRED TESTS.

File details come from the government source that posted it. Updated .